Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • PROJECT DEVELOPMENT PROCESSES – PATH 2 AND 3 PROJECTS – PATH 4 AND 5 PROJECTS W/ WORK PLAN 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • A PHASE II ESA IS USED TO DETERMINE THE ABSENCE OR PRESENCE OF SUSPECTED CONTAMINATION WITHIN THE ROW • DETERMINE THE WASTE CLASSIFICATION – SOLID WASTE – NON-HAZARDOUS – HAZARDOUS • MAY BE USED TO DETERMINE THE EXTENT 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA PHASE II ESA IS USED TO PROVIDE A HIGHER DEGREE OF CONFIDENCE IN REGARD TO THE ENVIRONMENTAL RISK INVOLVED IN TAKING ROW OR WHOLE PROPERTIES 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • RIGHT OF ENTRY – ODOT AND ITS CONSULTANT HAVE THE RIGHT TO ENTER THE ROW OR PROPERTIES TO CONDUCT NECESSARY TESTING • PROPERTY OWNER MUST BE NOTIFIED 48 HOURS IN ADVANCE 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • THE WORK MUST BEGIN NO MORE THAN 30 DAYS FROM THE DATE OF NOTIFICATION • THE CONSULTANT SHOULD NEVER SIGN AN ACCESS AGREEMENT WITH THE OWNER 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA WORK PLAN • INTRODUCTION • FIELD ACTIVITIES/SAMPLING PROCEDURES – – – – – – SOIL BORING/MONITORING WELL LOCATIONS SAMPLING METHODS FIELD SCREENING AND SAMPLE SELECTION ANALYTICAL METHODS QUALITY ASSURANCE / QUALITY CONTROL GEOPHYSICAL SURVEY (IF APPLICABLE) • SITE DIAGRAM – PROJECT MANAGEMENT PLAN 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • PHASE II ESA ASSESSMENT IS BASED ON AN OES IOC RECOMMENDATION FOR FURTHER ASSESSMENT – EITHER BASED ON AN APPROVED WORK PLAN; – OR, OES IOC WITH DIRECTION OF WHAT WORK TO COMPLETE 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n HEALTH AND SAFETY PLAN • A SITE SPECIFIC HEALTH AND SAFETY PLAN IS REQUIRED UNDER 29 CFR 1910.120 – THE SAFETY PLAN SHOULD NOT BE SUBMITTED TO ODOT FOR APPROVAL OR – SHOULD NOT BE INCLUDED IN THE PHASE II REPORT 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA ASSESSMENT • IN ALL CASES, THE OES IOC IS CONSIDERED THE FINAL DECISION FOR THE PHASE II ESA DOCUMENT 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • FIELD WORK – OWNER NOTIFICATION COMPLETE – OUPS AND LOCATORS NOTIFIED IN ADVANCE – ALL DIRECTION COORDINATED – AUTHORIZATION IN PLACE 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • PREFERED METHOD OF INVESTIGATION – DIRECT PUSH TECHNOLOGY • LESS WASTE GENERATION • SMALLER EQUIPMENT • FASTER – HOLLOW STEM AUGER • GENERATES LARGE AMOUNTS OF WASTE – AIR ROTORY • USED FOR DRILLING BEDROCK 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n DIRECT PUSH TECHNOLOGY 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • BORINGS – DESIGNATED LOCATIONS & DEPTH • VARIATIONS MUST BE APPROVED BY OES • MONITORING WELLS – IF REQUESTED, • PROPER DEPTH & SCREEN LENGTH • WITHIN THE FIRST WATER BEARING ZONE 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • SOIL SAMPLE COLLECTION – CONTINOUS SAMPLE COLLECTION – HIGHEST FIELD SCREEN READING • SINGLE SAMPLE PER BORING – UNLESS CHANGE HAS BEEN AUTHORIZED OR 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • PID SCREEN READING AT ZERO (0) • SIGHT AND SMELL • SOIL SAMPLE IMMEDIATELY ABOVE SOIL/GROUNDWATER INTERFACE OR • BOTTOM OF BORING 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • GROUNDWATER SAMPLING – FROM DEVELOPED WELL – PURGED WITH MINIMUM 3 WELL VOLUMES – CLEAN DISPOSIBLE BAILER – STATIC WATER LEVELS SHOULD BE COLLECTED PRIOR TO PURGING OF WELL 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • FREE PRODUCT – IF FREE PRODUCT IS FOUND DURING GROUNDWATER SAMPLING THE CONSUTANT SHOULD IMMEDIATELY NOTIFY THE DISTRICT ENVIRONMENTAL COORDINATOR OF THE SITUATION – THE OWNER OF THE PROPERTY SHOULD THEN BE NOTIFIED OF THE PRESENCE OF PRODUCT ON HIS PROPERTY 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • SAMPLE PREPARATION – PROPER SIZED LAB CONTAINERS • LABELED • PROTECTED • ICED – COMPLETED CHAIN OF CUSTODY – ALL IN ICE CHEST FOR SHIPPING 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • GEOPHYSICAL SURVEY – IF REQUESTED • TO DETERMINE PRESENCE OF STRUCTURES LIKE UNDERGROUND TANKS OR OBJECTS 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PHASE II ESA • EXCEPTIONS: – – – – NEAR SURFACE SAMPLNG SHALLOW BORINGS (SOIL ONLY) SEDIMENT SAMPLES (HAND PROBE) LAND FILL SAMPLING (OAC 3745-27-13) 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n ANALYTICAL • TYPICAL: – VOC - (SW 846 METHOD 8260) – SVOC - (SW 846 METHOD 8270) – TPH (GRO, DRO, & ORO) (METHOD 8015B) – RCRA METALs - (SW 846 METHOD 6010) 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n BORING/WELL SEALING • BORINGS: – BENTONITE PELLETS AND HYDRATION • MONITORING WELLS: – STATE COORDINATING COMMITTEE ON GROUNDWATER TECHNICAL GUILDELINES FOR SEALING UNUSED WELLS 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n REPORTING • Phase II ESA Report Requirements – – – – – Executive Summary Signature Page Introduction Background Information Geological Information, Physical Setting, Regional Hydrology 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n REPORTING – – – – – – – Geophysical Survey Discussion Field Activities and Sampling Procedures Geophysical Survey Field Screening and Sample Selection Analytical Test Results Quality Assurance/Quality Control Findings, Data Evaluation and Regulatory Interpretation 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n REPORTING – – – – – – Geophysical Survey Results Field Screening Results Boring Log Descriptions Analytical Test Results Quality Assurance/Quality Control Conclusions and Recommendations 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n REPORTING • Appendices – Project location maps (including topographic and county maps) – Diagrams with sampling locations – Potentiometric (if necessary) – Geophysical survey report – Soil boring logs 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n REPORTING – Laboratory analytical reports and chain of custody – Other regulatory reports and/or data (if necessary) 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PLAN NOTES • PCS – PETROLEUM CONTAMINATED SOIL PLAN NOTE • SOLID/HAZARDOUS WASTE PLAN NOTE • REGULATED WATER PLAN NOTE 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PLAN NOTES • PLAN NOTES ARE EITHER DEVELOPED BY OES, DISTRICT OR CONSULTANT – PLAN NOTE IS TO DESCRIBE THE MANAGEMENT OF THE MATERIALS DURING CONSTRUCTION 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n PLAN NOTES • PLAN NOTES ARE INCORPORATED INTO THE CONSTRUCTIO PLANS AS PART OF THE CONSTRUCTION CONTRACT 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n REMEDIAL DESIGN • FOR PROPERTIES WHERE CONTAMINATION IS PRESENT THEN A REMEDIAL DESIGN PLAN MAY BE DEVELOPED TO ENSURE THAT THE MATERIAL IS MANAGED CONSISTENT WITH THE APPROPRIATE ENVIRONMENTAL REGULATIONS 2014 ESA GUIDELINES Oh io D epar t men t o f Tr an s po r t at io n INVESTIGATION DERIVED WASTE • WASTE MATERIALS SHOULD BE MANAGED AND DISPOSED OF IN ACCORDANCE WITH ODOT’s REVISED GUIDANCE REGARDING MANAGEMENT OF INVESTIGATION DERIVED WASTE (APPENDIX N) 2014 ESA GUIDELINES