Land Division Regulatory Update Phillip Davis Chief, Land Division Manufacture Alabama Environmental Conference November 7, 2012 adem.alabama.gov Presentation Overview adem.alabama.gov A look at emerging issues and program changes at both the State and National level that have the potential to significantly impact regulated entities and the Land Division’s operations. adem.alabama.gov • • • • • Land Division Management Changes Solid Waste Branch: Eric Sanderson Industrial HW Branch: Chip Crockett Governmental HW Branch: Stephen Cobb Environmental Services Branch: Larry Bryant Groundwater Branch: Sonja Massey Coal Ash adem.alabama.gov • Possible regulatory outcomes National regulation under RCRA Subtitle C National regulation under RCRA Subtitle D Statutory regulation via Coal Ash Recycling and Oversight Act of 2012 (S. 3512) • Prediction ??? EPA Involvement adem.alabama.gov • EPA participation on joint/oversight hazardous waste inspections • EPA may take more enforcement leads on certain facilities with violations of federal requirements • Round 3 of the State Review Framework Enforcement data management Penalty calculations/determinations Alabama - Spring 2013 Alabama UECA Revisions adem.alabama.gov • In 2011, the Alabama Legislature exempted underground and above-ground petroleum tanks from the UECA requirements • ADEM has placed on public notice changes to Division 5 UECA regulations that exclude tanks from the Rule and that clarifies the meaning of the existing Rule • Public Hearing on regulation revisions to be held December 13 in Montgomery adem.alabama.gov Recycling Facility Regulations • Adopted in 2010 • Registrations instead of permits • Includes storage, material exposure, recordkeeping and reporting requirements • Certain exemptions based on NPDES BMP’s • Secure, confidential, on-line reporting system, ReTRAC, undergoing beta testing • Target date of January 1 for roll out Solid Waste Study adem.alabama.gov • Two-year landfill permit moratorium Enacted in 2011 Extended to May 31, 2014 in 2012 Applicability based on size and permitted volume • Charged ADEM to evaluate current solid waste permitting process • ADEM hired Auburn University to gather public and stakeholder input • Draft report anticipated in February 2013 adem.alabama.gov Questions & Comments adem.alabama.gov Contact Info adem.alabama.gov Phil Davis, Chief ADEM – Land Division (334) 271-7730 pdd@adem.state.al.us