Lee County Government Division of Natural Resources TMDL/BMAP Update November 30, 2010 Roland Ottolini, Director Lee County Division of Natural Resources Lee County Government Division of Natural Resources • Many creeks and streams in Lee County have been designated Impaired Waters by either the FDEP or USEPA and by law will have Total Maximum Daily Loads (TMDLs) for each causative pollutant •The FDEP has proceeded with adoption of TMDLs for Hendry Creek, Imperial River and the Tidal Caloosahatchee •A Basin Management Action Plan (BMAP) is established for each to allocate pollutant reductions to each stakeholder and to demonstrate how compliance will be achieved •Lee County is the major stakeholder as we hold the NPDES permit for stormwater discharges and WWTP. This permit will be amended to require projects and programs to fulfill these obligations, in 3 –five year cycles •FDEP presented the initial allocations and pollutant reductions in a workshop held on September 21 and 22, 2010 •Lee County and others have been given 60 days to review and comment BMAP Process Allocation to Stakeholders Consideration of Existing Projects Development of New Projects Monitoring Plan BMAP Documentation Hendry Creek Watershed Hendry Creek Total Loads Jurisdiction Lee Catalina Agriculture Roads Total Area (acres) 10,161 111 98 89 10,459 TOTAL Runoff TN % of (m3/yr) (lbs/yr) Total 21,159,226 68,623 97.7% 106,821 248 0.4% 113,319 668 1.0% 259,245 721 1.0% 21,638,611 70,261 100.0% Hendry Creek TMDL Requirements TMDL Based on Reference Site Analysis is 0.74 mg/l TMDL Load Results Load at 0.74 mg/l = 35,302 lb/yr Reduction is 34,960 lb/yr Background Load Jurisdiction Lee Catalina Agriculture Roads Total Area (acres) 10,161 111 98 89 10,459 Runoff TN Background (m3/yr) (lbs/yr) (lb/yr) 21,159,226 68,623 30,626 106,821 248 247 113,319 668 197 259,245 721 659 21,638,611 70,261 31,729 Background Load = Total Load from Natural Land Uses Allocation by % of NonBackground Loading Jurisdiction Lee Catalina Agriculture Roads Total Allocatible Area (acres) 10,161 111 98 89 10,459 3,573 TN Background (lbs/yr) (lb/yr) 68,623 30,626 248 247 668 197 721 659 70,261 31,729 NonPortion of Background % of NonNon% (lb/yr) Background Background Allocation Reduction 37,997 98.6% 3,523 34,149 50.2% 1 0.0% 0 247 0.6% 471 1.2% 44 241 64.0% 62 0.2% 6 665 7.8% 38,532 100.0% 3,573 35,302 49.8% Non-Background Load at TMDL = TMDL Load – Background Load = 35,302 - 31,729 = 3,573 lb/yr 1st 5-yr Load Reduction (lb/yr) 11,491 0 142 19 11,653 Hendry Creek Urban Land-use 1988-2004 Imperial River Watershed Imperial River Total Loads TOTAL Jurisdiction Lee Bonita Springs Agriculture Roads Total Area (acres) 26,101 7,150 11,597 96 44,945 Runoff (m3/yr) 53,332,952 12,582,591 17,867,195 265,607 84,048,346 TN % of (lbs/yr) Total 95,653 36.8% 43,265 16.7% 120,084 46.2% 739 0.3% 259,741 100.0% TMDL Requirements TMDL Based on Reference Site Analysis is 0.74 mg/l Calculate Load from Target Concentration Target Load: Load at 0.74 mg/l = 137,492 lbs/yr Reduction is 122,249 lbs/yr Background Load Jurisdiction Lee Bonita Springs Agriculture Roads Total Area (acres) 26,101 7,150 11,597 96 44,945 TN Background (lbs/yr) (lb/yr) 95,653 93,195 43,265 20,212 120,084 23,426 739 659 259,741 137,492 Background Load = Total Load from Natural Land Uses Allocation by % of NonBackground Loading Jurisdiction Lee Bonita Springs Agriculture Roads Total Allocatible Area (acres) 26,101 7,150 11,597 96 44,945 -374 TN Background (lbs/yr) (lb/yr) 95,653 93,195 43,265 20,212 120,084 23,426 739 659 259,741 137,492 Non-Background Load at TMDL NonPortion of 1st 5-Year Background % of NonNon% Reduction (lb/yr) Background Background Allocation Reduction (lb/yr) 2,458 2.0% 0 93,195 2.6% 819 23,053 18.9% 0 20,212 53.3% 7,684 96,658 79.1% 0 23,426 80.5% 32,219 80 0.1% 0 659 10.9% 27 122,249 100.0% 0 137,492 47.1% 40,750 = TMDL Load – Background Load = 137,492 - 137,492 = 0 Imperial River Urban Landuse 1988-2004 Caloosahatchee Estuary TMDL 3240A, 3240B, 3240C TMDL for Nutrients Causative Pollutant – Total Nitrogen (TN) Target : Seagrass light requirements in San Carlos Bay TMDL= 23% Reduction in Total Nitrogen (over the entire river basin) Caloosahatchee BMAP Current Total Load at the Estuary – 11,799,762 lbs/yr Current Load from Tidal Portion - 2,063,723 lbs/yr Required Reduction – 2.71 million pounds Target TN load at Estuary – 9,085,817 lbs/yr Summary of TMDL Existing Loading Source of Total Nitrogen Load Load (lb/yr) (tons/y) % of Total Upstream of S-79 Lake Okeechobee at TMDL Load to be Removed from Lake O NPS Loading Subtotal From S-79 6,222,155 782,224 2,731,660 9,736,039 2,822 355 1,239 4,416 52.7% 6.6% 23.2% 82.5% Estuarine (Below S-79) WWTP Loads NPS Loads Subtotal Below S-79 136,875 1,926,848 2,063,723 62 874 936 1.2% 16.3% 17.5% 11,799,762 9,085,817 2,713,945 5,352 4,121 1,231 100.0% 77.0% 23.0% Total to Estuary Load at TMDL Amount Reduced Key Stakeholders - Tidal Caloosahatchee Basin Lee County Charlotte County City of Cape Coral City of Ft. Myers East County Water Control District Lucaya CDD FDOT FDACS Background Load Existing Loading Area Name (Within Tidal Caloosahatchee Watershed) City of Cape Coral City of Fort Myers ECWCD Lucaya CCD Unincorp. Lee County Charlotte County 1 FDOT Agriculture Total Load NonNPS % of Total Average Background Total Area Background NonAnnual TN Load (Total (Acres) Loading Background Load (lb) Natural Load, (lb/yr) Load lb/yr) 36,621 360,239 185,333 11,802 168,805 102,000 32,984 140,145 106,667 134 871 620 64,304 556,429 306,000 72,097 205,952 195,654 2,256 28,635 11,333 39,048 324,076 209,333 259,247 1,785,153 1,116,941 174,906 66,805 33,478 251 250,429 10,298 17,302 114,742 668,212 26.2% 10.0% 5.0% 0.0% 37.5% 1.5% 2.6% 17.2% 100.0% Background Load = Total Load from Natural Land Uses Allocation by % of NonBackground Loading Existing Loading Area Name (Within Tidal Caloosahatchee Watershed) City of Cape Coral City of Fort Myers ECWCD Lucaya CCD Unincorp. Lee County Charlotte County 1 FDOT Agriculture Total Load Allocation by % Non-Background NPS Allocated Average Background Total Area Background Load by % Annual TN + Allocated (Acres) Loading NonLoad (lb) Load (lb/yr) Background 36,621 360,239 185,333 11,802 168,805 102,000 32,984 140,145 106,667 134 871 620 64,304 556,429 306,000 72,097 205,952 195,654 2,256 28,635 11,333 39,048 324,076 209,333 259,247 1,785,153 1,116,941 Non-Background Load at TMDL 67,434 252,768 25,757 127,757 12,907 119,574 97 717 96,552 402,552 3,970 199,625 6,671 18,004 44,239 253,572 257,627 1,374,568 Load Reduction (lb/yr) 107,472 41,049 20,571 154 153,877 6,327 10,631 70,504 % Reduction 29.8% 24.3% 14.7% 17.7% 27.7% 3.1% 37.1% 21.8% 23.0% = TMDL Load – Background Load = 1,347,568 - 1,116,941 = 257,627 !st 5-Year Load Reduction (lb/yr) 35,824 13,683 6,857 51 51,292 2,109 3,544 23,501 Areas of Urban BMPs Caloosahatchee Estuary NPS Loading - Urban BMPs In Existing Loading Area Name (Within Tidal Caloosahatchee Watershed) City of Cape Coral City of Fort Myers ECWCD Lucaya CCD Unincorp. Lee Charlotte County FDOT Agriculture Total Load 1 % of Area Total Area with Urban (Acres) BMPs 36,621 11,802 32,984 134 64,304 72,097 2,256 39,048 259,247 14.1% 19.1% 30.0% 0.0% 11.5% 0.1% Difference in Land Uses BMAP Project Credits Eligibility Dates for BMAP Load Reduction Credits are Based on the Data Period Preceding the TMDL Pounds reduced will be subtracted from the total allocation for those projects completed July 1, 2000 and later. Credit counts for treatment above and beyond permit requirements. Example 1 – BMP To Mitigate Construction Example 2 – Regional BMP Example 3 – Retrofit BMP BMAP Project Credits Projects Must Be Operated and Properly Maintained as Permitted. Operation and Maintenance records may be Requested as Part of the Project Review Process. Projects Not Operated as Permitted, Including Older Projects Not Included for Specific Credit, Could Result in Additional Reduction Requirements by the Responsible Entity. Potential Areas Where Projects May Be Best Stakeholder Projects and Management Activities PROJECTS ACTIVITIES Structural BMPs Quantifiable Load Reductions Reductions Not Currently Quantified Restoration and WQ Improvement Projects Basic Stormwater Management Program Implementation Regulations, Ordinances, and Guidelines Special Studies and Planning Efforts Streetsweeping Enhanced O&M Program Certain Agricultural BMPs Public Education and Outreach Efforts Preliminary Projects Eligible for Credit Structural BMPs (Wet Detention, Baffle Boxes, etc.) Source Controls (Street Sweeping, Education) Special Consideration: Conservation Land Purchases If Land Use Changed After Purchase Note – May be Exchange of Loading from Original Owner to New Owner Lee County Government Division of Natural Resources Cost of Compliance Removing nutrients from polluted water is proving to be especially costly in urban areas, with costs of $200-$20,000 per pound of nitrogen removed per year. Costs to meet TMDLs in Lee County will be in the multi-millions. Land availability is a major implementation constraint in urban settings. Retrofitting of older urban areas can be very expensive. Most public owned lands are road rights of way and environmental land acquisitions in the headwaters. Technology offered thus far yields very little nutrient reduction efficiency, especially TN Ten Mile Canal Filter Marsh removes an average of 4700 lbs TN/year. This project was built on 10 acres of land already owned by Lee County at a cost of $3m. This yields a cost of $638 per lb TN removed per year, not including land. At this rate, compliance with the Hendry Creek TMDL will cost $22m to meet the required 35,000 lbs/ year load reduction. For the Tidal Caloosahatchee, $98m to remove 153.877 lbs TN! Lee County Government Division of Natural Resources Questions •Does the Dissolved Oxygen (DO) standard apply to our estuaries? •Is Total Nitrogen (TN) the causative pollutant? •The State has used a reference TN concentration of 0.74 mg/l for the TMDL allocation and load reduction analysis. How can this be achieved when the Event Mean Concentrations (EMCs) for all land uses are above this rate, including wetlands? Lee County Government Division of Natural Resources Questions •What is the purpose of establishing a regulatory concentration that is less than natural conditions loading? •Are the loading projections realistic? How do they compare to actual field data? •What technologies are available to reduce TN practically and cost effectively? In retrofit scenarios? •Why should local governments and other stakeholders bear the entire burden of cleaning up developments that have been permitted and presumed in compliance with current water quality standards? Lee County Government Division of Natural Resources Recommendations • Realistic numbers representative of real problem • Give us the technology necessary to succeed • State should share the burden by taking the • • allocation of permitted projects or providing in-kind grants to implement projects to offset their impact State should support the inclusion of new coapplicants under the County’s NPDES MS4 permit for fair and equitable distribution of allocation State needs to adopt SW rules that meet the criteria