EAST TOBA & MONTROSE HYDROELECTRIC PROJECT Toba SiteEast Toba Project Overview Montrose Powerhouse Toba Inlet Powerhouse Transmission Line 2 Project Overview Toba Site 3 Environment • Installed capacity of the two projects will be 196 MW with expected average energy generation of 745 GW.h/yr. • These projects will have the potential to produce enough electricity for • 75,000 homes • will potentially displace an estimated 455,000 tonnes of greenhouse gases annually. • This is the equivalent of • taking 80,000 cars off the road per year or • planting 60,000 hectares of trees. 4 • Environmental Involvement/Challenges: – Environment – – High priority for key stakeholders (Owner, Agencies, First Nations, Local Communities) Operational Challenges – Camp Waste, Batch Plant Operations, Fuel / Oil Storage Species at Risk – goats, grizzly bears, Northern Goshawks, Marbeled Murrelets, Fish and amphibians 5 6 Schedule Construction Overview Access Roads Total access road length: 65.0 km Access road completion to date: 62.0 km Bridge completions: 52 of 58 7 Construction Overview East Toba Powerhouse Excavation volume: Concrete volume: 62,500 m3 7,900 m3 Excavation to date: 38,995 m3 8 Construction Overview East Toba Penstock Penstock length: Estimated cut: Estimated fill: 5,376 m 354,000 m3 114,000 m3 Weholite pipe section: •Total sections: 650 m, 3,048 mm ID 49 pieces Steel pipe section: •Outer diameter: •Thickness: •Total sections: 4,726 m 2,540 mm – 3,048 mm 9.7mm – 36.6mm 299 pieces To date excavation: 66,500 m3 Weholite Pipe Section Steel Pipe Section 9 Project Overview East Toba Intake Rubber dam design Intake structure: •Structural excavation: •Structural backfill: •Concrete volume: 21,000 m3 24,000 m3 2,080 m3 Diversion channel: •Excavation: •Fill: •Rip rap: •Liner: 30,000 m3 17,000 m3 14,000 m3 15,000 m2 3 m high Rubber Dam Intake Diversion Channel Earthworks 10 Project Overview Montrose Powerhouse Excavation volume: Concrete: 45,000 m3 5,800 m3 Excavation to date: 31,300 m3 11 Project Overview Montrose Penstock Penstock length: Estimated cut: Estimated fill: 4,232 m 342,000 m3 109,000 m3 Exposed penstock: •Slope: 250 m 120 % Steel pipe section: •Outer diameter: •Wall thickness: •Total welds: •Total sections: 4,232 m 2133 mm – 2743 mm 8.6 mm – 24.9 mm 3,900 kg 247 pieces To date excavation: 100,000 m3 Typical Exposed Penstock and Support Typical Exposed Penstock and Support 12 Montrose Intake Project Overview Coanda Screen Design Structural excavation: 10,500 m3 Structural backfill: 10,300 m3 Concrete Volume: 2,680 m3 Geotechnical surveyors at Intake 13 Construction Overview Mechanical Components 1 Bifurcation pipe per powerhouse 2 Turbine inlet valves (TIV) per powerhouse 2 6 nozzle scroll cases per power house 2 vertical pelton turbines per powerhouse East Toba: •78.54 MW max. rated capacity (each unit) •Head: 575.0 m Montrose: •47.13 MW max. rated capacity (each unit) •Head: 459.4 m Installation of Mechanical Components Bifurcation Pipe TIV’s and Scroll Cases 14 Transmission Line Project Overview Total length: Total structures: 156.8 km 760 ea. Excavation to date: 309 ea. Poles installed: 185 ea. Conductors installed: 4 km 15 Transmission Line : Project Overview Types of structures Metal Structure Wooden Structures Anchors 16 Equipment Major Equipment Excavators: •Cat 385 •Cat 365 •Cat 345 •JD 450 •Cat 330 1 ea 2 ea 4 ea 4 ea 3 ea Dozers: •D9 •D8 •D6 2 ea 2 ea 1 ea Rock Trucks: •Volvo A40 •Cat 740 7 ea 3 ea 17 Equipment Major Equipment Drills: •Tamrock 800 •Hoe Drill 4 ea 3 ea Loaders: •Cat 988 •Cat 980 •Cat 966 •Cat 950 1 ea 2 ea 1 ea 2 ea Crusher/Batch Plants •Portable •Track Jaw •Batch Plants 1 ea 1 ea 2 ea 18