Jon Stromsather - CIRED • International Conference on Electricity

advertisement
Frankfurt (Germany), 6-9 June 2011
ENEL Group
Italian core
European base
Worldwide
strategy
Italy’s largest power company.
Europe’s second
installed capacity
listed
Presence in
continents
countries
40
utility
by
on
ENEL Distribuzione:
33 million Customers
2nd largest DSO
in Europe
over 1.100.000 km lines
260 TWh Energy Distributed
2 million spot-lights in Public Lighting
Jon Stromsather – Italy – Round Table 6a – 0832
4
Frankfurt (Germany), 6-9 June 2011
Italian Regulatory Framework and electricity market

Full liberalization of retail electricity market from 1 July 2007.

Distribution activities are regulated: Tariff
and QoS regulation.
Currently under Third Regulatory Period
(2008-2011).
2010: AEEG approved 2% additional
WACC on selected Smart Grids pilot
projects.


TERNA (HV)
Enel
Distribuzione
(>85%)
Big
Municipalities
(Acea, etc.)
Municipalitie
s
Customers
Italy Network market structure
14%
9%
16%
61%
Generation
Distribution 10%
Transport
Metering
2%
Commercial Act.
0,5%
System
charges
Taxes
100%
TOTAL*
Jon Stromsather – Italy – Round Table 6a – 0832
Price of electricity
components (%) in
Italy 2011-1Q
Frankfurt (Germany), 6-9 June 2011
Role of DSOs in open electricity market

DSOs enable new market of services.

DSOs should not enter market of services

Play an active role in standardization, key for open
electricity market to develop.

DSO could play role of “neutral and transparent
information hub” to enable demand response.
Jon Stromsather – Italy – Round Table 6a – 0832
Frankfurt (Germany), 6-9 June 2011
Role of DSOs in Smart Grids

DSOs are strategic enablers of new Smart Grid scenario:

Manage Smart Metering infrastructure and data (Telegestore)

Enable Active Demand

Define DER connection criteria to ensure network QoS and reliability,
possibly enable ancillary services from DG and take a role in
dispatching DG on the distribution network.

Guarantee controllability of EV charging by managing/owning EV
charging stations (DSO model) or by defining connection criteria (other
models)

Possibly operate storage facilities for the management of distribution
network
Jon Stromsather – Italy – Round Table 6a – 0832
Frankfurt (Germany), 6-9 June 2011
TELEGESTORE Experience
Project
perimeter
85 % of Electricity Distribution market in Italy
127 Geographical operating units
33.000.000 LV Meters
Field
devices
358.000 LV concentrators (LV-C)
8.000 palm-PC
during massive meters replacement
Telegestore ® Project Team: 250 resources
Resources
120 ICT Project technicians
More than 3500 third-party installers
Jon Stromsather – Italy – Round Table 6a – 0832
Frankfurt (Germany), 6-9 June 2011
Other ENEL Smart Grid Projects
Europe
Italy
Integration
of DER
Energy Consumption /
efficiency
POI
Progetto Isernia
Smart
Info
Electric
mobility
e-mobility Italy
Jon Stromsather – Italy – Round Table 6a – 0832
GRID4EU
(under
negotiation)
Frankfurt (Germany), 6-9 June 2011
Expectations for the future

Increased need of DSOs to continue upgrading power
grid infrastructure.

Increased interaction with TSOs, suppliers, generators,
and market operators.

Increased role of DSOs in facilitating DER integration,
enabling Active Demand and controlling EV charging.

Increased communication efforts with customers to “sell”
benefits of Smart Grid.
Jon Stromsather – Italy – Round Table 6a – 0832