Infrastructure projects Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 April 2012 Online questionnaire Streamlined process > For every project submitted to ENTSOG for TYNDP 2011-2020, online > > questionnaire will be set with previous values as a default setting Even if answer will remain the same, promoter will have to click-submit the questionnaire Online form will ease the data process and make it more robust Updated questionnaire > Given past experience, questionnaire will be fine-tuned in order to avoid misunderstanding and lack of clarity 2 Main evolution Project capacity for modelling purpose > Key information required for modelling purpose > Intermediate entry/exit capacity is a requirement for long-haul projects > In case of different options, project promoter should identify the one to be modeled by ENTSOG Project benefits > Questions could be based on Annex IV of the EIP proposal > Promoters could be asked if they will apply for PCI status Project timeline > Mode detailed questions in order to help reader to monitor the evolution of projects from one edition to the other 3 Project stage outlook Synthetic information on project timeframe > As there is no single timeline for projects and challenging steps often differ, a > robust clustering can only be based on FID status Additional proposal is to provide a synthetic outlook of project steps highlighting: • Last completed step • Main challenge (is it possible to anticipate such difficulty?) • Remaining steps Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Project A Planned FEED Permitting Market test FID Construction Project B Planned FEED Permitting Market test FID Construction Project C Planned FEED Permitting FID Construction Project D Planned FEED Permitting Supply contract FID Construction Project E Planned FEED Supply contract FID Permitting Construction Step 7 4 Expected construction load Graphical representation of the effort > Aggregated figures on a 10-year range are not sufficient to express the expected > load in term of works Using the same data as Annex A (Infra. Projects) it is possible to give more visibility based on the construction phase of transmission lines, UGS and LNG Equivalent km 5 Thank You for Your Attention Olivier Lebois, Adviser, System Development ENTSOG -- European Network of Transmission System Operators for Gas Avenue de Cortenbergh 100, B-1000 Brussels EML: T: WWW: Olivier.Lebois@entsog.eu + 32 2 894 5105 www.entsog.eu 6