North Wales Connection - National Infrastructure Planning

advertisement
North Wales Connection
Place your chosen
image here. The four
corners must just
cover the arrow tips.
For covers, the three
pictures should be the
same size and in a
straight line.
Planning Inspectorate – National Infrastructure Directorate
17 September 2012
Agenda
Introductions
 Gavin Crook – Lead Project Manager, North Wales Connection
 Graham Denison Smith – Senior Consents Officer, North Wales Connection
 Steve Knight-Gregson – Principal Specialist Major Projects
Current Public Position
 Background / engagement to-date
 Public Messaging
 Project need
Project Launch
 Strategic options
 Preliminary preferred option
 Route and Site Options
Key project information
2
North Wales Connection
Place your chosen
image here. The four
corners must just
cover the arrow tips.
For covers, the three
pictures should be the
same size and in a
straight line.
Current Public Position
Project Need Contracted Generation
2GW 2017/2021
3.6GW –
2020/2022
1GW - 2018
4
Background / engagement to-date
Key Activities to date:
Regular Stakeholder Interfaces
 Community Survey (Jun 11)
 Monthly public drop in events supporting
Horizon.
 1st Statutory engagement Workshop
(Jul 11)
 Anglesey Show (Aug 10, 11 & 12)
 Newsletter Issued (Oct 10 & 11)
 2nd Statutory engagement
Workshop (Nov 11)
 Route corridor one-2-one’s (Feb 12)
 Stakeholder Briefings (Aug\Sept 12)
 Horizon Public Liaison Group meetings;
Presentation to Stakeholders & Interest
Groups e.g. National Farmers Union
Wales
 Energy Island Strategic Forum; strategic,
communications, consent and health &
safety workstreams.
 Bi-annual stakeholder event chaired by
DECC.
Stakeholders Include;
Welsh Assembly Government (WAG),
Department of Energy & Climate Change
(DECC), Countryside Council for Wales
(CCW), Environment Agency Wales (EAW),
Snowdonia National Park, CADW, North
Wales County Council Officers, Generators
i.e. Horizon, Celtic Array and developers i.e.
5
Land and Lakes, Skerries
Public Messaging
 National Grid Business; the electricity network in the UK
 National Grids obligations, Electricity Act 1989 duties.
‘To develop an economic, efficient & co-ordinated system of electricity transmission’
 The UK energy challenge
 Existing National Grid network in North Wales
‘Currently one double circuit 400kV overhead line between Wylfa and Pentir’
 Technologies in use and available across the network
 Connection agreements in place
‘Existing network in North Wales unable to accommodate amount of power proposed’
 Approach to strategic optioneering and consenting
‘We will present information for consultation; proposed in Autumn 2012‘.
6
North Wales Connection
Place your chosen
image here. The four
corners must just
cover the arrow tips.
For covers, the three
pictures should be the
same size and in a
straight line.
Project Launch
Strategic options
8
Preliminary preferred option
9
Corridor Options for Wylfa-Pentir
Consents:
Planning Inspectorate
Consultation Stage
One – seeking
opinion on:
Findings of SOR
•Route and crossing
preference
• Areas of sensitivity
• Consultation process
Subsequent Stages:
Announcement of
preferred route
corridor
• Route alignment
consultation
• Pre application
consultation
10
Site Options in vicinity of Bryncir
Consents:
Local Planning
Approval
Consultation Stage
One - seeking
opinion on:
• Findings of SOR
• Substation locations
•Key concerns/issues
•Consultation
process
Subsequent Stages:
Announcement of
preferred substation/
public engagement
11
Cabling across Glaslyn
Consents:
Permitted
Development
Consultation Stage
One - seeking
opinion on:
• Findings of SOR
• Route corridor and
potential route
alignment
• Issues/concerns
• Consultation process
Subsequent Stages:
• Announcement of
preferred route
alignment/public
engagement
12
North Wales Connection
Place your chosen
image here. The four
corners must just
cover the arrow tips.
For covers, the three
pictures should be the
same size and in a
straight line.
Key Project Information
Key project information
 Project Name – North Wales Connection
 Project Location – Anglesey/Gwynedd
 Grid Reference (for PINS website) – Wylfa Substation SH 35253 93797
 Project Description – Proposed 400kV electricity transmission reinforcements in North
Wales to connect planned new nuclear electricity generation on Anglesey and Irish Sea
offshore wind
 Applicant – National Grid Electricity Transmission Plc
 Contact details –
 North Wales Connection Communications Team
 Freephone number 0800 990 3567
 Email nationalgrid@northwalesconnection.com
 Web www.nationalgrid.com/northwalesconnection
 First Public Consultation dates – 3rd October 2012 to 21st December 2012
 EIA scoping date – 2013/2014
 DCO submission date – 2015