SQA’s New Approach to Quality Assurance Matthew McCullagh Quality Manager Why Have a New Approach? Review of SQA Quality Framework (2006) Continue to protect SQA’s reputation and credibility of our qualifications Feedback from Centres What is our goal? SQA should have a transparent intelligence-led, risk based model for quality assurance of centres delivering our qualifications Key Changes to our existing Approach Introduced from August 2012 onwards Supported by on-line guidance for centres Refreshed Quality Assurance Criteria Introduction of Risk Rating Introduction of Sanctions Introduction of Action Plans Refreshed Quality Assurance Reports Introduced from August 2012 onwards Initial Launch to centres in September 2011 Ongoing Support from Mary Gao Final Launch to centres in September 2012 All Quality Assurance activity follows the New Approach from then on Supported by on-line guidance for centres http://cn.sqa.org.uk/Quality_Assurance Refreshed Quality Assurance Criteria Each criterion clearly describes what a centre must do to demonstrate compliance. They are: – Organised into 5 Categories • • • • • Management of a Centre Resources Candidate Supoort Assessment and Verification Records/Data Management Refreshed Quality Assurance Criteria – Supported by examples of evidence – Graded by their importance – Linked to 4 different Quality Assurance Processes Introduction of Risk Rating EV Rationale Severe threat to integrity of assessment decisions Significant threat to integrity of assessment decisions in short-term. Moderate threat to integrity of assessment decisions in short-term and/or high threat to integrity of assessment decision in long-term. Low threat to integrity of assessment decisions in short-term and/or medium threat to integrity of assessment decisions. No identified threat to the integrity of assessment decisions. Risk Severe Systems Rationale Systemic high risk to effective support of SQA candidates Significant Localised and/or systematic high risk to effective support of SQA candidates in the short term Moderate Significant threat to effective support of SQA candidates in short-term and/or high threat to effective support of SQA candidates in long-term Low Very Low Localised low risk to effective support of SQA candidates in the short term or medium risk in the long term No identified risk to effective support of SQA candidates Introduction of Sanctions EV Sanction Risk Systems Sanction Withdrawal of specific qualification approval: by verification group by qualification Severe Suspension of specific qualification approval: by verification group by qualification Significant Withdrawal of devolved status Withdrawal of all existing specific qualification approval Suspension of specific qualification certification: by verification group by qualification Suspension of approval application by verification group Suspension of direct certification claim status: by verification group by qualification Moderate Suspension of all existing qualification approval Suspension of devolved status Suspension of centre certification Suspension of certification for all qualifications with internally assessed components Suspension of certification for all qualifications with externally assessed components Suspension of qualification approval application - whole centre Entry in Action Plan Low Very Low Withdrawal of centre approval Entry in Action Plan Refreshed Quality Assurance Reports Summary Report Introduction of Action Plans Action Plans will be generated during a visit where one or more non-compliances are identified Action points will be SMART – Specific – Measurable – Agreed – Realistic – Time-bound Introduction of Action Plans All action points are discussed and agreed with centre management during the visit All action points within an action plan are MANDATORY Failure to meet action points may result in an increased risk rating and further sanctions Refreshed Quality Assurance Reports Action Plan Summary Introduced from August 2012 onwards Supported by on-line guidance for centres Refreshed Quality Assurance Criteria Introduction of Risk Rating Introduction of Sanctions Introduction of Action Plans Refreshed Quality Assurance Reports Questions