Implementation of Darwin – ME Chris Wagner, PE July 26-29, 2010 Kansas City, MO Does SHA Use or Plan to Use MEPDG? N0 -12 YES - 40 Alaska 2007 Survey Hawaii Where are we now? • • • • State implementation activities Validation Activities Status of DARWin ME Planned Activites for DARWin ME Software Capabilities-Import Raw Data Climate: icm files Traffic: AHTD Traffic Monitoring Data 5 Software Capabilities-Traffic Data Check 6 Software Capabilities-Materials E* 7 Software Capabilities- Retrieving Data Very similar tools will be included in DARWin ME 8 Indiana DOT HMA Materials Characterization Dynamic Modulus • District - 6 • Nom Max Aggregate Size - 3 • Binder Type – 3 • Binder Characterization • 3 Binders DSR data • Traffic Data • WIM Station Data Analyzed • Load Spectra defined by Volume What to Change for Design? Sensitivity of Inputs for Concrete Roughness Faulting Percent Slabs Cracked Permanent Curl/Warp Effective Temperature Difference VS VS VS Joint Spacing VS VS VS Dowel Bar Diameter MS MS NS Pavement Thickness S MS VS Modulus of Rupture S NS VS Modulus of Elasticity S NS VS 20-year/28-day Ratio S NS VS Parameter Indiana DOT: MEPDG Guide for Designers Good Calibration and Implementation Document Montana DOT http://www.mdt.mt.gov/research/projects/pave/pave_model.shtml Major Findings: • Preservation Practice Extend Performance • Most models adequate for design • Re-calibrate unbound materials rutting 11/9/2006 12/9/2006 1/8/2007 2/7/2007 3/9/2007 4/8/2007 5/8/2007 6/7/2007 7/7/2007 8/6/2007 9/5/2007 10/5/2007 11/4/2007 12/4/2007 1/3/2008 2/2/2008 3/3/2008 4/2/2008 5/2/2008 6/1/2008 7/1/2008 7/31/2008 Rut Depth, mm Date 8.E+06 7.E+06 6.E+06 5.E+06 4.E+06 3.E+06 2.E+06 1.E+06 0.E+00 Continued MEPDG Validation ESALs at Auburn University 14.0 12.0 10.0 8.0 6.0 S11 MEPDG 4.0 2.0 0.0 Date 3/28/2009 40 12/18/2008 Measured 9/9/2008 30 6/1/2008 MEPDG 2/22/2008 35 11/14/2007 8/6/2007 4/28/2007 1/18/2007 10/10/2006 Bottom-Up Fatigue Cracking, % of Lane S11– As Built – Fatigue Cracking at Auburn University 25 20 15 10 5 0 Continued Validation at Auburn University What about Polymers? Looking at Strains Directly at Auburn University Strain Response 100% at Auburn University 90% 80% Percentile 70% Average +15 -15 N3 2003 N4 2003 N3 2006 N4 2006 60% 50% 40% Darwin-ME output 30% 20% 10% 0% 0.0 100.0 200.0 300.0 Microstrain 400.0 500.0 DARWin ME Sneak Peek DARWin ME — Improvements Redesign GUI using .NET 3.5 framework in C# • User configurable screens • Agency defined data libraries • Input control at the central office • Expansion capabilities for new analysis engines • Improved display on large or multiple monitors • Improved error handling stability and error display • Multiple project editing • Handicap accessibility options • Improved reporting (stability, speed and quality) • Utilities for importing previous version files, third party data • Multiple language extensibility Enterprise Software Material Property Inputs Traffic Error Checking Multiple Project Edit Batch Mode XML File Formats Integrated Reports DARWin ME Development Status Percent Complete, Milestones Date of Completion Kick-Off 100% User Requirements Spec & Review/Approval 100% Preliminary Design Review 100% System Requirement Spec & Review/Approval 100% Requirements Tracebility Matrix 100% Critical Design Review 100% Implementation & Integration Process Audit 40%, 7/31/10 Test Readiness Review 80%, 6/15/10 Testing Process Audit 0%, 9/30/10 Software Alpha Test 0%, 8/15/10 Software Beta Test 0%, 10/15/10 Acceptance Test 0%, 11/30/10 Release 0%, 12/31/10 DARWin ME planned activities • • • • • Unveiling Session at 2011 TRB Roll out webinar FHWA web training 2011 FHWA On-site training Traffic Workshops Indiana DOT Experience AASHTO 93 Thickness Result MEPDG Thickness Result I-465 16”-18’ PCCP 14”-18’ PCCP $1,475,000 I-465 Ramps ( ) 12.5”-18’ PCCP 11”-18’ PCCP $112,000 I-465 Ramps ( 40/Wash. St) 12.5”-18’-PCCP 12.5”-18’PCCP I-80(mainline) 16”-18’-PCCP 14”-18’-PCCP $361,000 I-80(Ramp) 12”-18’-PCCP 10.5”-18’-PCCP $520,000 SR 14 15”-HMA 13.5”-HMA $333,000 $155,440 US 231 11”-18-PCCP 10”-18’-PCCP $333,000 $0 US 231-Ramp 10”-18’-PCCP 9.5”-18’-PCCP $28,000 US 231 15.5”-HMA 13”-HMA $557,000 $0 SR 62 16”-HMA 13”-HMA $403,000 $420,548 US 231 11”-18’-PCCP 10”-18’-PCCP $178,000 $0 Road Estimated Contract Saving ($) Actual Contract Saving ($) Total Savings ($) $1,000,000 $0 $775,170 4,300,000 Evolution The MEPDG is not perfect…..BUT; The MEPDG provides a reasonable and structured platform for continuous improvement.