FINAL PRESENTATION P10714 -COOPER VISION Aditya Manjrekar Industrial and Systems Engineering KGCOE, RIT. PROJECT STATUS UPDATE Project Name Cooper Vision Project Number P10714 Project Family Lean Production Track Process Innovation Start Term 2009-1 (Fall ) for MSD1 End Term 2009-2 ( Winter) for MSD2 Faculty Guide John Kaemmerlen (ISE) Industrial Teaching Adviser Phil Bryan Faculty Consultant Andres Carrano (ISE) Primary Customer Sarah Pittman, Process Improvement Manager WHAT AM I GOING TO TALK ABOUT TODAY 1) 2) 3) 4) 5) 6) Re-visit project background and facility. Planning Concept Development. Targeted Specifications. Team Requirements and Work Breakdown. Risk Assessment. ABOUT COOPER VISION o o o o o Manufacturing prescription contact lenses for five decades America's second largest maker of prescription contact lenses and #1 maker of toric contact lenses for the correction of astigmatism. Extensive network of facilities in 12 countries across five continents with it’s headquarters at Fairport, NY . One of the highest level of on-time order fulfillment in the industry. Customers Includeo o o o Wal-Mart, Target and similar stores. Doctors and Pharmacies. Large scale Distributors like 1800-Contacts. Patients. ( Biggest Customers – teenagers and youth) DISTRIBUTION CENTER IN HENRIETTA o o o o o o 250,000 square feet The Single major Cooper-vision distribution center in the country. Very good picking system Pick to light Pick to voice. ADM-Automated Distribution machine. Carousel Picking. Totes, Boxes through conveyers , lifts and bins, Close to 400 Employees on floor and 100 staff for support. On hand inventory for any product is never zero. FACILITY LAYOUT o o o o o o o o o o o Bulk Inventory Storage Packaging Dept. ADM Receiving Pick to Light. Pick to voice. Carousel Picking Shipping White box labeling International Orders Reworking/ Returns. PLANNING o Mission Statement. :- The team aims to improve existing processes in use at the Cooper vision facility by suggesting lean system changes, software tools and recommending improvements to make the distribution center more efficient and to address the issues faced by the company and its employees. o Relevance. o o o o List of suggested 62 different improvement tasks. The customer would like to invest time and money in the MSD project to get a quality tools and tangible process improvement ideas. Some primary needs are worked on by current MSD team and next few tasks need to be completed by future teams. Some to be completed by Co-op students , full time employees. CONCEPT DEVELOPMENT List of Issues o o o o o Boxes flipping on none label on the conveyer. Un predictable daily volume of orders. Therefore a wave of labor flexing from receiving to shipping. Double handling totes during peak hours. Too many waste cardboard boxes ISSUES o o o o o Pick to Light/ Pick to Voice- Ergonomic Concerns. White Box Labelingfor brand customers. ADM Replenishment flags. Reslotting similar colored items – to reduce mistakes. Carousel Replenishment time. AFFINITY DIAGRAM Order picking Efficiency •Reduce box flipping. •Decrease double handling •Increase order picking accuracy. •Picking labels for white boxes. •Reduce reworking and returns of mistakes. Replenishment •Reslotting by frequency of pick. •Replenishment signals on ADM. •Decrease Carousel Replenishment time. Workforce Utilization •Determine daily requirement to reduce labor flexing wave. •Have work force utilization close to 100% and accommodate for growth. •Reduce Pick to light walk time and bending. Software. •Synchronize the ERP (Baan) and WMS (Red Prairie) Systems •Occasional glitches in Pick to voice system OBJECTIVE TREE FUNCTION TREE HOUSE OF QUALITY Improve Replenishment Close gap b/w Software system and real system Improve Picking system Orders need to be shipped earlier 3 7 9 We need better level of customer satisfaction 3 3 7 Labor needs to be utilized efficiently 8 9 7 The software matches real needs 3 9 8 VOC to VOE TARGET SPECIFICATIONS According to the HOQ and the • • • • • 1. 2. 3. 4. 5. Probability of success Severity / Impact to customer. Urgency according to customer Cost and time for project. Concentrate on the following needs. Reduce rework and double handling. Reduce walk time and bending. Reslotting SKUs for efficient picking. Improve White box label picking. Synchronize ERP and WMS systems. STAFFING REQUIREMENTS Industrial Engineer- Project Lead Industrial Engineer – Systems Analysis •Project Management . •Value Stream Mapping •Facilities planning •Lean initiatives for quality improvements. •Arena or other Simulation Tools. •Data Analysis.(Excel solver) •Optimization tools. •Ergonomics and Human Factors. Industrial Engineer- Facilities Management Mechanical Engineer – Mechanical •Facilities and Warehouse planning and design. •Design and Analysis of Production System •AutoCAD – Factory CAD Process Improvement tools. •Moving high volume objects. •Expertise at Dynamics. •Machine Shop Experience. •Ready to learn more about nonconventional ME tools development. •AutoCAD and Solid works WORK BREAKDOWN STRUCTURE. Person Week 0->1 Tasks Week 1->2 Tasks Week 2->3 Tasks Team Lead IE Student 1 Prepare set of Skills to discuss in first meeting. Familiarize with previous project. Develop Project Pert chart and schedule. Meet Customer and tour Facility. Brainstorm Top 3-5 Improvement Areas. Assign work roles. IE Student 2 Prepare set of Skills to discuss in first meeting. Familiarize with previous project. Analyze the available data from WMS of CV to find spikes. Meet Customer and tour Facility. Brainstorm Top 3-5 Improvement Areas IE Student 3 Prepare set of Skills to discuss in first meeting. Familiarize with previous project. Research shelving methods and picking techniques in warehouses. Brainstorm Top 3-5 Improvement Areas ME Student 1 Prepare set of Skills to discuss in first meeting. Familiarize with previous project. Gather information about high volume movement of totes, boxes. Brainstorm Top 3-5 Improvement Areas RESOURCE REQUIREMENTS Time in the Cooper-Vision Distribution Center. Access to Staff members and Floor Employees. Machine Shop Equipment for Mechanical improvements.. Software Licenses:- Arena , AutoCAD, Excel. Faculty Expertise ( Kaemmerlen , Carrano) Trial license or time on ERP Software:- Baan WMS Software:- Red-Prairie. Budget:- TBD by Customer. RISKS AND CONTINGENCY PLANS Description of Risk Possible Consequen ces Probability of Risk (H/M/L) Severity of Risk (H/M/L) Overall Risk (H/M/L) Contingency Plan Higher Management Restricts WMS/ERP software changes May not be able make the optimal changes to software. H M M Do not make changes to current software , just remove glitches , add-ons to existing software. Test before implementing Organizational Right staff /employee not available Right Information unavailable at right time. M M M Find Alternative Information source like another staff member or historical records. Purchased Item does not arrive on time or is defective. Delays the dependent plans and processes. M H M Restructure the sequence of actions in the plan to accommodate this . Order multiple parts. One of the team member does not have enough work to do. Decrease in Motivation. Under utilization of L L L Re-assign the team member to another set of tasks done by another member and matches MEASURES OF SUCCESS Primary customer satisfaction.- Set Realistic goals with Customer. Improvement in number of picks per hour/day. Percentage reduction in the number of rehandling and rework. Improvement in job quality of on floor employees. Improvements are within specifications Easy to implement by primary users Completed well within 22 week time frame. INTELLECTUAL PROPERTY CONSIDERATIONS • • All work to be completed by students in this track is expected to be released to the public domain. Students, Faculty, Staff, and other participants in the project will be expected to release rights to their designs, documents, drawings, etc., to the public domain, so that others may freely build upon the results and findings without constraint. Students, Faculty, and Staff associated with the project are encouraged to publish findings, data, and results openly. SOURCES o Interviews. o o o o o Attended. o o o o Sarah Pittman, Process Improvement Manager , CV. John Kaemmerlen, MSD Faculty Adviser. MSD ( P09721) Team Aaron Heyman- Team Lead. Mid-term Review presentation Final Review and customer hand-over Meeting Poster Presentation at Imagine RIT Web-pages o o Cooper Vision Website ( www.coopervision.com) Edge Website for Project P09721 (edge.rit.edu//content/P09721/public/Home) THANK YOU Questions