When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house Facing brick being built Quoin stones and DPC DPC in position DPC between wall and floor Blocks ready for internal walls Wall ties in position Preparing scaffolding for the next level of bricklaying. Toe plates and bracing still need to be added Getting the mortar mixed Internal wall with wall tie DPC in place for a window Another view of DPC Pointing the facing brick Internal cavity wall with wall ties Special heads on site Standard concrete heads in position A longer concrete head Pride in the job A concrete element over a fireplace The beginnings of a chimney Chimney breast to first floor level Finished to first floor level Window frame base built up At finished level on special heads Inside wall to window level Bricklayers string level in position Layer of mortar in place for bricks