Safe by Design Group – PSLG Safety Forum 14th December 2012 Paul Clark -IP (Central) Head of Engineering Tony Wilkins - SBDG Chairman (Mott McDonald) Jason Johnston – IP Programme Engineering Manager 1 Safe by Design (SbD) - Overview Safe by Design Programme Design Risk Assessment Early Focus on Buildability and Temporary Works CDM Roles & Responsibilities Lessons Learnt Procurement & Programme Plan Plan Plan Plan Plan Develop Develop Develop Develop Develop Implement Implement Implement Implement Implement Review Review Review Review Review BAU CONTINUOUS IMPROVEMENT 2 PSLG Feedback (1) – Progress to date • Designer’s Risk Assessment – Implementation phase, sharing ideas capacity added to the SbD collaboration site – New multi-disciplinary PAN/0082 published Oct 2012 – Red triangles on drawings adopted to highlight risks from DRA • Early focus on Temporary Works and Buildability – Guidance notes uploaded onto collaboration site – Key messages being incorporated into Contract Requirements Technical 3 Standard Design – Use of Warning Triangles 4 PSLG Feedback (2) – Progress to date • CDM Roles / Responsibilities – Development complete – Implementation challenges • Lessons learnt – Examples received – Uploaded onto collaboration site – Engagement challenges • Procurement & Programme – Include commitment to SbD in CRT, mid tender reviews and tender assessment – Wider adoption of collaborative working and ECI 5 Safe by Design Forward Plan 6 PSLG Feedback – Future Initiatives • Cross discipline representation on 2013 Safety by Design Steering Group endorsed • Behavioural change foundation to SbD endorsed • SbD Group to consider and report back on measures to be put in place to monitor the effectiveness of implementation • ORR feedback on recent Safety by Design audits to be disseminated • The need to coordinate cross discipline / cross route SbD initiatives was emphasised 7 Future Governance of SbD Steering Group Activities: Governance / Coordination / Strategy Feature: Cross-discipline (B&C/T/E&P/S&T/Sys) Chair: Designer Rep Members: NR (e.g. HoE, HSEA, Commercial, RDD, DRAM), x Designers, y Contractors, ORR Steering Group Working Groups Activity: Develop & deliver work-stream (plan) Features: Either single or cross-discipline (depending on workstream) Lead: Nominated by SG Members: NR (e.g. PEM, HSEA, RAM, Competence & Training), x Designers, y Contractors Working Group Working Group Working Group Workstream 1 e.g Workstream 2 Workstream 3 Behavioural Change E&P B&C Working Group Working Group Workstream 4 Workstream 5 Signalling Track Mott MacDonald Actions 9 Safe by Design Questions 10