Safe by Design - Safety Central

advertisement
Safe by Design Group –
PSLG Safety Forum 14th December 2012
Paul Clark -IP (Central) Head of Engineering
Tony Wilkins - SBDG Chairman (Mott McDonald)
Jason Johnston – IP Programme Engineering Manager
1
Safe by Design (SbD) - Overview
Safe by Design Programme
Design Risk
Assessment
Early Focus on
Buildability and
Temporary
Works
CDM Roles &
Responsibilities
Lessons Learnt
Procurement &
Programme
Plan
Plan
Plan
Plan
Plan
Develop
Develop
Develop
Develop
Develop
Implement
Implement
Implement
Implement
Implement
Review
Review
Review
Review
Review
BAU
CONTINUOUS
IMPROVEMENT
2
PSLG Feedback (1) – Progress to date
• Designer’s Risk Assessment
– Implementation phase, sharing ideas capacity added to the SbD
collaboration site
– New multi-disciplinary PAN/0082 published Oct 2012
– Red triangles on drawings adopted to highlight risks from DRA
• Early focus on Temporary Works and Buildability
– Guidance notes uploaded onto collaboration site
– Key messages being incorporated into Contract Requirements
Technical
3
Standard Design – Use of Warning Triangles
4
PSLG Feedback (2) – Progress to date
• CDM Roles / Responsibilities
– Development complete
– Implementation challenges
• Lessons learnt
– Examples received
– Uploaded onto collaboration site
– Engagement challenges
• Procurement & Programme
– Include commitment to SbD in CRT, mid tender
reviews and tender assessment
– Wider adoption of collaborative working and ECI
5
Safe by Design
Forward Plan
6
PSLG Feedback – Future Initiatives
• Cross discipline representation on 2013 Safety by Design Steering
Group endorsed
• Behavioural change foundation to SbD endorsed
• SbD Group to consider and report back on measures to be put in place
to monitor the effectiveness of implementation
• ORR feedback on recent Safety by Design audits to be disseminated
• The need to coordinate cross discipline / cross route SbD initiatives
was emphasised
7
Future Governance of SbD
Steering Group
Activities: Governance / Coordination / Strategy
Feature: Cross-discipline (B&C/T/E&P/S&T/Sys)
Chair: Designer Rep
Members: NR (e.g. HoE, HSEA, Commercial,
RDD, DRAM), x Designers, y Contractors, ORR
Steering
Group
Working Groups
Activity: Develop & deliver work-stream (plan)
Features: Either single or cross-discipline
(depending on workstream)
Lead: Nominated by SG
Members: NR (e.g. PEM, HSEA, RAM,
Competence & Training), x Designers, y
Contractors
Working
Group
Working
Group
Working
Group
Workstream 1
e.g
Workstream 2
Workstream 3
Behavioural
Change
E&P
B&C
Working
Group
Working
Group
Workstream 4
Workstream 5
Signalling
Track
Mott MacDonald Actions
9
Safe by Design
Questions
10