ADQ Implementation Support Cell ADQ Implementation Workshop Miguel Rodrigues Paulo ADQ ISC 28-29 May 2013 ADQ Implementation Support Cell Focal Point Awareness and Training Web Site ADQ Guide Specifications and Guidelines + 32 2 7299818 adq@eurocontrol.int www.eurocontrol.int/adq ADQ Implementation Support Cell 2 Regulation Framework and Dates Single European Sky Framework ERs IRs Essential Requirements EU Regulation 552/2004 (interoperability) Directly applicable law in Member States Implementing Rules EU Regulation 73/2010 (aeronautical data quality) Community Specifications Apply from Publication in OJEU 27th January 2010 1st July 2013 Derogations: Data Set and Exchange format 1st July 2014 ADQ Implementation Support Cell Latest compliance: for data published before 1 July 2013and not amended 30th June 2017 3 Regulation Scope “[…] EATMN systems, their constituents and associated procedures […]” Integrated aeronautical information package Article 2(2) regulated parties Electronic obstacle data ANSP’s Electronic terrain data Aerodrome mapping data Article 2(1) aeronautical data and aeronautical information Operators of aerodromes and heliports with IFR (or special VFR) procedures Procedure design services ADQ Implementation Support Cell Originators and providers of survey data Regulated Parties Providers of electronic obstacle data Providers of electronic terrain data 4 Regulatory Provisions DATA QUALITY REQUIREMENT S: •Accuracy •Resolution •Integrity •Timeliness COMMON EXCHANGE FORMAT COMMON DATA SET MOC: AIX MOC: AIX MOC: AIX MOC: DQR (interoperability & performance) ANSP NEXT INTENDED USER COMMON DATA SET MOC: eAIP ANSP AERODROME Tools and Software DATA ORIGINATOR Evidence Requirements Automation ADQ Implementation Support Cell Personnel Consistency MOC: DAL MOC: CRC MOC: DO Error Report and Feedback 5 EUROCONTROL Specifications EUROCONTROL Specification for the electronic Aeronautical Information Publication (eAIP), Edition 2.0 published 14/02/2011 EUROCONTROL Specification for Data Assurance Levels (DAL), Edition 1.0 published 15/03/2012 Standalone or making a possible bridge to the AIXM 5.1 standard EUROCONTROL Specification Data Quality Requirements (DQR), Edition 1.0 published 18/01/2013 A qualitative method for data quality assurance (process definition approach) EUROCONTROL Specification for Aeronautical Information Exchange (AIX), Edition 1.0 published 14/12/2012 Natural evolution from the informal 1.0 specification Based on ICAO data quality requirements and prepared for evolution EUROCONTROL Specification for the Origination of Aeronautical Data (DO), Edition 1.0 published 04/02/2013 Volume 1: Compliance Material, a matrix to the provisions Volume 2: Guidance Material, an evolution from the WGS 84 Manual ADQ Implementation Support Cell 6 How to access ADQ documents? http://www.eurocontrol.int/adq http://www.eurocontrol.int/lists/publications/all-publications ADQ Implementation Support Cell 7 Overall Implementation Issues observed Data Originators Identification and formal arrangements Interface Common data set and direct electronic connection Non regulated data originators Safety Assessment Specific for aeronautical data systems Tools and Software Large number of tools Software safety assurance Long procurement processes Implementation Dates Too challenging Conformity Assessment When needed? Who does what? ADQ Implementation Support Cell 8 Conformity Assessment Conduct verification of the systems SYSTEM OR CONSTITUENT ANSP MANUFACTURER NOTIFIED BODY Conduct verification of the systems Assess conformity or suitability for use NSA EC DECLARATION OF SUITABILITY FOR USE EC DECLARATION OF VERIFICATION OF SYSTEMS ADQ Implementation Support Cell 9 ADQ Regulators Working Group (ARWG) Established in February 2011 “An opportunity to create synergies among the national bodies (Regulators, NSAs, CAAs) involved in the oversight of the implementation of the Regulation (EU) 73/2010 (ADQ) and it is believed to be a crucial contribution to achieve a common understanding of the provisions of the regulation.” 2/3 meetings per year 21 States already represented Tour de Table ADQ Implementation Support Cell 10 Legal issues identified Common understanding achieved VFR Aerodromes Data Protection quantifiable data quality requirements for accuracy, resolution and integrity, as required by Article 6(1), apply only to a sub-set of data items. However, the scope of the remaining provisions shall include all of the aeronautical data and aeronautical information that is referenced on the second sub-paragraph of Article 2(1) Possible modifications allow the implementation of data integrity protection through the use of alternative and equivalent standards other than the CRC32Q Scope of the Regulation data related with VFR Aerodromes, even if published in the AIP, is outside the scope of the ADQ IR. collected a list of possible modifications to the Regulation, mainly references and definitions Terrain Exchange Formats recognised that the existing formats do not fully meet the requirements of the ISO 19100 series as required by ADQ endorsed the activity of the TOD WG in identifying the user preferred terrain formats ADQ Implementation Support Cell 11 Legal issues identified Under discussion NOTAMs “Regulation (EU) No 73/2010 apply to the NOTAM, except when to do so will inhibit the distribution of aeronautical information necessary to ensure the safety of flight.” Provision of eTOD provided by non-regulated parties (e.g. geo institutes) ADQ inhibiting the provision of eTOD Implementation Timescales ADQ Implementation Support Cell 12 ADQ Implementation Support Cell 13