NC 73 Small Project Scoping Process Update June 24, 2014 Problem • • • Background No sections of NC 73 are scheduled for widening before 2025 (pre-STI) New NCDOT project ranking and funding formula focuses on statewide-tier corridors Continued congestion and safety issues at specific sections of corridor Strategy • • Take advantage of locally-controlled construction funds (CMAQ, STP-DA, Division, and local governments) Joint NCDOT/MPO/local government project identification and scoping process for small (0-$5 million) projects Next Steps • • • • Complete evaluation of all intersections Develop cost estimates and eligible funding sources Confirm project sponsors Monitor project solicitation schedules Participants • • • • Linda Dosse, David Keilson, Scott Cole, and Mike Reese (NCDOT) Justin Carroll and Bill Coxe (Huntersville) Andrew Bryant (Lincoln County) Hank Graham (GCLMPO) Growth has been uneven over past decade Intersection Locations Lincoln: 11 intersections Meck: 19 intersections Cabarrus: 6 intersections Grouping for Analysis 2B 2A Results to Date • Group 1 (Lincoln County) intersections evaluated – Recommended improvements a mix of new turn lanes, extending existing turn lanes, super-street, and limited multi-lane expansion – Some intersections were recommended for no short-term improvements • Groups 2 and 3 (Mecklenburg County) intersections evaluated in person and via Google Earth Impact of May 2014 STI Scores Route NC 73 From / Cross Street NC 16 Business To Description Specific Improvement Type N/A Add through lanes on NC 73 and other intersection improvements as needed. 10 - Improve Intersection Cost to NCDOT $930,000 Regional Impact Quantiative Score (Out of 70) 53.21 Division Needs Quantitative Score (Out of 50) MPO Position 39.30 GCLMPOmaximum points at regional and division tiers CRTPO and GCLMPOmaximum points at regional tiers CRTPO- maximum points at regional tiers NC 73 Business NC 16 in Vance Road Extension Widen to Multi-Lanes. Lincoln County / Beatties Ford Road 1 - Widen Existing Roadway $44,258,000 37.41 24.98 NC 73 Vance Road SR 5544 (West Extension / Catawba Avenue) in Beatties Ford Road Mecklenburg County Widen to Multi-Lanes 1 - Widen Existing Roadway $17,149,000 49.14 35.79 1 - Widen Existing Roadway $20,099,000 37.90 29.92 CRTPO- no points assigned at either tiers NC 73 Vance Road Extension (Future Throughfare) SR 5544 (West Catawba Avenue) Widen roadway from 2 lanes to 4 lanes, with median, wide outside lanes and sidewalks on both sides. NC 73 NC 115 SR 2693 (DavidsonConcord Road) Widen to Multi-Lanes 1 - Widen Existing Roadway $19,457,000 31.72 25.07 CRTPO- 100 points at regional tier NC 73 and I77 interchange I-77 N/A Upgrade existing interchange to split diamond. 8- Improve Interchange $11,165,000 N/A- funded at state level N/A- funded at state level N/A- funded at state level NC 73 Sam Furr Road SR 5544 (West Catawba Avenue) 1 - Widen Existing Roadway $28,095,000 30.24 24.42 CRTPO- no points assigned 21.56 CRMPO expects to assign 100 points at regional and division tiers NC 73 Davidson Highway US 29 Widen from four lanes SR 2316 (Northcross to six lanes with Drive) median, wide outside lanes, and sidewalks. Poplar Tent Road Widen NC 73 from 2 Lanes to 4 Lanes from US 29 to Cabarrus County. 1 - Widen Existing Roadway $93,500,000 26.64 STI Project Locations over Target Intersections Timeline for Completion • November 2013-early 2015: Intersection evaluations – Group 1: Spring 2014 – Group 2: Fall 2014 – Group 3: Late fall 2014 – Group 4: Winter 2015 • December 2013- Winter 2015: Scoping and alternatives analysis • April 2014- Winter 2015: Alternatives selection and cost estimation • January-April 2015: Report preparation and project list adoption Discussion 1. Impact of intersection analysis based on STI project status 2. Feedback on initial scoping process from Lincoln County intersections 3. Timeline for completing intersection analysis