Overview of IG ENTSO-E RGCE Accounting
Agenda
1. Provided documents
2. Overview ENTSO-E Accounting and Settlement process
3. Meter Measurement Data synchronization
4. Matching of Accounting Point Data
5. ENTSO-E RGCE Settlement Report
Provided documents
Phases covered by the IG ENTSO-E RGCE Accounting and Settlement:
The Implementation Guide ENTSO-E RGCE Accounting and Settlement covers
the following 3 phases:
Establishment of Accounting Point Relevant data
Matching of Accounting Point Data
Issuing of ENTSO-E Settlement results
Each of these phases is managed by a different document as following:
1. For the establishment of Accounting Point Relevant data
– ”Measurement Value Document” (MVD)
2. For the matching of Accounting Point data
– ”Energy Account Report” (EAR)
3. For issue of ENTSO-E Settlement results
– ”ENTSO-E RGCE Settlement Report” (ESR)
Description of documents
The ENTSO-E Accounting and Settlement process is based on the following documents
1. Measurement Value Document (MVD)
used for the verification of Accounting Point Relevant data on meter data level:
message types SOMA and (SOVM: only for internal use, no data exchange with
neighboring TS0)
Identification of Accounting Point Relevant data by EIC T-Code for tie-lines,
(identification of optional additional meter data by local EIC Z-Code for meters)
2. Energy Account Report (EAR)
used for the matching of the Accounting Point data on accounting data level:
message type SOAM for matching between TSO and SOVA for agreed values for
exchange via Publication Framework (since EPF is not in work SOVA has to be send
to the responsible Control Area, Control Block and Coordination Centre)
Identification of Accounting Point data by official EIC Z-Code for accounting point
3. ENTSO-E RGCE Settlement Report (ESR)
used for the information of the ENTSO-E Parties about the Settlement results:
message types are daily and weekly CBSR and CASR
Identification of Accounting Point data by official EIC Z-Code for accounting point
ENTSO-E Accounting and Settlement pyramid
EAR doc
MVD doc
ESR doc
The ENTSO-E RGCE Accounting and Settlement pyramid
Meter Measurement Data synchronisation
Establishment of Accounting Point Relevant data
Process:
The neighbouring TSO agree on the Accounting Point per Tie-Line (Accounting
point located in a Substation or on the border)
If the accounting point is on the border both TSO have to agree on the direct
resistance per Tie-Line to later calculate the flow on the border by help of a given
formula
Also they agree on the Meter Measurement Data set be exchanged and
validated in the Accounting Point Relevant Data synchronization process
Then the TSO exchange the set of Meter Measurement Data by help of the
SOMA file. Once both TSO have received a positive Ack. the data are
synchronized and provided in file SOVM.
SOMA and SOVM files are ”Measurement Value Document” (MVD) documents
Use of Meter Measurement data in MVD document
Identified by a local EIC Z Code
Identified by an EIC T Code
Possible uses of time series within a document
Meter Measurement value document information model
Provides general information
about the document, sender,
receiver etc.
Provides the start and end
date and time of period
being reported in UTC and
resolution of time series
Provides the time series and identification
of measurement point etc.
Seperate time series for import / export
Provides the quality and quantity
of the time series
For businesscodes have a look at the
ENTSO-E general codelist for data
interchange
For businesscodes have a look
at the ENTSO-E general codelist
for data interchange
07.11.200
9
10
UCTE Accounting process overview diagram
ENTSO-E RGCE process overview with electronic document identification
Matching of UCTE Accounting Point Data
Process:
Once the SOVM document, containing the synchronized Accounting Point
Relevant Data is received, the TSO calculate (consideration of tie-line losses)
the Accounting Point Data by help of the previous mentioned formula.
As next the designated TSO prepares the EAR based SOAM document and
send it to the neighbouring TSO who will release a positive ACK if the
Accounting Point Data matches with his data he calculated for him self.
Than the Accounting Point Data are made available on the ENSTO-E Publication
Framework (EPF) by both TSO by delivery of the EAR based SOVA document.
(since EPF is not in work SOVA has to be send to the responsible Control
Area, Control Block and Coordination Centre)
The final step is the verification of the Accounting Point Data by the concerned
ENTSO-E body (Control Area, Control Block and Coordination Centre). There for
they download the data from the (EPF) and check if they are consistent. (since
EPF is not in work SOVA has to be send to the responsible Control Area, Control
Block and Coordination Centre)
Energy Account Report information model
Provides general information
about the document, sender,
receiver etc.
Provides the start and end
date and time of period
being reported in UTC and
resolution of time series
Provides the time series and identification
of accounting point etc.
For businesscodes have a look at the
ENTSO-E general codelist for data
interchange
Provides the Tariff Type and
Import / Export per interval
For businesscodes have a look
at the ENTSO-E general codelist
for data interchange
Sequence diagram ENTSO-E Accounting process
The ENTSO-E Publication Framework is
a concept taht serves as an intermediary
between all ENTSO-E process
ENTSO-E RGCE Settlement Report
Process:
Once the Accounting Point data are agreed the ENTSO-E Settlement is
performed and the results are made available on the ENTSO-E Publication
Framework. ( at the moment only available by the responsible CC)
The ENTSO-E Settlement Process goes from top of ENTSO-E Pyramid to its
bottom.
As first the Settlement is performed for the coordination Centres and when
agreed the calculation for the control blocks is executed. The result are provided
to the control blocks by help of the ENTSO-E Publication Framework. (at the
moment via EH or email)
Then the control block operator calculates by help of the ENTSO-E RGCE
Settlement reports, provided by the CC’s, the ENTSO-E RGCE Settlement
Reports for the Control Area and provide them also by the ENTSO-E Publication
Framework. (at the moment via EH or email)
There’s a distinguish between “daily” and “weekly” Settlement Report.
Depending on this the content of the ENTSO-E RGCE Settlement Report is
different.
ENTSO-E RGCE Settlement Report daily – XML
07.11.200
9
16
ENTSO-E RGCE Settlement Report daily – TariffSum View
ENTSO-E RGCE Settlement Report daily – ResolutionView
ENTSO-E RGCE Settlement Report weekly – XML
07.11.200
9
19
ENTSO-E RGCE Settlement Report weekly – TariffSum View
ENTSO-E RGCE Settlement Report – weekly ResolutionView
ENTSO-E RGCE Settlement Report sequence flow
Overview daily ENTSO-E RGCE Settlement for Wednesday
The period for daily settlement reporting
Overview weekly ENTSO-E RGCE Settlement
The period for weekly settlement reporting
ENTSO-E RGCE Settlement Document information model
Provides the Status of the
account for unintentional
deviation per
tariff
Provides general information
about the document, sender,
receiver etc.
Provides the start and end
date and time of period
being reported in UTC and
resolution of time series
Nature of the time series
(Schedule, Energy Flow, compensation
program within reporting period,
unintentional deviation, compensation
program for new period – only in CBSRw)
For businesscodes have a look at the
ENTSO-E general codelist for data
interchange
Provides the Tariff Type and
Import / Export per interval
For businesscodes have a look
at the ENTSO-E general codelist
for data interchange
Download