2011 CAPF Professional Workshop Professional Sign-offs Professional Sign-offs Option 2 1- WhyDivider: Authentication/Validation 2-This Annex 2 – RFP Validation may be used as a main 3- Approval Process section divider 4- Compliance Assurance 5- Authentication Policy Why Authentication/Validation? Professional Work Forestry Professional Code of Ethics Standards of Practice Professional integrity Authentication / Validation Authentication Policy Validation (Annex 2) Divider: Option 2 Annex 2 - RFP Validation This may be used as a main section divider Definition RFP Regulated Forestry Professional Regulated member College of Alberta Professional Foresters College of Alberta Professional Forest Technologists RPF or RPFT only RFP Role RFPs must submit work (Annex 2) – Work done by RFP or others Exemption – Companies harvesting less than 30,000 m3 annually from public land Validating Work – Sign, professional title (RPF, RPFT), registration number – Stamping (professional seal) and signing Why RFP Validation? Assurance that work is – completed by qualified professionals – prepared with due diligence – Accurate (done by RFP or others) Complete and accurate “auditable” records are kept Due Diligence Desired outcome achieved Negative consequence minimized Completeness Conclusions Procedures followed (e.g. SOP, checklists) Records kept (and retrievable) Complete and Accurate Free of errors or omissions Submitted on time Prompt notification and correction Readily understood Complete documentation Responsibility and Accountability Industry and Government RFPs – meet standards – work they oversee, complete and submit Government RFPs – complete accurate and timely reviews – direction or corrective action Accountability is not transferred Divider: Option 2 Approval Process This may be used as a main section divider Two Approval Processes - Appraisal - Acceptance Appraisal Work with Significant potential risk SRD due diligence Communication is critical Validated work is accurate Appraisal Verify completeness Verify accuracy Review checklists Review risk items (e.g. past performance) Communication is critical Appraisal Validated and Complete Appropriate explanation Recommend approval Validated and Incomplete Appropriate explanation Recommend approval Appraisal Validated and Incomplete Without appropriate explanation Without explanation Do not accept Not validated Do not accept Reviewing RFP Prepare and File Report Factors chosen to evaluate Results of assessment on accuracy Outcome of appraisal Recommendations/decision rationale Reviewer names, dates Validation FMP Appraisal FMP Appraisal Validated Review checklists http://srd.alberta.ca/ManagingProgra ms/ForestManagement/RegulatedFo restryProfessionals.aspx Compare FMP against Standards – Appraisal checklists FMP Appraisal Standards / adjusted standards met (e.g ToR, Approval Letters) Stakeholder input Consultation Records – Public – Aboriginal FMP Appraisal Reviewing RFPs Appraisals validated and filed. Recommendations to FMB Executive Director FMP Approval Approval by FMB Executive Director Approval Decision – Validated – Available to Public Two Approval Processes - Appraisal - Acceptance Annual Operating Plan Appraisal – General Development Plan – Compartment Assessments Acceptance – Final Harvest Plan – Road Plan and Fire Control Plan – Reforestation Program Acceptance Work with limited potential effect Validated/Checklists – Complete – Appropriate explanation – Accept Approved in 5 days Field Inspections Compliance Assurance Industry Self-Reporting SRD Inspections FOMP Internal Audits Industry Self-Reporting See Directive 2006 – 04 Timber and Reforestation Operations Monitoring (i.e. status of active timber operations by disposition) Monthly reporting form – must be validated Forest Operations Monitoring Program FOMP is ISO 9001:2008 Registered – Quality Management System Management-improvement focused – Pro-active communications Based on plan-do-check-act cycle FOMP Inspections Inspections conducted by SRD Staff – Validate Inspections – FOMP Course – CAPF or CAPFT member Number of inspections is risk based – Based on enforcement history and past performance – Harvest level – Validation 2009-2010 FOMP Report Top Operational Issues Utilization Standards Forest Protection – debris disposal Watercourse protection FOMP Audits Internal "audits" Audit 20% of total inspections by inspector Implications – induced error Address non-compliance Validation (Annex 2) Reliance on Professional Integrity Forest Management Process Government and Industry RFPs Authentication Policy CAPF Authentication Policy Effective August 1, 2010 Demonstrate to: – Public – Government – Other professional association Work completed/reviewed by RFPs – Bound by Code of Ethics – Advanced Education CAPF Authentication Period of Education Monitoring and Enforcement Public /Private Land Thank you! Contact Information Email: Vicky.Bosse@gov.ab.ca Tel: (780) 427-4707