Attachment 5.A.1 - Centennial School District

advertisement
STUDENT ACHIEVEMENT REPORT
CENTENNIAL SCHOOL DISTRICT
October 2, 2012
Joyce A. Mundy, Assistant Superintendent
PSSA District Level Data
AYP Fact Sheet
( Attachment 5.B)

What is Adequate Yearly Progress (AYP)?



Defined under No Child Left Behind as having more students reach proficiency
each year so that 100% would be proficient by 2014.
Each year the performance targets increase towards 100%.
AYP Measures

Overall Performance:


Adequate progress for subgroups with 40+ students:



For each grade level tested, did enough students score advanced and
proficient?
Confidence Interval: If a group came close to their target, it accounts for the
statistical variation as each year a new set of students determine grade level
AYP.
Safe Harbor: the number of students below proficient in a subgroup is
reduced by 10% in a particular subgroup.
Participation:

For each grade level, did 95% of eligible students participate?
RISING PERFORMANCE TARGETS…
Year
Reading %
Math %
2002-2004
45%
35%
2005-2007
54%
45%
2008-2010
63%
56%
2011
72%
67%
2012
81%
78%
2013**
91%
89%
2014**
100%
100%
Waiver to freeze?**
WAYS THAT SCHOOLS CAN FAIL TO
MEET AYP



Students in the grade level as a whole did not reach the
performance targets in reading or math.
Students in a particular subgroup did not make adequate
progress from the following year.
Fewer than 95% of eligible students participated.
RESOURCES TO ANALYZE DISTRICT
DATA

Data Recognition Corporation (DRC)
District reports for schools and levels- AYP report
 Denotes Subgroup Performance


Emetrics
Compare how one grade does each year or compare students two years
in a row
 Breakdown for basic, below basic, proficient and advanced for each
grade level and on specific eligible content


PVAAS
Value added data- how did the same group of students or a subgroup
perform over time
 Projections for AYP in the next year based on how students are doing
over time in CSD

WHAT DOES CSD DISTRICT DATA
SHOW?



Many grade levels and subgroups made AYP, Safe Harbor, or Growth over
Time- on the report this is indicated as a Yes in the last column- Met
Performance Target.
Every subgroup and performance category is called a target. Schools
must show proficiency in all target areas to meet AYP.
AYP percentages are a snapshot, the more important information is where
we are making progress and which groups of students are declining.
SCHOOL LEVEL AYP REPORTS
( ATTACHMENT 5.C)

Longstreth:
Met 9 of 9 targets
Made AYP

William Tennent
Met 13 of 19 targets
Correct Action 4

Stackpole
Met 12 of 13 targets
Warning

McDonald Davis
Met 21 of 21 targets
Made AYP

Klinger
Met 20 of 21 targets
Warning

Log College
Met 20 of 21 targets
Warning

Willow Dale
Met 16 of 20 targets
Warning
GROWTH OVER TIME IN CSD



On October 22, each principal will review the areas of growth over
the past three years using PVAAS and Emetrics reporting.
At a glance, Safe Harbor (SH) or Confidence Intervals (CI) show
that 10% of students in that group moved positively.
These scores are at the surface. The true work begins in looking
at students’ growth over time and the gaps in our curriculum and
instruction. Specificity is important.
AREAS OF CONCERN IN CSD

Begin with the targets not met in the AYP report and drill
down further:
Which eligible content was missed consistently?
 Adapt curriculum and instruction to bridge those gaps- use
core instruction and intervention times.
 It’s too simplistic to say we failed at elementary or middle
school in math or reading when our students met the goals in
math with the exception of one subgroup.
 Be specific in our data analysis to avoid quick fixes or global
changes that aren’t necessary.

School Improvement
DEFINING SCHOOL IMPROVEMENT

Implications of School Improvement
Schools do ongoing analysis of curriculum, instruction and
assessment to help students make progress.
 Schools who are in school improvement must make adequate
progress or they must continue to do plans towards improving
student achievement.
 These action plans are ongoing and measured for success by
the School Improvement Data team.

(Attachment 5.B)
TIMELINE FOR SCHOOL IMPROVEMENT

Sept, 2011 to June, 2012: Development of the School Level Plan (SLP)

June, 2012: Online entry of School Level Plan

Aug 31, 2012: Submit School Level Plan (delayed from June 30 to August
31 by PDE)

Sept, 2012: Begin implementation of School Level Plan

Oct 30, 2012: Finalization of School Level Plan after data review

Nov 30, 2012: Final Submission of District Strategic Plan which includes
the William Tennent School Level Plan
SCHOOL IMPROVEMENT AT WTHS

Performance over time at WTHS:








2003-2005:
2005-2007:
2007-2008:
2008-2009:
2009-2010:
2010-2011:
2011-2012:
School Improvement
Corrective Action 1 and 2
Making progress
Corrective Action 2- Year 2
Making progress
Corrective Action 2- Year 3
Corrective Action 2- Year 4
A school must be in “Making Progress” for 2 years to move out of
Corrective Action or School Improvement. If you only make progress
for 1 year, you return to the next step of Corrective Action. That
happens if you miss any performance targets. WT missed 6 of 19
targets in 2012 in math and reading.
IMPLEMENTATION OF SCHOOL LEVEL
PLAN FOR 12-13

July 24, 2012: Receive notification of AYP for district schools.

Sept 4, 2012: Implement SLP and revise for any new targets not met.



Sept 24, 2012: Receive school level and value added PSSA data.
Review SLP to insure that it remains appropriate using new data.
Nov., 2012: Final submission after review of 2012 data.
Begin work for School Improvement for this year based on remaining in
Corrective Action II year 5 using the same process as was done for the
current plan- will retain most of the action steps as they are relevant.
SCHOOLS IN WARNING STATUS

What puts them in that category?

What happens next?
Make AYP in 2013 and move out of warning
 Failure to make AYP in 2013: Move to School Improvement 1
 Projected data
 Larger schools means more subgroups
 Advancing achievement in subgroups- Strengthen the core (reading, math, writing, science)
 Interventions that are monitored for effectiveness
 Data analysis model
 Differentiated instruction in all subjects

Action Steps: School Level Plan for WT
(Attachment 5.B)

Effective instructional practices:

Staff development for teachers and administration on research
based instructional practices that includes regular feedback
for improvement.

Staff sets a goal that is within the defined areas of this School
Improvement Plan.
ACTION STEPS FOR SCHOOL
IMPROVEMENT AT THE HS

Supervision and Evaluation:
Use Danielson’s Framework for teaching as put forth from
PDE for supervision and evaluation model.
 Establish walkthrough model for data collection on instruction
and professional coaching.
 Collegial observation and dialogue on best practices.
 District wide set of supportive resources.

ACTION STEPS FOR SCHOOL
IMPROVEMENT AT THE HS

Curriculum and Assessment:
Map the Centennial School District curriculum to include new
Common Core Standards and standards based assessments.
 Professional development on assessments and data based
decision making for instruction.
 Examine intervention process to insure that these are data
driven and evaluated over time.
 CDT and Keystone Testing Align curriculum accordingly.

Testing Changes from PDE
for 2012-2017
(Attachment 5.C)
KEYSTONE EXAMS- 2012-2013

AYP will be based on this year’s current grade 11 and their
performance on the new Keystone Exams.
Every 11th grader will take all 3 Keystone Exams.
 These exams will be given in December and January to any 11th
graders not in a Keystone course.
 Students in grades 9-11 who are currently in Algebra I, Biology, and
Literature (Grade 10) will take the Keystone Exam in May, 2013.
 Students who were proficient in the pilot Keystone 2 years ago will
not need to retake it this year.

PDE ASSESSMENT CHANGES


Adoption of the Common Core Standards and New Testing
Cycle.
Implementation of the Common Core Standards:

Three year plan - Changes to PSSA testing for grades 3-8 guides this.
 Prepare for Keystone Exams for end of course assessment.
 Algebra I
 Biology
 Literature
KEYSTONE EXAMS 2013-2014

This year’s grade 10 will be in grade 11 in 2013:

Any student in grade 11 who did not yet take Biology or
Algebra I will take the Keystone Exam at the end of that
course in May.

Any student in grade 11 who did not show proficiency in grade
10 will retake the Algebra I, Biology, Literature Keystone.

All 9th and 10th graders enrolled in one of these courses will
take the end of course Keystone.
th graders next year, this counts as a graduation
 For 9
requirement.
KEYSTONE EXAMS 2014-2015

Our current grade 8 students will be in grade 10 in 2014.

Students will need to pass all 3 Keystones as a graduation
requirement.

Students will have opportunities in grades 10 and 11 to retake
the exam if needed.

The school will have interventions planned that are course
specific to allow for remediation between tests.
IMPLICATIONS: TESTING





How will the end of course assessments fit into our assessment policy (i.e.
final exam versus Keystone) for grades 9 and 10?
For this year, grade 11 will have six 90-minute testing blocks in December
and January. Will they also have mid-terms in their current course?
For grade 10, the Keystones in May are at the same time as AP testing.
Creating appropriate proctor and testing schedules for all of these testing
blocks.
How do we help students prepare this year in grade 11 when they haven’t
had the material in 1-2 years?
COMMON CORE STANDARDS AND PSSA

This year for grades 3-5:
Additional writing field test with CC Standards for grades 3-5.
 PSSA will have the old standards assessed with field test
questions on new CC Standards.


Next year for grades 3-5:

All PSSA testing will be based on the Common Core
Standards.
COMMON CORE STANDARDS AND
PSSA

This year for grades 6-8:


PSSA will have the old standards assessed with field test
questions on new CC Standards.
Next year for grades 6-8:
 PSSA
will have the old standards assessed with field test
questions on new CC Standards.

PSSA in 14-15:

All testing will be on the CC Standards.
K-12 ACTION STEPS

The WT School Level Plan reflects the goals of the K-12 Principals
as have been defined in collaboration with BCIU since last year’s
PVAAS data was examined.






Effective instructional practices- research based and now state
mandated
Use of instructional time
Articulated, cohesive curriculum. (attachment 5.F)
Data based decision making model
Job embedded professional development for all staff
Effective, streamlined interventions
K-12 ACTION STEPS





Principal led, job embedded professional development.
Administrative sessions monthly to enact and implement these
steps over the next three years.
New curriculum renewal cycle to address Common Core
Standards, assessment changes, and data based audits. (5.D)
Process to evaluate curriculum, instruction, and intervention
process. (5.D)
Stay on point….no detours, diversions, or fragmentation.
Download