INTERNATIONAL STANDARD ISOTC67/SC4M 1 st edition 2010 5 - 8 Petroleum and natural gas industries — Well integrity for the operational phase. Participating Work groups Well integrity management & handover – Gary Limb (ConocoPhillips) Lead – Simon Spark ( Tullow Oil ) – Nina Ringoen( Centrica ) – Joe Anders ( BP ) / Mike Payne BP > replaces Joe Define well types & risk based monitoring – Paul Hopmans ( Shell ) ( Iso standard Convener ) – Andre Luiz Rocha Alves Petrobras – Gavin Mundie ( Centrica ) – Crawford Hair ( Chevron - Grant Lintern (Woodside) added Well barriers & annular pressure management – Hilde Brandanger ( Statoil ) – Alex Crabtree ( Hess ) lead – Pier Alberto Magarini (Eni ) Well review & test criteria – Nigel Snow ( Maersk )Lead – Mike Murrey ( ExxonMobil ) – Remco Donders (Total) Other participants ISO contacts 'edykhuis@ziggo.nl'; 'Ries.Langereis@c-a-m.com‘; Reeve, Neil TN GSNL-PTE/DTST; OGP focal point'Alf.Reidar.Johansen@ogp.org.uk'; Participating companies to review. Petro China Adco / Zadco Abu Dahbi; Petronas Malaysia Billiton Petroleum Development Oman Gazprom Qatar Petroleum Referenced standards (So far ) API 14 A / B / D/ H API 6 A API 90 Norsok D 10 Iso 17776 Hazard identification Iso 14224 reliability and maintenance data for equipment ISO 31000 risk management ISO standard content Scope / Definitions /References Well Integrity Management System Organizational Structure Competence Data Management Handover Assessment Well Integrity Assurance Process Performance indicators KpI’s Management of Change Barrier Principle Barrier Principle/Philosophy Barrier Definition (WBE/SCE) Barrier Schematics Barrier Performance Matrix Barrier Reliability/survivability (safety case) ESD/Related Safety Systems Risk management Risk factors and assessment Matrix Corrosion\ Erosion Management Conductor\Structural\Reservoir Compaction Risk Based Maintenance Process Annulus Pressure Management Annuli Pressure Monitoring Process Definition/Calculation of MAASP/ MAWOP Sustained Pressure Management Integrity assurance Closed in/temporary suspended wells Acceptance criteria / Leak Rates Integrity Fault Mitigation Integrity Deviation/Waver Process Incident/ response planning Lifecycle management. Well Review/ Health Check Process Life Cycle Extension Abandonment criteria for end of well life Definition of Well integrity Well integrity process is: Application of technical , operational and organizational solutions to reduce risk of uncontrolled release of well bore fluids through out the life cycle of a well, to avoid harm to people , environment and assets and the required barriers and assurance task in place to prevent this . This well integrity standard addresses the operate phase of the well from well construct hand over to abandonment only. Team 1 topics ( Gary ) 1. Organisation R&R 2. Information management 3. Well hand over 1. Well design basis 2. Traceability of SCE materials 4. People & competence 5. Procedures 6. Management of change 7. KPI’s metric’s 8. Assessment health check ( system) Team 2 topics (Paul ) 1. 2. 3. 4. 5. 6. 7. Risk matrix Performance standards Mitigation of faults Emergency response plan Deviation process Reliability process Condition monitoring all wells that are not abandoned 1. Corrosion proposal Nigel 8. Risk based monitoring , inspection & maintenance, 1. flow wetted and non flow wetted components 9. Reservoir compaction assurance task and risk Team 3 topics (Alex) 1. 2. 3. 4. 5. 6. 7. 8. Barriers Barrier schematic’s matrix Safety systems / ESD ‘s Annular pressure management Methods of monitoring of annular pressure Risk acceptance criteria definition Acceptance criteria table Mitigating measures Team 4 topics ( Nigel ) Well review process Well review scope Triggers for Well review Well review documentation process Technical health check End of well life review Valve testing & barrier verification Leak rates Block and bleed Barrier verification test Testing methods Function testing Interface seal testing Well head maintenance ( OEM spares definition ) Annular pressure test SCV testing Timeline plan for development of ISOTC67/SC4M standard 1 st edition 2010 5 – 8 Well integrity for the operational phase I 2010 Q1 Q2 Draft ballot ballot 1 st f2f Scope initiation Work group reviews other operators Q3 Q4 2011 Q1 Q2 Q3 Q4 2012 Q1 Q2 Q3 Q4 2013 Q1 Q2 Q3 30 % progress on content 60 % progress on content 2nd f2f 12 / 13 /14 th April Houston 3rd f2f Netherlands , following SPE work shop in Noordwijk 15 th / 16 th Sept and 19 th / 20 th Sept in Rijswijk 4 th f2f 5 th f2f 6 th f2f Celebration 100 % progress on content Technical autor ediiting 100 % Committee draft Committee draft Comments National committee endorsement Note: 15 th afternoon after SPE start and continue in Grand Palace Noordwijk hotel, continue on Monday Tuesday in Rijswijk, details to follow. Q4