Baltimore County Public Schools 1 Schematic Design Presentation Catonsville Elementary School 1104 Kenilworth Dr. Suite 500 Towson, MD 21204 (410) 337-2886 fax (410) 337-2974 www.rubeling.com © 2014 at Bloomsbury Aerial Location View 2 © 2014 Overview and Comparison Existing Catonsville E.S. & Proposed Catonsville E.S. at Bloomsbury © 2014 Site Current C.E.S. 6.16 acres Proposed C.E.S. 11.8 acres SRC 405 700 Current Enrollment 445 Bus Loop 2 8 Parking 68 150 Building Size 59,600 sf 103,000 sf Historic Structure Yes Yes Original Construction 1909 1925 Additions 1929, 1934, 1970 1930-1962 (additions removed 1990) Converted to County Building N/A 1980’s Current Use Elementary School Bureau of Elections Recreation & Park 3 Existing Bloomsbury Site 4 1930’s Building 1990’s Gymnasium © 2014 EXISTING SITE PHOTOS 5 1930’s Building 1990’s Gymnasium © 2014 Site & Grading Plan 6 ENTRY ENTRY © 2014 Project Objectives 7 • Restore Historic Features of the Original 1925 Building • Interior Renovation and Addition to Convert Building to a New 21st Century Learning Facility • Incorporate Facility Upgrades to Support the Instructional Environment for Students • Provide All New Building Systems • Provide Building Security and Address Student Safety • Address all Code, ADA and Life Safety Issues © 2014 GROUND FLOOR 8 1ST GRADE CLASSROOMS (TYP) KINDERGARTEN PRE-K PARENT DROP OFF GROUND FLOOR © 2014 GROUND FLOOR 9 STAIRS (TYP) ELEVATOR GROUND FLOOR © 2014 FIRST FLOOR 10 CLASSROOMS (TYP) MEDIA CENTER ENTRY MAIN FLOOR © 2014 FIRST FLOOR 11 STAIRS (TYP) ELEVATOR MAIN FLOOR © 2014 SECOND FLOOR 12 CLASSROOMS (TYP.) SECOND FLOOR © 2014 Summary of Improvements 13 Curriculum: • The building interior will be new and designed to current curriculum and building standards and will meet BCPS and State of Maryland’s Standard for Technology. Building Envelope Improvements: • Replace existing roof. Code Improvements: • • • Install elevator to access all levels. All new doors and hardware to be in compliance with current code. New restrooms to comply with ADA guidelines. MEP System Improvements: • • • • © 2014 New mechanical system to all year round climate control thru central heating and cooling. New lights to meet BCPS standards and building code. New light controls. New intercom and clock system. BUILDING ELEVATIONS 14 © 2014 BUILDING ELEVATIONS 15 © 2014 BUILDING ELEVATIONS 16 © 2014 BUILDING ELEVATIONS 17 © 2014 BUILDING ELEVATIONS 18 © 2014 BUILDING ELEVATIONS 19 © 2014 BUILDING ELEVATIONS 20 © 2014 BUILDING ELEVATIONS 21 © 2014 Project Schedule 22 Design March 2014 Bid & BCPS Board Meeting February 2015 - April 2015 Construction May 2015 July 2016 Opening © 2014 - - February 2015 August 2016 Questions 23 © 2014