Schematic Design Presentation - Baltimore County Public Schools

advertisement
Baltimore County Public Schools
1
Schematic Design Presentation
Catonsville Elementary School
1104 Kenilworth Dr.
Suite 500
Towson, MD 21204
(410) 337-2886
fax (410) 337-2974
www.rubeling.com
© 2014
at Bloomsbury
Aerial Location View
2
© 2014
Overview and Comparison Existing Catonsville E.S.
& Proposed Catonsville E.S. at Bloomsbury
© 2014
Site
Current C.E.S.
6.16 acres
Proposed C.E.S.
11.8 acres
SRC
405
700
Current Enrollment
445
Bus Loop
2
8
Parking
68
150
Building Size
59,600 sf
103,000 sf
Historic Structure
Yes
Yes
Original Construction
1909
1925
Additions
1929, 1934, 1970
1930-1962
(additions removed 1990)
Converted to County Building
N/A
1980’s
Current Use
Elementary School
Bureau of Elections
Recreation & Park
3
Existing Bloomsbury Site
4
1930’s Building
1990’s Gymnasium
© 2014
EXISTING SITE PHOTOS
5
1930’s Building
1990’s Gymnasium
© 2014
Site & Grading Plan
6
ENTRY
ENTRY
© 2014
Project Objectives
7
• Restore Historic Features of the Original 1925 Building
• Interior Renovation and Addition to Convert Building to a New
21st Century Learning Facility
• Incorporate Facility Upgrades to Support the Instructional
Environment for Students
• Provide All New Building Systems
• Provide Building Security and Address Student Safety
• Address all Code, ADA and Life Safety Issues
© 2014
GROUND FLOOR
8
1ST GRADE
CLASSROOMS (TYP)
KINDERGARTEN
PRE-K
PARENT DROP OFF
GROUND FLOOR
© 2014
GROUND FLOOR
9
STAIRS (TYP)
ELEVATOR
GROUND FLOOR
© 2014
FIRST FLOOR
10
CLASSROOMS (TYP)
MEDIA CENTER
ENTRY
MAIN FLOOR
© 2014
FIRST FLOOR
11
STAIRS (TYP)
ELEVATOR
MAIN FLOOR
© 2014
SECOND FLOOR
12
CLASSROOMS (TYP.)
SECOND FLOOR
© 2014
Summary of Improvements
13
Curriculum:
•
The building interior will be new and designed to current curriculum and building
standards and will meet BCPS and State of Maryland’s Standard for
Technology.
Building Envelope Improvements:
•
Replace existing roof.
Code Improvements:
•
•
•
Install elevator to access all levels.
All new doors and hardware to be in compliance with current code.
New restrooms to comply with ADA guidelines.
MEP System Improvements:
•
•
•
•
© 2014
New mechanical system to all year round climate control thru central heating
and cooling.
New lights to meet BCPS standards and building code.
New light controls.
New intercom and clock system.
BUILDING ELEVATIONS
14
© 2014
BUILDING ELEVATIONS
15
© 2014
BUILDING ELEVATIONS
16
© 2014
BUILDING ELEVATIONS
17
© 2014
BUILDING ELEVATIONS
18
© 2014
BUILDING ELEVATIONS
19
© 2014
BUILDING ELEVATIONS
20
© 2014
BUILDING ELEVATIONS
21
© 2014
Project Schedule
22
Design
March 2014
Bid & BCPS Board Meeting
February 2015 -
April 2015
Construction
May 2015
July 2016
Opening
© 2014
-
-
February 2015
August 2016
Questions
23
© 2014
Download