CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012 IMPLEMENTATION PLAN • • • • • • • • Step approach Distinction of ASM/ATFCM process and organisational enablers GO/NO GO to move next step Starting from national ASM/ATFCM integration process Regional ASM/ATFCM process final goal Organisational solution to be evaluated in due time Timeframe to consider 2012-2015 for realistic implementation Changes subject to validation before GO/NO GO decision. ATFCM/ASM Functional Models • Model A - Optimizing the current situation • Role: Existing roles continue with additional FABCE Network management • Model B - Optimizing the current situation, applying LEAD AMC • Role: Existing roles continue with additional LAED AMC to support FABCE ASM management • Model C - FABCE ATFCM coordination function, and national ASM • Role: A FABCE Network ATFCM Centre • Model D - FABCE ASM coordination function, and national ATFCM • Role: FABCE Network ASM Centre • Model E - FABCE ATFCM/ASM coordination function • Role: FABCE Network Operations Centre 3 4 High Level Objectives • Assess the feasibility of ASM/ATFCM coordination procedures at national level; • Assess the feasibility of ASM/ATFCM coordination procedures at FAB level using national Structures • Assess the feasibility of ASM/ATFCM coordination procedures at FAB level using Lead AMC Concept • Assess the feasibility of ASM/ATFCM coordination procedures between national structure/Lead AMCs and NM • Assess usability of different ASM planning and coordination tools, which could be applied in FAB CE operational environment; Geographical Scope CZ CZ YES – FL or Areas AT YES – FL or Areas SK YES – FL or Areas HU YES – FL or Areas SL YES – FL or Areas HR YES – FL or Areas BiH NO SK AT SL HU HR BiH Procedures - Scope • D-7/D-2 • D-1 AUP FABCE – Potential Traffic on Night Segments if available H24 Traffic sample for Friday 14/10/2011 Numbers show flights on segment for the period 0500-2300 MODEL A AMC AMC AMC FP FP AA FMP AMC AA FP FMP FMP FMP AA NMAD FAB AA AA AA AA FMP FMP FMP Live trial positive feedback – Communication – Coordination among actors – Harmonisation of UQ 863 publication – FAB CE administrator – Rotation principle for FAB CE administrator – General Systems support feasible Live trial issues • Procedures – – – – – Respect timeline for uploading and publication Respect of sequence of tasks Confusion for weekend consolidation Confusion for contingency procedure application (different procedures?) Missed network coordination • NOP Publications – – – – – Status publish for national files (FMP) Wrong information in files Wrong templates Confusion for D-2/6 files Inconsistency of information (FAB AUP vs EAUP) • Systems – LARA connection – internet – NOP connection 12 MODEL C AMC AMC AMC FP AMC AA FMP AMC AA FP FMP AA FMP FMP FMP AA NM AA FMP AA AA FATFCM FMP MODEL D AMC AMC AMC AMC AA AMC FP AA FP FMP FMP AA FMP FMP FMP AA FASM AA FMP AA AA NM FMP MODEL E AMC AMC AMC FP AMC AA AMC AA FP FMP FMP AA FMP FMP FMP AA FATFCM FASM AA FMP AA AA NM FMP High Level Objectives • Assess the feasibility of ASM/ATFCM coordination procedures at FAB level using FAB ATFCM coordinator • Assess the feasibility of ASM/ATFCM coordination procedures at FAB level using FAB ASM coordinator • Assess the feasibility of ASM/ATFCM coordination procedures at FAB level using FAB ASM/ATFCM coordinator • Assess the feasibility of ASM/ATFCM coordination procedures between FAB ASM/ATFCM coordinator and NM Operational scenario • • • • CDRs cross borders CDR synchronisation CBAs ATFM scenarios – Alignment sector configurations/opening schemes – Alignment ATFM measures • Level capping • Re-routings RTS Technical Layout Predict, NOP Predict, NOP Predict, NOP LARA, CIAM NOP LARA, CIAM NOP LARA, CIAM NOP Predict, NOP Predict, SIMEX, NOP Predict, SIMEX, NOP LARA, CIAM NOP LARA, CIAM NOP LARA, CIAM NOP Predict, NOP Predict, NOP Predict, NOP LARA, CIAM NOP LARA, CIAM NOP LARA, CIAM NOP