External Review Team Conference Call: Preparing the Team for Off-site Review Work <insert date> 2014 Purpose • Prepare team members for off-site review work • Discuss External Review Team Workspace • Provide context of the system • Discuss schedule/logistics • Q&A 2014 External Review Team Member Training https://advanced.instructure.com/enroll/DNMHNT • Online team member training is optional for fall, 2014. • Online team member training is required beginning January, 2015. • Asynchronous training sessions Home Tab 2014 School and System Expectations • Meet AdvancED Accreditation Standards for Quality <insert appropriate information about school – see •examples Implement a continuous improvement process below> •• Conduct Internal Review New state mandates •– Executive Summary Common Core Standards • Standards Self Assessment – Assessment System • Stakeholder Feedback Diagnostic – Program Review • Student Performance Diagnostic – Teacher Evaluations • Improvement Plan • School closings and reconfigurations • Assurances Systems Accreditation used to validate and guide •• Host External Review strategictodirection • Respond Improvement Priorities 2014 <insert name of system> <insert appropriate information about school – see examples below> • New state mandates – – – – Common Core Standards Assessment System Program Review Teacher Evaluations • School closings and reconfigurations • Systems Accreditation used to validate and guide strategic direction 2014 Index of Education Quality™ The Index of Education Quality provides a holistic measure of overall performance based on data aggregated from each AdvancED Standard and diagnostic results from student, parent and staff/teacher surveys The work of the External Review Team will be centered around the Domains of the IEQ. 2014 Team Member Assignments • Team Members will be assigned to a Standard and an IEQ Domain. – Standard assignment – responsible for leading the team in the discussion and analysis of the evidence found. – IEQ Domain – responsible for working with the Domain team to make connections between related Indicators and supporting evidence. • All Team Members will individually rate every indicator and Evaluative Criteria. 2014 Team Member Assignments Team Member 1 – insert name, insert name 2 – insert name, insert name 3 - insert name, insert name 4 - insert name, insert name 5 - insert name, insert name 2014 Standards and IEQ Domains Teaching and Learning Impact • Standard 3 – Teaching and Assessing for Learning • Standard 5 – Using Results for Continuous Improvement Leadership Capacity • Standard 1 – Purpose and Direction • Standard 2 – Governance and Leadership Resource Utilization • Standard 4 – Resources and Support Systems Team Member Off-site Review Work • Review/study Self-Assessment (SA) and Executive Summary (ES) – Are the artifacts relevant to standard indicators? – Does the artifact(s) inform the standard indicator? – How? • Use the External Review Team Workbook to record your review work: – – – – – – Questions to ask stakeholders Artifacts to review Patterns and/or trends Successes and/or challenges “Listen for’s” during interviews and presentations Potential powerful practices and opportunities for improvement • Review institution’s website – Insert website address 2014 Team Member Off-site Review Work • Review additional documents – Stakeholder Feedback and Student Performance diagnostics – System Improvement/Strategic Plan – Assurances • Team members should be prepared to share an overview of the evidence for their assigned standard and IEQ Domain during team meeting on-site (Sunday • Bring your laptop (optional) 2014 Observing Effective Learning Environments Purposes of observation • Team members will use the Effective Learning Environment Observation Tool™ (eleot™) • Identify and document observable evidence of the classroom environments conducive to student learning • Results used to corroborate information obtained from • • • • 2014 Interviews Artifacts Student performance data Stakeholder feedback data © 2014 AdvancED External Review Schedule Sunday - Arrival at hotel Team work session # 1 / Prepare for Day 1 Monday System presentation/Leadership interviews Interviews with stakeholders (BOE, System Level stakeholders) Evening work session # 2 / Prepare for Day 2 Tuesday School presentation Interviews with stakeholders / classroom environment observations Evening work session # 3 / Prepare for Day 3 2014 External Review Schedule Wednesday Clarify unknowns / interviews Work session # 4 (Final work session) - Discussions / Deliberations Prepare Exit Report Meet with Head of System / Superintendent Deliver Exit Report to stakeholders 2014 Logistics Insert the following information: • Hotel name, address, phone, website Check-in time • LE cell number • Team Work Session # 1 – insert meeting time • Team Dinner – insert time 2014 2014