ProConcrete SS7: Concrete Drawing Production: An Introduction/Quick-Start, with ‘Best Practices’ Recommendations © 2014 Bentley Systems, Incorporated Outline: Part 1) Part 2) Part 3) Part 4) ProStructures SS7 Drawing Production Theory Dynamic Views Workflow Basic components of Dynamic Views Dynamic Views and Drawing Composition (4 min) (11 min) (23 min) (11 min) Break Part 5) Part 6) Part 7) Part 8) 2d Rebar: Bar Labeling and Symbolization (14 min) 3d Modeling Best Practices (to enhance drawing quality and ease-of-use) (11 min) Printing/Plotting and Publishing to mobile devices (10 min) Customization and Dynamic View Setup/project administrator (4 min) 1h:28m 2 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated About: Approach: All drawing production (no modeling, no schedules). Build used: PowerProStructures 08.11.11.273 (SS7) Seed file: \WorkSpace\ProStructures\Seeds\Imperial3d.dgn Layout: This presentation is also available as a .ppt with embedded videos. Simple model used: Output: ProjectPackage.pdf 3 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Outline: Part 1) Part 2) Part 3) Part 4) ProStructures SS7 Drawing Production Theory Dynamic Views Workflow Basic components of Dynamic Views Dynamic Views and Drawing Composition (4 min) (11 min) (23 min) (11 min) Break Part 5) Part 6) Part 7) Part 8) 2d Rebar: Bar Labeling and Symbolization (14 min) 3d Modeling Best Practices (to enhance drawing quality and ease-of-use) (11 min) Printing/Plotting and Publishing to mobile devices (10 min) Customization and Dynamic View Setup/project administrator (4 min) 4 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 1) ProStructures SS7 Drawing Production Theory • Structural steel Design drawings (general arrangements), steel placing drawings, Shop drawings (AISC shown – similar world-wide): • Concrete Design drawings and rebar placing drawings (CRSI shown – similar world-wide): “Reinforcing bar placing drawings… provide the details and placing instructions so that the ironworkers can set the reinforcing bars into place in the formwork”. 5 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 1) ProStructures SS7 Drawing Production Theory • Some structural software products use the same workflow for structural steel drawings and concrete drawings: – Structural steel fabrication drawings are a combination of design drawings, single part drawings + placing drawings. – Concrete drawing production: • Design drawings convey design intent of concrete and rebar • Rebar typically fabricated from bar schedules and/or bar tags • Rebar placing drawings are for placing rebar and often re-use the design drawings • Bentley’s Rebar2PC project (2013-2014): Driver: Concrete Drawing Production – Need to display, label, dimension concrete shapes like a user wants to. – Need to display, label, dimension rebar like a user wants to. 6 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 1) ProStructures SS7 Drawing Production Theory • Structural steel: DetailCenter • Concrete: Dynamic Views and Hypermodeling 7 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 1) ProStructures SS7 Drawing Production Theory • Beginning with (Power) ProStructures SS7: Dynamic Views are the recommended best-practice method for producing drawings for concrete and rebar drawings. • DetailCenter remains the recommended best practice to produce steel fabrication drawings (and remains an option for concrete drawing production as well). Note: for precast concrete panels and other similar concrete objects, DetailCenter may be the best option. 8 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 1) ProStructures SS7 Drawing Production Theory ProConcrete SS7 provides two methods of displaying 3D rebar in drawings: 1) 2D views of the 3D rebar without any symbolization (drawing on left below) 2) 2D symbolic graphics (drawing on right below) Drawing with 3D rebar shown 9 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Drawing with 2D symbolic rebar shown Outline: Part 1) Part 2) Part 3) Part 4) ProStructures SS7 Drawing Production Theory Dynamic Views Workflow Basic components of Dynamic Views Dynamic Views and Drawing Composition (4 min) (11 min) (23 min) (11 min) Break Part 5) Part 6) Part 7) Part 8) 2d Rebar: Bar Labeling and Symbolization (14 min) 3d Modeling Best Practices (to enhance drawing quality and ease-of-use) (11 min) Printing/Plotting and Publishing to mobile devices (10 min) Customization and Dynamic View Setup/project administrator (4 min) 1h:28m 10 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 2) Dynamic Views Workflow Definition of “Dynamic Views”: (source: MicroStation Help file): Dynamic Views is a general name that encompasses several related technologies which share a common goal of making model analysis and documentation more interactive and intuitive. Gone are the days when designs were just static [snapshot] views. They are replaced by the ability to create live, intelligent sections of a design composition that update automatically (through the use of detailing symbols with fields and links) as the design evolves. 11 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 2) Dynamic Views Workflow (Terms) Dynamic Views: Terms and Definitions Design Drawing Model 12 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Sheet Annotation Part 2) Dynamic Views Workflow (Terms) Dynamic Views: Terms and Definitions Design Drawing Model Design Model: Drawing Model: Sheet Model: 13 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Sheet Annotation The 3D BIM model (.dgn) A 2D model container in which a Dynamic View is stored. A 2D or 3D model container that typically includes a referenced sheet border. Part 2) Dynamic Views Workflow (Terms) Dynamic Views: Terms and Definitions Design Drawing Model Design Model: Drawing Model: Sheet Model: 14 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Sheet Annotation Part 2) Dynamic Views Workflow (Terms) Dynamic Views: Terms and Definitions Design Drawing Model Sheet Annotation Design Annotation: 3D labels, model annotation Drawing Annotation: Labels, dimensions, notes, callouts appropriate for a drawing (includes 2D symbolic rebar labels and dimensions) Sheet Annotation: Only the notes, labels, callouts appropriate for a sheet (general notes, sheet name) 15 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 2) Dynamic Views Workflow (Terms) Dynamic Views: Terms and Definitions Design Drawing Model Sheet Annotation Design Annotation: 3D labels, model annotation Drawing Annotation: Labels, dimensions, notes, callouts appropriate for a drawing (includes 2D symbolic rebar labels and dimensions) Sheet Annotation: Only the notes, labels, callouts appropriate for a sheet (general notes, sheet name) 16 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 2) Dynamic Views Workflow (Terms) Dynamic Views: Terms and Definitions Design Drawing Model Sheet Annotation Design Annotation: 3D labels, model annotation Drawing Annotation: Labels, dimensions, notes, callouts appropriate for a drawing (includes 2D symbolic rebar labels and dimensions) Sheet Annotation: Only the notes, labels, callouts appropriate for a sheet (general notes, sheet name) 17 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated ProConcrete Workflow (Modeling) 3D DGN File 18 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Parent • All Rebar in ProConcrete must belong to a concrete object - either a ProConcrete parametric object or a promoted solid. • In the SS7 release, the 3D Rebar and the concrete object must be placed in the same DGN file. • Rebar may protrude outside the extents of it’s owner concrete (including entirely outside), and may extend over multiple other concrete objects. • Concrete and Rebar objects both have their own levels( ) colors, line weights, etc. Child (both reside in same DGN file) Dynamic Views Workflow (ProConcrete) 3D DGN File • All Drawing models with 2D symbolic rebar must be saved to the 3D DGN file containing the concrete and rebar. Leave this turned OFF if you want 2D symbolic rebar in DV’s. 19 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Dynamic Views Workflow (ProConcrete) 3D DGN File • Drawing models with no 2D symbolic rebar (3D only*) may be sent to another file OK to use Drawing Model DGN File 20 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated * see speaker notes Dynamic Views Workflow (ProConcrete) Real-world Project Workflow: Project 2015:001 DGN File 1 DGN File 2 DGN File 3 BIM Composite DGN • • • • • • 21 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Material lists/QTO Bar bending schedules Schedule simulation Clash detection Printing/Plotting/ Publishing Mobile app export Dynamic Views Workflow (ProConcrete) Real-world Project Workflow: Project 2015:001 DGN File 1 DGN File 2 DGN File 3 BIM Composite DGN • • • • • • Material lists/QTO Bar bending schedules Schedule simulation Clash detection Printing/Plotting/ Publishing Mobile app export Sheet Composite DGN 22 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Dynamic Views Workflow (ProConcrete) Real-world Project Workflow: Project 2015:001 DGN File 1 DGN File 2 DGN File 3 BIM Composite DGN • • • • • • Material lists/QTO Bar bending schedules Schedule simulation Clash detection Printing/Plotting/ Publishing Mobile app export Sheet Composite DGN 23 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Dynamic Views Workflow (ProConcrete) Real-world Project Workflow: Project 2015:001 DGN File 1 DGN File 2 DGN File 3 BIM Composite DGN • • • • • • 24 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Material lists/QTO Bar bending schedules Schedule simulation Clash detection Printing/Plotting/ Publishing Mobile app export Dynamic Views Workflow (ProConcrete) Another real-world Project Workflow: Project 2015:002 DGN File 2 DGN File 1 DGN File 3 BIM Composite DGN • • • • • • DV’s with 2D symbolic rebar Sheet Composite DGN 25 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Material lists/QTO Bar bending schedules Schedule simulation Clash detection Printing/Plotting/ Publishing Mobile app export DV’s without 2D symbolic rebar (3d rebar only) Outline: Part 1) Part 2) Part 3) Part 4) ProStructures SS7 Drawing Production Theory Dynamic Views Workflow Basic components of Dynamic Views Dynamic Views and Drawing Composition (4 min) (11 min) (23 min) (11 min) Break Part 5) Part 6) Part 7) Part 8) 2d Rebar: Bar Labeling and Symbolization (14 min) 3d Modeling Best Practices (to enhance drawing quality and ease-of-use) (11 min) Printing/Plotting and Publishing to mobile devices (10 min) Customization and Dynamic View Setup/project administrator (4 min) 26 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 3) Basic Components of Dynamic Views: 3-1: Clip volumes and Fitted Sections: • Clip Volume toolbox or window tool box (right click if not displayed) • CV’s are construction elements and have levels, right-click Apply • Handles, right-click/flip direction, stepped section clip volumes 3-2: Named Fences from Clip Volumes • View attribute – Clip Volume on/off 3-3: Clip Volume View Attributes: • Display styles for Forward, Back, Cut, Outside 3-4: 3-5: 3-6: Create Drawing from Clip Volume Reference Files (learn Activate/Deactivate), View groups, Models, Saved views (review) 27 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Outline: Part 1) Part 2) Part 3) Part 4) ProStructures SS7 Drawing Production Theory Dynamic Views Workflow Basic components of Dynamic Views Dynamic Views and Drawing Composition (4 min) (11 min) (23 min) (11 min) Break Part 5) Part 6) Part 7) Part 8) 2d Rebar: Bar Labeling and Symbolization (14 min) 3d Modeling Best Practices (to enhance drawing quality and ease-of-use) (11 min) Printing/Plotting and Publishing to mobile devices (10 min) Customization and Dynamic View Setup/project administrator (4 min) 28 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 4) Dynamic Views and Drawing Composition 4-1: 4-2: 4-3: 4-4: 4-5: Drawing composition commands Drawing creation and Sheet creation Dynamic Views and Project Explorer Add a Drawing view to an existing sheet Modifying the drawing scale 29 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Outline: Part 1) Part 2) Part 3) Part 4) ProStructures SS7 Drawing Production Theory Dynamic Views Workflow Basic components of Dynamic Views Dynamic Views and Drawing Composition (4 min) (11 min) (23 min) (11 min) Break Part 5) Part 6) Part 7) Part 8) 2d Rebar: Bar Labeling and Symbolization (14 min) 3d Modeling Best Practices (to enhance drawing quality and ease-of-use) (11 min) Printing/Plotting and Publishing to mobile devices (10 min) Customization and Dynamic View Setup/project administrator (4 min) 30 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 5) 2d Rebar: Bar labeling and symbolization Pre 5.0: Bar Marking (Positioning) 5-1: 5-2: 5-3: Rebar graphics: 2d and 3d 2d Rebar labeling and symbolization – (activate the drawing, work in the sheet) Dimensions, annotations, notes: • Drawing annotation: (activate the drawing, work in sheet) • Sheet annotation: (general notes, etc) 31 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Outline: Part 1) Part 2) Part 3) Part 4) ProStructures SS7 Drawing Production Theory Dynamic Views Workflow Basic components of Dynamic Views Dynamic Views and Drawing Composition (4 min) (11 min) (23 min) (11 min) Break Part 5) Part 6) Part 7) Part 8) 2d Rebar: Bar Labeling and Symbolization (14 min) 3d Modeling Best Practices (to enhance drawing quality/ease-of-use) (11 min) Printing/Plotting and Publishing to mobile devices (10 min) Customization and Dynamic View Setup/project administrator (4 min) 32 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Part 6) 3d Modeling-Best Practices (for best Concrete Drawings) 6-1: 6-2: 6-3: 6-4: 6-5: S7 provides new rebar levels, new level filters, new colored rebar patterns Item Browser (and publish iModel) Isolate command Display Sets & Named Groups Hypermodeling • Use: Levels, Level filters and Item Browser • Do not use: ProStructures Display Classes or Area Classes with rebar: – They do not allow different display settings in multiple Dynamic Views – Do not work across MicroStation reference files – File corruptions have been encountered in large models 33 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Outline: Part 1) Part 2) Part 3) Part 4) ProStructures SS7 Drawing Production Theory Dynamic Views Workflow Basic components of Dynamic Views Dynamic Views and Drawing Composition (4 min) (11 min) (23 min) (11 min) Break Part 5) Part 6) Part 7) Part 8) 2d Rebar: Bar Labeling and Symbolization 3d Modeling Best Practices (to enhance drawing quality/ease-of-use) Printing/Plotting and Publishing to mobile devices Customization and Dynamic View Setup/project administrator 34 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated (14 min) (11 min) (10 min) (4 min) Part 7) Printing/Plotting and Publishing to Mobile Devices 7-1: 7-2: 7-3: 7-4: 7-5: 7-6: Visible Edges: Dynamic vs. Cached Printing/plotting Batch printing/plotting with Print Organizer Creating a PDF with drawings, 3d model, bar schedules Publishing an iModel, publishing a mobile iModel for viewing on iPad/iPhone Automatically update output every time I exit a model? 35 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated Outline: Part 1) Part 2) Part 3) Part 4) ProStructures SS7 Drawing Production Theory Dynamic Views Workflow Basic components of Dynamic Views Dynamic Views and Drawing Composition (4 min) (11 min) (23 min) (11 min) Break Part 5) Part 6) Part 7) Part 8) 2d Rebar: Bar Labeling and Symbolization 3d Modeling Best Practices (to enhance drawing quality/ease-of-use) Printing/Plotting and Publishing to mobile devices Customization and Dynamic View Setup/project administrator 36 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated (14 min) (11 min) (10 min) (4 min) Part 8) Customization: Setup/Project Administrator 8-1: 8-2: 8-3: 8-4: 8-5: 8-6: Customizing your own Drawing Seeds (.dgnlib) Customizing your own Detailing Symbol Styles (.dgnlib) Customizing your own Display Styles (.dgnlib) Rebar: Default.def Rebar: Display.sys Rebar: Presets.sys 37 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated End 38 | WWW.BENTLEY.COM | © 2014 Bentley Systems, Incorporated