presentation

advertisement
INNOVENTUM
EXCLUSIVE DESIGNS TO THOSE WHO AFFORD
AFFORDABLE SOLUTIONS
TO THOSE WHO NEED
Exclusive design to those who can afford:
ART – INNOVATION – SUSTAINABILITY
Affordable solutions to those who need – to the
1.4 billion people with no electricity
Why InnoVentum is Unique?
DEDICATION &
PASSION!
DESIGN & BEAUTY!
CARBON
NEGATIVE
PRODUCTS!
VIRAL GROWTH
AMBITION!
UNIQUE R&D
APPROACH!
InnoVentum’s R&D platform draws on www.iknow-who.com
with a long Track-Record in Extreme Innovation Challenges
This Unique R&D Approach is applied to Develop
Wooden Structures and Hybrid Solutions
More than 6000 engineering hours were put in the
development of InnoVentum wooden towers, resulting
in the Dali XII – used as a base for the Dali PowerTower
All designs have been tested in 1:10 scale prototypes for
design validation
The Dali XII tower was tested in 2010 full scale in-house
for the measurement of all critical parameters and the
initial patent application was submitted
The Dali XII tower was further tested on site (on the
windiest island in Sweden – Öland)
After 12 months of testing, a second generation of the
Dali XII was developed resulting in an international
patent application (PCT)
In 2013, the Dali Tower was extended into a Dali
PowerTower and the Giraffe – hybrid solutions,
combining wind and solar energies
We leverage increasing returns on resources –
Delivering 5 times more energy per unit of material
Images
System
Dali
Performance
Dalifant
Enercon
2MW
E-70 E4
Enercon
3MW
E-82 E3
1 including
manufacturing, building, installing maintaining the sites
foundation x3
3 Screw foundation x8
4 Concrete foundation volume 350m3 – density 2500 kg/m3
5 Concrete foundation volume 500m3 – density 2500 kg/m3
2 Screw
Rated Power
Rotor Diameter
3,5 kW
4 m
11 kW
13 m
2 300 kW
71 m
3 000 kW
82 m
Tower
Type &
Height
Wood
12 m
Wood
20 m
Concrete
90 m
Concrete
138 m
Year ly
Production
6 m/s, kWh
7 736
Total Weight
RATIO
Tower: 0,70 T
Nacelle: 0,17 T
Rotor: 0,015 T
Foundation2: 0,06 T
Energy x 5,1
Power x 3
Weight x 4
=
Increasing
Return on
Materials
Total: 0,945 T
39 600
Tower: 2,85 T
Nacelle: 0,7 T
Rotor: 0,2 T
Foundation3: 0,2 T
Total 3,95 T
3 800
000
Tower: 680 T
Nacelle: 65 T
Rotor: 43 T
Foundation4: 875 T
4 900
000
Tower: 1180 T
Nacelle: 80 T
Rotor: 55 T
Foundation4: 1 250 T
Total 1 663 T
Total 2 565 T
Dalifant: 10,6 Wh per kilo of material used
Enercon: 1,9 Wh per kilo of material used
Energy x 1,2
Power x 1,3
Weight x 1,5
=
Decreasing
return on
Materials
Six months after starting R&D, the Giraffe had
already reached Spectacular Venues (I)
OFFGRID DECENTRALIZED POWER STATION AT THE EUROVISION VENUE
Powers lights, I;
W, outlets for electronic devices. It can become a perfect spot for picnics, children’s playgrounds and a
93F:7D;@9B>3578ADB7AB>7I:A7@<AKF:747@7WFEA86757@FD3>;L76D7@7I34>77@7D9KBDA6G5F;A@
Malmö Hyllie near Malmö Arena (Eurovision Song Contest 2013 venue):
Six months after starting R&D, the Giraffe had
already reached Spectacular Venues (II)
URBAN PARKING E-VEHICLE CHARGING STATION IN VÄSTRA HAMNEN, MALMÖ
Charging electric vehicles in urban environment. Preferred place for EV-related events and activities.
Malmö Västra Hamnen (Öresund Electric Car Rally & Green Vehicle Days 2013):
Everybody Loves the Giraffe!
Hundreds of private individuals post their Giraffe
pictures on Facebook – bringing renewable energy
closer to the people!
The Giraffe provides enough
energy in a year for an evehicle to drive more than one
tour around the world! EV
owners in Malmö can park and
charge for free!
Bringing Renewable Energy to New Levels
Stable Energy Production with Flat Energy Curve
Day and Night, All Year Round
Depending on choice of wind turbine, the Giraffe is able to produce 5 000 – 11 000 kWh
per year even in countries with low solar radiation and moderate winds – providing
power 24 hours a day, all year round.
Power to the People in disaster recovery
Restoring electricity to a
disaster area is vital for this area
to undertake urgent disaster
recovery activities.
After every disaster, it usually
takes months to bring electric
utilities in order so as to bring
the grid back to life. During all
those months, people of the
Philippines are left without
access to electricity.
To recover from such a disaster, access to electricity
source is vital for at least four areas:
1.  Refrigeration: preservation of medicines,
vaccines, food;
2.  Water: pumping and making the water
drinkable is impossible without electricity;
3.  Telecom, using phone or internet:
communication with families, rescue teams, Red
Cross;
4.  Light: the day should not be over when the sun
goes down.
Proposing a Sustainable Solution
The Dali PowerTower by InnoVentum is a
hybrid wind-solar energy station that is robust,
easy to install, and made of renewable or
recycled materials. It provides 4000-5000 kWh
of green energy per year – day and night
Each day 10 Dali PowerTowers will provide
130 kWh which is enough energy for:
-  50 LED lights
-  10 low consumption refrigerators
-  10 laptops or 50 mobiles phones
-  HotSpots for 100-500 users
-  1 High Volume atmospheric water generator
providing 1100 litres of fresh water per day
Why the Dali PowerTower?
Continuous energy production
hybrid wind-solar systems provide energy day and night.
Easy logistics
the wood is lightweight (compared to steel) and the construction is
modular to reduce transport volume
Typhoon- & earthquake-protected design
the construction is robust and allows for easy disassembly if
required. In collapsed position, the Dali PowerTower will be better
protected against typhoons. Protection against xylophagous insects,
larvas and termites will be required.
No negative effect on the environment
renewable energy is clean and use of wood makes the system
“carbon negative”– the wood used to make the structure had
captured at least 2 tons of CO2 before it took shape of the
PowerTower AND it produces energy without causing any
emissions of CO2 or pollutants.
Energy Production: Hybrid Wind-Solar Systems for a
Flatter and More Continuous Power Curve
Wind and solar energy are highly complementary: wind energy is generated mostly during nights
and colder months of the year, whereas solar energy is only generated during daytime, especially
in summer
"@F:;EI3K7@7D9KBDA6G5764K3:K4D;6I;@6
EA>3DBAI7DEF3F;A@:3E?G5:?AD77H7@XAIA8
energy production compared to pure wind or pure solar installations, thus solving the inevitable
sinusoidal curve problem that is regarded as the only drawback of renewable energy. Such
complementarity is the main principle utilised in a hybrid construction like the Dali PowerTower
900 6 solar panels Wind turbine Hybrid wind-­‐solar energy produc�on 800 700 POWER TOWER (6 PANELS)
600 500 ANNUAL ENERGY YIELD
(6 m/s): 5 730 kWh
400 300 200 100 0 Jan Feb Mar Apr May Jun All calculations made at Malmö latitude, average wind speed 6 m/s
Jul Aug Sep Oct Nov Dec Transportable and Easy-to-Install Solution
  ,:7FAI7D67E;9@:3E477@?367FAABF;?;L7
EB357
78W5;7@F>A9;EF;5EI;F:3FAF3>B35=397
volume of 1,2 m3
  No module is longer than 2 meters
  On-site-assembly based on clear manual
Tower on EU Pallet
All required bolts well-protected inside package
Assembling the Tower
The Intended Location for the First Dali PowerTower:
Hills of Grace near Manila
At present Children´s Mission Philippines – Hills
of Grace Foundation is working within three
major areas and a fourth area in development:
  Child Welfare: Malnutrition Center
  Open Heart Children´s Village
  Maternal and Child Health Program
  Youth Dental Care (in development)
Educational Programs:
-  Pre school, Day Care & Elementary school.
-  Sponsorship Program for Pre & Elementary
schools
-  High school and College
-  Skills Training
Description of the First Dali PowerTower Installation
Day I:
  Digging three 1 m3 holes for the foundation
 
Fitting the template with the 12 threaded rods into the 3 holes
to hold the 3 Dali PowerTower legs with perfect leveling
  Filling the holes with stones and concrete
Day II:
-  Assembling the Dali legs
-  Bringing all pre-assembled parts to the top of the hill (only a
small vehicle was able to climb the 120 meter high and very
steep hill – many parts had to be carried by hand)
-  Erecting the Dali PowerTower (by hand-held tools – no crane)
-  Fitting the PV panels
Day III:
-  Connecting the Dali PowerTower
-  Training locals how to operate the Dali PowerTower
On average, three days* are
required for the Dali
PowerTower installation –
;@5>G6;@9EG8W5;7@FA@
F:7
job-training of locals to
maintain the installation and
handle further installations
by themselves.
Multiple Dali PowerTowers
can be installed over the
same period of time, given
that additional workforce is
available.
* - meaning full working days (8-12 hours) Time in calendar
days can be different, weather- and workforce- dependent
Day 1: Preparation of the foundation
Day II: Assembly & Erection of the Dali PowerTower
Day II: Fitting the Solar Module
Fitting the Electrical Cabinet
The Dali PowerTower Installation is complete!
Day III: Our engineer Julien Daligault training the locals
Day III: Testing green electricity for various applications
Fan cooling
Refrigeration
Everyone is very
enthusiastic
about the Dali
PowerTower!
Seeing is Believing
The pictures above are not our advertising photos but pictures taken by private
individuals who posted them as part of our online photo competition The World is our Marketing Channel
(NOT) Hearing is Understanding
wood
Wood under the microscope:
Our solutions are so silent,
they have even been
installed on the roof of a
university library – at the
Blekinge Institute of
Technology in Karlskrona
(Sweden)
Read more at: http://www.innoventum.se/dali-performance/ More than100 mio SEK in IP Assets
9 Trademarks
9 Designs: 45 mio SEK
Sweden: InnoVentum (logo), Dali,
Folksnurran, turbo Beetle, Cash Cow,
Dalifant, Green Swan, Gröna Svanen.
Hulken (for the Hulk - the
predecessor of Dalifant in Swedish)
8 tower designs (including Dali)
3D7@AIA8W5;3>>KD79;EF7D76;@
the EU and published.
OHIM (EU-wide): InnoVentum
(logo), DaliRA8W5;3>>KD79;EF7D76;@
2013.
The opposition case with the Dali
AG@63F;A@;E@AIA8W5;3>>K5>AE76
InnoVentum has the chance to
register Dalifant trademark without
the threat of further opposition.
Planned 2014: Dalifant, Giraffe
Giraffe design is protected in
the EU, Japan and the USA
Patents: 72 mio SEK
Dali XII: PCT Application
WO2012/146447 entered
national stage. Patent
pending. The protection has
been pursued in the EU,
China and Hong Kong
Communication Achievements
Website Unique Visitors:
900 per month
Facebook fans:
2063
8-fold
4-fold
increase in
audience
since Dec ‘12
increase in
audience
since Dec ‘12
Publications in press (SE, FR, NL, JP): 42 2-fold
We are also present:
Flickr
LinkedIn
Twitter
YouTube
increase since
Dec ‘12
346
80
40
photos
followers
followers
(account opened
on May 12, 2014)
8
videos
(2071 views)
Exponential Brand Development Potential
A??7D5;3>;L3F;A@A>>34AD3F;A@I;F:GE;@7EE
Sweden – Extending our Global Reach
ü 
Oslo
ü 
Copenhagen
ü 
London
ü 
Berlin
ü 
The Hague
ü 
Tokyo
ü 
New York
ü 
Madrid
ü 
Hong Kong
ü 
Chicago
ü 
Nairobi
ü 
Manila
ü 
San Francisco
ü 
Sydney
ü 
Mexico City
ü 
Sao Paolo
GE;@7EE+I767@A??7D5;3>;L3F;A@&A67>
Support Activities
1.  %73667H7>AB?7@F8ADX39E:;B;@EF3>>3F;A@E
-  Using the deep relationships developed by Business Sweden to identify the most promising
;@EF3>>3F;A@ABBADFG@;F;7E+I76;E:5A?B3@KA8W57EEFAD7E&GE7G?E+5;7@57)3D=E+5:AA>E
- 
- 
Inviting InnoVentum Sweden to join important networking events AD9@;L76 by Business Sweden in the
respective countries (in particular, events related to renewable energy, renewable materials and
design)
AADAB7@;@9FA!;9:)DAW>767E;9@4GK7DE
2.  "67@F;W53F;A@3@6BD7
W>F7D;@9A8BAF7@F;3>>A53>;@H7EFADE;@"@@A.7@FG?
3.  "67@F;W53F;A@3@6BD7
W>F7D;@9A8BAF7@F;3>#.B3DF@7DEFA>3G@5:35A
AI@76
InnoVentum subsidiary in the respective country
4.  Bringing new visitors and followers to our digital channels
5.  Picking up phone calls and pre-qualify incoming leads
Proposing two different revenue models to
Business Sweden
  Traditional Remuneration Model:   WIN – WIN Remuneration Model: -  Business Sweden gets an average of
+$?A@F:3@6B7DA8W57
representing InnoVentum
-  When the local Business Sweden
InnoVentum representative acts on
follow-ups, the standard hourly rate for
SMEs is applied (900 SEK/hour?)
-  Sales made on behalf of InnoVentum do
not generate revenue for Business
Sweden
-  Business Sweden gets an average of 1500 SEK/month and per
A8W57D7BD7E7@F;@9"@@A.7@FG?
-  When the local Business Sweden InnoVentum representative
acts on follow-ups, no extra charge is applied
-  Instead, sales made on behalf of InnoVentum generate
revenue for Business Sweden. 10% commission is paid for
revenue fully captured by Business Sweden. 5% commission is
paid for revenue partly captured by Business Sweden and
partly by InnoVentum
-  This collaboration model may prove itself as a future business
model for Business Sweden AD3@KA8F:7FIA?A67>EI7EF3DFI;F:A8W57E(8W57EF:3F6A@AF97@7D3F7
any sales within 6 months will be discontinued – to allow for more focus on the
A8W57EF:3F4G;>6EFDA@94GE;@7EE53E7E
APPENDIX
Dali PowerTower can be equipped to give access
to Internet in remote areas
NO TELECOM NETWORK AVAILABLE
Off-Telecom Network
External antenna (ODU) Placed on the Power Tower for be�er recep�on Inmarsat Broadband Global Area Network (BGAN) 10 meters RF antenna cable 245U-­‐E Wireless Ethernet Modem 802.11 Wireless Ethernet for High-­‐Speed and Reliable Connec�vity Hughes 9502 BGAN M2M Terminal IDU Machine-­‐to-­‐machine satellite terminal Off grid electrical cabinet Control, manage, store energy Power Tower access across the world for energy monitoring, produc�on follow up, problem solving … TELECOM NETWORK REMOTELY AVAILABLE
"Telecom Grid Extender – Philippines Example" Remotely Available Network from Smart or Glode company Elins H720 Dual Module HSPA+ 3G Router -­‐ Dual SIM / Dual Module M2M with WiFi and Cold Or Hot Swap 3G Failover and basic load balancing Off grid electrical cabinet Control, manage, store energy Strong Media Attention – see more at
www.innoventum.se/innoventum/media/ Dec ‘12
21 articles/news
In SE, NL, FR
42 articles/news
In SE, NL, FR, JP
+21 articles JP;{JKI8EsDwE;8>;<E)-D8IJ)'()
bilister åkte fast utan bälte i Blekinge, när polisen gjorde sin
stora nationella bilbältesrazzia förra veckan. Totalt hittade
man 5 200 bilbältessyndare i landet.
k`ccJ\efi\e
#-&,*/(&
3
Nu kalkas sjöarna
Under helgen och på måndag kalkas sjöar och våtmarker inom Lillåns, Lyckebyåns, Silletorpsåns och Nättrabyåns avrinningsområden i Karlskrona kommun.
BFIK8EP?<K<I
D`jj_Xe[\c
g‚]\jk
RÖDEBY En deltagare
på en fest i Rödeby är
misstänkt för två fall av
misshandel.
Det hände kvart i tre
på natten till lördagen,
då en av festdeltagarna
var berusad och hade
somnat liggande på
golvet.
Den misstänkte
försökte väcka liv i honom, och när han inte
reste sig upp började
han slå och sparka på
denne.
En annan person
som gick emellan fick
två knytnävsslag i ansiktet.
;X^jYk\i
]iiXkk]pcc\i`
KARLSKRONA Dagsböter
blev tingsrättens dom
mot en 41-årig kvinna
från Karlskrona som
gjort sig skyldig till
rattfylleri och narkotikabrott. Hon ska betala
2 500 kronor i böter
samt en avgift på 500
kronor till en brottsofferfond. Hon stoppades
förra våren när hon
körde på väg till Holmsjö från Karlskrona.
Hon upplevde inte själv
att hon hade några problem med körningen.
Vid ett blodprov upptäcktes att hon hade
narkotika i kroppen.
?fkX[\
d\[cl]kg`jkfc
KARLSKRONA En 60-årig
man i Karlskrona
misstänks för olaga hot
efter att ha riktat en
luftpistol mot en yngre
man i lördags.
Luftpistolen hittades
vid en husrannsakan
som polisen gjorde.
Den hotade mannen
uppgav att han såg att
det inte var en riktig
pistol, och att han därför aldrig blev särskilt
rädd.
Jcf^jg‚jkXe
<BF<EKI<GI<E{I%J`^mXc[
?Xiipjjfej\i\ejkfidXib$
eX[]ijd‚jbXc`^m`e[biX]k%
=FKFD8KK@8JD8KK@JJFE
KARLSKRONA En 25-årig
man misstänks för två
fall av misshandel natten till söndagen i centrala Karlskrona.
Klockan 02 slog han
en man i ansiktet med
öppen hand utanför
Harrys och en timme
senare slog och sparkade han en annan man
på Klaipedaplatsen.
May ‘14
&76;3JBAEGD7;@#3B3@VE>736;@9&393L;@7
for Landscape Design:
1.4 pages in June
4 pages in August
6 pages in October in “the world leading sustainable cities”
special. (Article together with an article about Malmö
exceeded 30 pages in this special article.)
/73D7F:7?AEF;@F7D@3F;A@3>>KD75A9@;L764D3@6
among Swedish wind/solar energy providers!
ü  Website in 5 languages (professionally translated and maintained)
ü  Facebook in English (occasionally in Swedish) with followers from all
over the world (US, SE, UK, DK, FR, IN, GE, IT etc.)
ü  Media appearances in Sweden, France, Japan, the Netherlands
ü  Participation in exhibitions in Sweden, France, Italy, China
 
 
Website in Swedish (sometimes rudimental English, Google translate English)
Facebook/Twitter in Swedish only
 
 
&76;33BB73D3@57E@AFEB75;W76
J:;4;F;A@35F;H;F;7E@AFEB75;W76
InnoVentum has had an eventful
journey over the last 4 years!
Have a look at our milestones:
http://www.innoventum.se/company/
Download