Joint Polar Satellite System Program JPSS Program Overview Presented to Goddard Contractors Association November 17, 2010 Arlin Bartels Deputy Project Manager JPSS Flight Project 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 1 Joint Polar Satellite System Program JPSS Program Overview ● JPSS will be NASA/NOAA’s next generation of polar Earth observing science data satellites – Maintain continuity of climate observations and critical environmental data from the polar orbit – Increase timeliness and accuracy of severe weather event forecasts – Provide advanced imaging capability to analyze fires, volcanoes, Gulf oil tracking and other adverse incidents – Provide advanced atmospheric temperature, moisture and pressure profiles from space – Direct broadcast data to field terminals at hour scale latency JPSS 1 Satellite (NPP-clone) JPSS Launch Readiness Date JPSS 1 -2015, JPSS 2 - 2018 Program Architecture 2 Satellites (JPSS 1 & JPSS 2); 5 year operational design life Program Operational Life FY 2015 – FY 2026 Program Life-cycle FY 2011 President’s Budget* $11.9 billion * Program fully funded by DOC/NOAA 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 2 Joint Polar Satellite System Program JPSS Program Overview (cont’d) ● Administration decision on restructuring NPOESS announced in early February 2010 ● NOAA/DOD leadership agree to cooperate to ensure a smooth transition – Acquisition Decision Memorandum signed March 2010 ● NOAA/NASA management of JPSS Space Segment (PM Orbit) and shared Ground System with DOD ● Mid and early-AM orbits covered by EUMETSAT and remaining DOD/DMSP platforms ● Agencies will share data from each orbit to meet the national need for weather and climate information ● JPSS Space Segment to deliver most planned NPOESS observations for PM orbit ● Continue plan for operational use of NPP data (PM orbit) 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 3 Joint Polar Satellite System Program JPSS Program Overview (cont’d) ● ● ● ● ● GSFC is performing work on a reimbursable basis for NOAA JPSS Satellites operate in 13:30 (LTAN) orbital plane only Period of development/operations: through FY 2026 Launch Readiness Dates: FY 2015 and FY 2018 Maximum Data latency of 80 minutes at IOC and 30 minutes by FOC; 15 minute objective ● International partners provide some space segment components and/or data 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 4 Joint Polar Satellite System Program DoD option to move to am orbit 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 5 Joint SYSTEM Polar Satellite(JPSS) System Program JOINT POLAR SATELLITE PROGRAM ORGANIZATION Code 470 Code 470 Public Affairs Office C. O’Carroll Senior Scientist for JPSS J. Gleason JPSS PROGRAM OFFICE Associate Director/Program Manager for JPSS Preston M. Burch Deputy Senior Scientist for JPSS VACANT J. Buswell – Program Secretary Deputy Associate Director/Deputy Program Manager for JPSS Liz Citrin Deputy Program Manager/Technical for JPSS Mark Brumfield Chief Engineer A. Whipple Safety & Mission Assurance Mgr M. Delmont JPSS Program Business Manager Linda Greenslade Deputy Program Business Manager Margaret Pavlik Resources and Technical Support VACANT Code 472 JPSS FLIGHT PROJECT Project Manager C. Tooley Deputy Project Manager P. Sullivan Deputy Project Manager A. Bartels Deputy Project Manager/Resources TBD NOAA-NASA Liaison Manager J. Morris MA Lead for Transition Financial Spacecraft CSO Project Management Instruments CSO Contracts Inst. Systems Mgr. JPSS Observatory Mgr Procurement Manager S. Marshall Code 474 JPSS GROUND PROJECT Project Manager D. Devito Deputy Project Manager for O&S T. Zeiler Chief Engineer T. Trenkle JPSS-1 Mission SE P. Weinberger Deputy Project Manager for Dev/I&T J. Smith Mission SE & SME Team Deputy Project Manager/Resources G. Gaukler Financial Mgr. Mission System Engineering Project Support Mgr. S/W Management Mission Assurance Customer Liaison Security Mission Management Deputy ISM LV Interface Mgr. CrIS IM OMPS IM VIIRS IM ATMS IM I&T/Early Flt Ops Mgr. Command Control Comm. Segment Interface Data Proc. Segment Mission Operations Field Terminals Data Product Eng. Preston M. Burch, Acting Associate Director/Program Manager for JPSS 101117_AB_JPSS_GSFC_ContractorsAsn.ppt -- P R E L I M I N A R Y -- Data Products & Algorithms Date October 12, 2010 6 Joint Polar Satellite System Program JPSS Space Segment ● Designed for operation in afternoon orbit with a 13:30 LTAN ● Launch readiness date of January 2015 and January 2018 ● Compatible with existing and future polar ground sites (Svalbard, McMurdo) and Ka ground sites at mid latitudes ● Instrument complement includes – VIIRS, ATMS, CrIS, OMPS, CERES or ERBS ● Spacecraft – Clone of NPP bus ● EELV is launch vehicle – Likely Atlas V or Falcon 9 ● JPSS also accommodates: – TSIS Instrument on Free Flyer Spacecraft – SARSAT and A/DCS communication services on Free Flyer Spacecraft (TBC) 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 7 Joint Polar Satellite System Program JPSS Space Segment Payload Complement Sensors for JPSS 1 LRD 1/2015 Sensors for JPSS 2 LRD 1/2018 Instruments VIIRS CrIS X X X X ATMS X X OMPS Limb/Nadir CERES ERBS Nadir Only X Nadir and Limb TSIS X (TBD Platform) X (TBD Platform) Search & Rescue X (TBD Platform) ? Data Collection Low Rate Broadcast High Rate Broadcast X (TBD Platform) (TBD) X X (TBD Platform) X X X Services * Note: Maintain as option against future VIIRS development problems 101117_AB_JPSS_GSFC_ContractorsAsn.ppt Sensitive & Pre-Decisional Information 8 Joint Polar Satellite System Program JPSS-1 Based on NPP Design 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 9 Joint Polar Satellite System Program JPSS Instruments ● Advanced Technology Microwave Sounder (ATMS) and Cross-track Infrared Sounder (CrIS) – Provide profiles of temperature, moisture, and pressure ATMS CrIS ● Visible/Infrared Imager Radiometer Suite (VIIRS) – Provides daily high-resolution imagery and radiometry across the visible to longwave infrared spectrum ● Ozone Mapping and Profiler Suite VIIRS (OMPS) – UV and IR bands for ozone total column measurements ● Clouds and the Earth’s Radiant Energy System (CERES) OMPS 101117_AB_JPSS_GSFC_ContractorsAsn.ppt CERES – Supports studies of Earth Radiation Budget 10 Joint Polar Satellite System Program JPSS Ground Segment ● Command, Control, Communication Segment (C3S) – Includes MCC at NOAA/NSOF, Svalbard, McMurdo and Ka sites – Deployed for NPP, augmentation required for JPSS satellites – Capacity and flexibility to operate future DOD polar-orbiting satellites in morning orbit(s) ● Interface Data Processing Segment (IDPS) – Includes all hardware and software to process and disseminate data from satellites – Provides NPP and JPSS data and products to NOAA and DOD Centrals, to NOAA’s Archives and to NASA’s SDS (for NPP) • Presently Deployed for NPP at NOAA and AF Centrals, augmentation will be required for JPSS satellites • Deployed at Navy Central(s) for JPSS satellites ● Field terminal – Direct Transmission – Develop prototype system (h/w & s/w) for deployment by agencies and individual users 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 11 Joint Polar Satellite System Program JPSS Mission System Architecture GPS Space Segment TDRSS CERES PEATE NPP WSC LEO & A Backup T&C Command, Cntrl & Comm Segment Direct Broadcast User AFWA Central NESDIS Central Science Data Segment I/F Data Proc Segment Data Del GSE - Svalbard Primary T&C NPP SMD Data Del I&TSE Ocean PEATE NICSE Ozone PEATE Atmos PEATE SD3E Sounder PEATE DQM Infra Infra Data Mgt Data Mgt Ingest Launch Support Segment NSOF Mission Mgmt Center Suitland Ingest GRAVITE / NSIPS Archive & Dist Segment Data Handling Node Archive Interchange Data Routing & Retrieval Robotic Storage CERES Instrument Ops Team / System - LaRC Key: 101117_AB_JPSS_GSFC_ContractorsAsn.ppt Land PEATE NPP Mission Data Command and Telemetry Ingest Datastore Inventory Archiver Climate User Community 12 Joint Polar Satellite System Program Command, Control, and Communications Segment (C3S) NSOF Operations Floor occupied for NPOESS State 1 C3S Segment Features ● Satellite Operations & Mission Management ● Space/Ground Communications ● Global Mission Data Receive Network ● Data Routing/Retrieval ● Enterprise Management ● Builds directly upon the system designed and deployed for State 1 NOAA Satellite Operations Facility (NSOF) NPOESS Satellite T&C Station at Svalbard, Norway Black Island, Antarctica Upgrades for NPOESS data relay SafetyNet™ Ground Network to provide rapid Mission Data Receipt 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 13 Joint Polar Satellite System Program Interface Data Processing/Field Terminal Segments (IDPS/FTS) ● Processes Sensor data into RDRs, SDRs and EDRs ● Delivers data to Users Interface Data Processing Segment State 1 IDPS Racks installed at NESDIS – 4 Centrals at NESDIS, AFWA, FNMOC, NAVO – CLASS data archive ● Supports mission requirements with high performance and fast processing to meet operational latency ● ● Modular, Extensible, Flexible ● Field Terminal – based on technologies developed by GSFC Direct Readout Laboratory State 1 IDPS Racks at AFWA State 2/3 adds IDPS deployment to FNMOC and NAVO Centrals in addition to refresh of existing State 1 IDPS at NESDIS and AFWA Field Terminal Segment IDPS State 2/3 Builds on State 1 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 14 Joint Polar Satellite System Program Ground Station Sites Calculated 5 degree elevation coverage circles of current sites 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 15 Joint Polar Satellite System Program JPSS Operations and Sustainment ● At NSOF i.e. “NOAA Central” – Operate NPP, JPSS, and DWSS satellites – Operations transition from JPSS-led to NOAA-led at start of nominal operations – Operate future DoD polar-orbiting metsats; deliver raw data to IDPS at DoD Centrals – Operate and sustain C3S and IDPS for life of program – Conduct initial and recurring Cal/Val – Support all NOAA Field Terminal users and maintain the registration data base and key management center for all other users 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 16 Joint Polar Satellite System Program JPSS Transition Approach ● Acquisition authority delegated to NASA GSFC for PM orbit and ground system – Governance model per NMI 7120.5 – NASA becomes the Systems Integrator ● NPOESS PEO/IPO facilitates transition – To date, transition has been as transparent to ongoing work as practical ● Transferred work on Instruments/Ground System via GSFC letter contracts ● Standard contracts now in place for Ground, CrIS, OMPS, and Spacecraft – Remaining: VIIRS, ATMS, and long term 1394 support ● JPSS Program/Project Organizations defined and staffing is underway ● NPP Project will remain with the Earth Sciences Program at GSFC ● JPSS and NPP Organizations are being collocated in GSFC Building 40 (former Greentech IV Building) this week 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 17 Joint Polar Satellite System Program Summary ● JPSS will be a critical element in maintaining NOAA/NASA climate knowledge continuity from the afternoon orbit ● JPSS will improve weather forecasting and knowledge of transient Earth events ● JPSS will provide time-critical weather information for DoD and other personnel ● On behalf of NOAA, GSFC leads a large team of industrial partners to make this happen ● JPSS will continue to maintain a close collaborative relationship with DoD both during the NPOESS transition and throughout the mission ● To lessen programmatic risk, JPSS-1 is baselined as a clone of NPP ● JPSS provides the ground segment for the DoD DWSS Mission as well as the JPSS satellites ● Although moving offsite to Building 40, JPSS is still a fully-GSFC organization 101117_AB_JPSS_GSFC_ContractorsAsn.ppt 18 Joint Polar Satellite System Program JPSS Acronym List ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● AA Associate Administrator ADCS Advanced Data Collection System AFWA Air Force Weather Agency AHRPT Advanced High Resolution Picture Transmission AMSR2 Advanced Microwave Scanning radiometer 2 ATMS Advanced Technology Microware Sounder CERES Cloud and Earth Radiant Energy System CLASS Comprehensive Large Array Data Stewardship System CPD Capabilities Production Document CrIS Cross-Track Infrared Sounder CS Civil Servant C3S Command, Control, and Communications Segment DoD Department of Defense DUS Deputy Under Secretary EDR Environmental Data Record ERBS Earth Radiation Budget Suite FOC Final Orbital Capability FT Field Terminal FTEs Full Time Equivalents FTS Field Terminal Segment GCOM Global Changing Observation Mission GOES-N Geostationary Operational Environmental Satellite - N GS Ground System GSFC Goddard Space Flight Center HQ Headquarters HRD High Rate Data I&T Integration & Test ICD Interface Control Document IDPS Interface Data Processing Segment IOC Initial Orbital Capability IORD-II Integrated Operational Requirements Document - II JASD Joint Agency Satellite Division 101117_AB_JPSS_GSFC_ContractorsAsn.ppt ● ● ● ● ● ● ● ● JPSS Joint Polar Satellite System LRD Launch Readiness Date LRD Low Rate Data MMC Mission Management Center MOU Memorandum Of Understanding NG Northrop Grumman NASA National Aeronautics and Space Administration NESDIS National Environmental Satellite, Data, and Information Service ● ● ● ● NGAS Northrop Grumman Aerospace Systems NGST Northrop Grumman Space Technology NOAA National Oceanic and Atmospheric Administration NPOESS National Polar-orbiting Operational Environmental Satellite System ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● NPP NPOESS Preparatory Project NSOF NOAA Satellite Operations Facility OMPS Ozone Mapping and Profiler Suite OSD Office of Systems Development OSTP Office of Science and Technology Policy PMC Program Management Council RDR Raw Data Record SARSAT Search and Rescue Satellite-Aided Tracking SDE Selective Data Encryption SDR Science Data Record SDS Science Data Segment SMA Safety and Mission Assurance SMC Space and Missile Systems Center SMD Science Mission Directorate T&C Telemetry & Command TSIS Total Solar and Spectral Irradiance Sensor WBS Work Breakdown Structure USAF United States Air Force VIIRS Visible Infrared Imager Radiometer Suite 19