Project objectives 4 main objectives – – – – Increase MV/LV PV integration thanks to a “Network Energy Manager” Study and model customers response Operate a pocket of LV network on an Islanding mode Study business models 2 key features – Project based on ERDF Linky smart meter architecture – 3 levels of electricity storage Nice Grid Facts and Figures Site description Carros located in Southern France, in an “electrical peninsula” 10 500 inhabitants, with residential and industrial areas Already 1,8 MWp of solar PV Single 400 kV line supplying the area 88 secondary substations 20 MW peak load AVIGNON CARROS NICE 400 kV line MARSEILLE TOULON Use cases Optimize massive PV integration in the distribution grid Test islanding within a low voltage district Test 3.5 MW load shedding within the city of Carros Incentivize prosumer behavior Nice Grid Use Cases on a map PV Area 550 Linky clients 150 kWp installed Islanding area 12 Industrial clients 420 kWp installed Customer Behavior : 2600 Linky clients Cailletiers Pesquier Colombie Rosemarines Battery locations Lou Souleou Plaine 1 Docks Trachel Flexible Load Management Power PV generation Consumption Traditional Generation / Consumption curves Load shifting Power Time Generation / Consumption curves with flexible load management Flexibilities - + Time Nice Grid Batteries Sept. 2014 4 kW / 4 kWh 1 MW / 560 kWh Dec. 2013 33 kW / 106kWh Oct. 2014 250 kW / 620 kWh Nov. 2014 Nice Grid Architecture FLEXIBILITY REQUESTS OPTIMIZATION AND MANAGEMENT BIDS AGREGATOR B2B TRANSMISSION SYSTEM OPERATOR DEMAND RESPONSE REQUESTS NETWORK ENERGY MANAGER (NEM) AGREGATOR B2C CONSUMPTION FORECASTS D1 NETWORK AGREGATOR GENERATION FORECASTS D-1 www.grid4eu.eu Load shifting Average power consumption and generation in Watts 3000 +2300 Wh consumption per client between 12 PM and 4 PM 2500 - 1000 Wh 2000 consumption per client on previous off-peak block (no electrical boiler start) 1500 -1100Wh 1000 consumption during onpeak time (appliances shifting) 500 0 00:00 01:30 03:00 04:30 06:00 07:30 09:00 10:30 12:00 13:30 15:00 16:30 18:00 19:30 21:00 22:30 Average power consumption on 21 clients with solar off-peak hours Average reference power consumption for the 21 clients Average PV generation for 40 PV generators Source: ERDF, EDF R&D www.grid4eu.eu +200Wh consumption in total per client The Nice Grid Consortium Leaders Participants Academics, R&D Sponsors, Local Authorities