LA Metro’s Highway Program May 10, 2013 Construction Management Association of America (CMAA) Douglas R. Failing, P.E. Executive Director, Highway Program Highway Projects 2 State Route 710 North ! BUDGET Total Cost ($ mil.) Current $780 OK Forecast $2.6 – 5.4B* Current Construction Complete 2029 Alternatives Analysis Draft EIR/EIS Public Hearing Final EIR/EIS Record of Decision Secured Funds: Measure R - $780M Unsecured Funds: $1.82B – $4.62B *Potential P3 Opportunity * Denotes a range of cost for several higher cost alternatives SCHEDULE OK On target Possible problem Forecast 2029 Fall 2012 Spring 2014 Spring 2014 Summer 2015 Summer 2015 ! Major issue 3 State Route 710 North • Alternatives Analysis – completed in Dec. 2012 • http://www.dot.ca.gov/dist07/resources/envdocs/docs/ 710study/ • Alternatives: – No Build – Transportation System Management/Transportation Demand Management (TSM/TDM) – Bus Rapid Transit (BRT) – Light Rail Transit (LRT) – Freeway Tunnel 4 State Route 710 North Build Alternatives BRT LRT Freeway Tunnel* 5 Interstate 710 South EIR/EIS* ! SCHEDULE Cost Construction Complete Draft REIR/REIS Public Hearing Final REIR/REIS Record of Decision Begin Construction Current 2028 Forecast 2028 2014 2014 2015 2015 2020 2014 2014 2015 2015 2021 Multiple Early Action Study Projects with various schedules ! BUDGET Total Cost ($ mil.) Current $395 Forecast $6.75B Secured Funds: Measure R - $395M Unsecured Funds: $6.36B – TBD *Potential P3 Opportunity *Some of these funds will be utilized for I-710 Early Action Projects OK On target Possible problem ! Major issue 6 I-710 Early Action Projects BUDGET Total Cost ($ mil.) Current $26.8 Forecast $26.8 SCHEDULE various (see below) #APPR. PROJECTS BUDGET (000’S) COMPLETION Completed Ongoing Future 0 1 4 $ 000 $10,400 $16,400 N/A 2013 2018 TOTAL* 5 $26,800 2030 *Multiple projects to be programmed with various schedules through 2030 OK On target Possible problem ! Major issue 7 High Desert Corridor (Environmental) Cost OK BUDGET Total Cost ($ mil.) Current $65 SCHEDULE Forecast $65 Environmental Document Complete Funds include: STIP (GF), Measure R, Measure I, and federal earmarks • Scope includes Project Approval and Environmental Document (PA/ED) only Current 2014 Draft ED Circulation Public Hearing Final ED Record of Decision OK On target Possible problem Forecast 2014 2013 2013 2014 2014 ! Major issue 8 Accelerated Regional Transportation Improvements (ARTI) Project PROJECTS UNDER CONSIDERATION: • I-5 North Capacity Enhancements (Phase 2A: Truck Lane + HOV from SR-14 to Parker Rd.) •I-5 Pavement Rehabilitation • SR-71 Expressway Gap Closure (from I-10 to Mission Blvd.) • SR-71 Expressway Gap Closure (from Mission Blvd. to Rio Rancho Rd.) • Soundwall Package 10: I-210 Pasadena and Arcadia • Soundwall Package 11: I-405 & SR 170 in Los Angeles OK BUDGET Total Cost ($ mil.) Current $700 Funds include: Measure R, Prop C 25%, Toll Revenues and SHOPP OK SCHEDULE Current 2030 Forecast 2019 2013 RFQ 2013/14 RFP 2014/15 Financial Close Construction Complete 2019 2013 2013/14 2014/15 2019 Construction Complete OK On target Forecast $700 Possible problem ! Major issue 9 I-605 Corridor “Hot Spot” Interchanges BUDGET Total Cost ($ mil.) Current $590M* Forecast $590M* Secured Funds: Measure R - $590M Unsecured Funds: TBD OK SCHEDULE Construction Complete Current 2026 Forecast 2026 • Multiple projects to be programmed with various schedules through 2030 • Feasibility Study 2012 • Project Study Report 2013 • Preliminary Engineering 2014-2015 *Denotes current secure funding and not expected to cover Feasibility Study improvement needs. Project costs to be determined post Feasibility Study OK On target Possible problem ! Major issue 10 Arroyo Verdugo COG Measure R Operational Improvements Program BUDGET Total Cost ($ mil.) Completed Ongoing Future TOTAL SCHEDULE various (see below) Forecast $170 Current $32.4 BUDGET (000’S) #APPROVED PROJECTS 1 7 32 40 COMPLETION $ 575 $ 15,573 $ 40,852 N/A 2018 2020 $57,000 2020 Measure R provides $170.0 Million over 30 years of which $57 Million has been programmed in the Subregion for FYs 2010-2016. Ongoing is defined as projects with executed Funding Agreements. Future is defined as projects with future phases of existing Projects or first years funding of a Project is beyond FY 2013. OK On target Possible problem ! Major issue 11 Las Virgenes/Malibu COG Measure R Operational Improvements Program BUDGET Total Cost ($ mil.) Forecast $175 Current $91.8 #APPROVED PROJECTS SCHEDULE various (see below) BUDGET (000’S) COMPLETION Completed Ongoing Future 0 9 7 $ 0 $ 25,661 $ 66,139 N/A 2018 2020 TOTAL 16 $91,800 2020 Measure R provides $175.0 M over 30 years, $93.8 Million has been programmed for the Subregion by the Metro Board for FY’s 2010-16. Ongoing is defined as projects with executed Funding Agreements. Future is defined as projects with future phases of existing Projects or first years funding of a Project is beyond FY 2013. Possible problem OK On target ! Major issue 12 South Bay (I-405, I-110, I-105 and SR-91) Ramp and Interchange Operational Improvements Program BUDGET Total Cost ($ mil.) Current $176.5 Forecast $906 #APPROVED PROJECTS COG Admin/Development N/A Contingency/Reserves N/A Completed 3 Ongoing 18 Future 36 TOTAL 57 SCHEDULE various (see below) BUDGET (000’S) COMPLETION $ 6,754 $ 25,077 $ 2,152 $ 63,351 $ 94,806 2022 2019 2012 2022 2022 $192,140 2022 Measure R provides $906.0 Million over 30 years of which $192.1 Million has been programmed in the Subregion for FYs 2012-2019. Ongoing is defined as projects with executed Funding Agreements. Future is defined as projects with future phases of existing Projects or first years funding of a Project is beyond FY 2013. Possible problem OK On target ! Major issue 13 Upcoming Procurements A&E Professional Services, Motorist Services & P3 Services http://www.metro.net/projects/pm-dept/ (Highway Program Look Ahead Reports) 14 Highway Projects in Construction http://www.metro.net/projects/pm-dept/ (Highway Program Look Ahead Reports) 15 Questions? Douglas R. Failing, P.E. Executive Director – Highway Program Los Angeles County Metropolitan Transportation Authority – Metro FailingD@metro.net 16