Terrestrial & Cislunar Exploration technologies A post 9/11 Veteran owned concern http://yellowdragonblog.com A Carbon Tax fueled Social Security Sovereign Wealth Fund 810 334 4374 Fax 810 449 5484 UM Flint Student Business Incubator, #207 423 North Saginaw Street, Flint, Michigan, 48502 LinkedIn The use of mass manufactured NEO Scout CubeSat's to pioneer space science data sales Hypothesis and business plan; All of the component manufactures of the proposed deep space NEO scout pioneer the mass manufacture of 10 flight sets of components for 10 spacecraft At cost place their value and of the value of money through time (interest) sale the data for each spacecraft over ten years S or C corporation with shares equaling contributions from each partner from in kind equipment contributions Import Export bank financing to those partners in difficulty with end items Contributed items;10 flight sets from each contractor (A)(1)COTS NEA Imager, e.g. MSSS ECAM M-50, 10 flight sets contributed by Malin space flight s systems Value of 10 ECAM M-50,s ? Lessons learned by Malin in a first mass manufacturing experience? http://www.msss.com/brochures/c50.pdf Valued added and price? (A)(2) JPL Deep Space NanoSat Bus (based on INSPIRE) 10 flight sets built by a space act agreement? Or in house? JPL able and willing? If space act agreement which company? MSFC space act agreement to transfer Solar Sail manufacture To which company? (L.Garde) JPL space act agreement (A)(2) MSFC ~80 m2 Solar Sail (based on NanoSail-D) 10 flight sets (A)(3) JPL Iris, Inspire LGA (2 Pair) + Microstrip Array HGA, 20 fight sets Iris LGA and 10 flight sets HGA Contributed items;10 flight sets from each contractor (A)(4)Reaction Wheel Assembly, 3 X 10 flight sets (30) TRAC Boom Assembly, 2 X 10 flight sets (20) (A)(6)Command & Data Sys.: Radiation tolerant LEON3 architecture, 10 flight sets AustinSat Cold Gas Volume 10 flight sets (A)(8)BCT Nano Star Tracker1, 10 flight sets Spectrometer 4 X 10 flight sets (40) Battery , 10 flight sets EPS, 10 flight systems (A)(6) http://www.gaisler.com/doc/leon3 _product_sheet.pdf (A)(8) http://bluecanyontech.com/wpcontent/uploads/2013/06/BCTNano-Star-Tracker-datasheet1.1.pdf Customers; NASA as anchor tenant for data sales over a decade and hosted payload sales First Commercial NEO Scout to OSIRIS-Rex target image target and OSIRIS-Rex Second Commercial NEO Scout to ARM target, characterize the target for safe rotation rates before ARM launch third commercial NEO Scout to ARM target, visual of ARM during approach and capture Fourth commercial Scout with Mars Rover 2020, performs Phobos and Deimos reconnaissance Sun Jammer contractor as future S corporation partner L.Garde incorporated http://www.lgarde.com/space-propulsion.php Has the potential to be a follow on S corporation partner for larger solar sails in future production lots with a larger solar sail Each of these ten spacecraft sells data over a 10 to 12 year period; we are the Intelsat of deep space science And each spacecraft launches every year or every other year so NASA is billed accordingly Deep space CubeSat spacecraft are thought to cost $10 Million each, we believe mass producing copies of Lunar Scout could beat this price Lets assume $ 10 million per spacecraft as this is our profit over time 10 X 10 is $100 million our price If all spacecraft where in flight at the same time with payments billed over 10 years this would be a $10 million bill, But not all spacecraft would be in flight at the same time, the bill to the client would be less and spread over several decades. **** ****** this presents opportunity to us and the decadal survey community and the government, we could build flight sets 10 through 20 and add in small incremental improvements that get us closer to Sunjammer class inner solar system missions followed by deeper space Data sales and hosted payload The S corporation partners would not mind more immediate cash flow in the form of hosted payloads or a split payment schedule we received some cash flow sooner then 10 to 12 years, after all the customer now saves on “interest” If a customer wants to buy the spacecraft up front we will oblige (ITAR states if its in space already?)