Rand Water Capital Expenditure Programme John Critchley Tariff consultation 22 October 2014 CONTENT 1. Demand growth forecast 2. Augmentation & renewal plan to 2030 3. Capital budget 2 Background Customer base • Non-potable Historical growth Mines water Other Several decades of growth in the 3 to 6% per annum 4% Municipalities Resulted in increase from 1000 Ml/d in 1965 to 4000 Ml/d now Greater 11% Growth started to decline from aboutJohannesburg 1990 Growth in decade to 2011 averaged 2.5%Metro Emfuleni 35% Metro Projected 6% growth – Continued decline in annual growth rates Tshwane – Decline in both ‘natural’ Metro population growth and inward migration 15% 2% paEkurhuleni – Expect drop from current to 1% pa by about 2035 – Projecting further, could peak by Metro about 2070 24% – 4% – – – • Industries 2% 3 Demand Growth Projection to 2035 • Factors affecting growth – – – • Domestic usage = 70% of total Natural population growth, inward migration, system losses Major customers play dominant role Projected growth in demand – – – Projected demands contractually based on customer forecasts Projected population growth of 3 million from 2010 to 2030 Based on AADD of 4200 Ml/d for 2014 and 1.75% annual growth: Year 2020 2025 2030 2035 Average Demand (Ml/d) 4700 5100 5500 5900 4 Demand growth versus raw water AADD abstraction growth - excludes Authorised Users and WDM 6,500 Infrastructure planning projection 6,000 5,500 Flow (Ml/d) 5,000 Possible future abstraction licence 4,500 4,000 Current proposed abstraction licence 3,500 3,000 2,500 2000 2005 2010 2015 2020 2025 2030 2035 2040 Year 5 Demand growth scenarios and risks Response to Limitations • Potential for deferred capital expenditure, but: – Major projects have long lead times – Some existing infrastructure approaching full utilisation at peak periods – Require ‘headroom’ to take major infrastructure out of service for renewal • Location, location, location! – – • WDM initiatives not intended to prevent development Mismatch between areas of saving and development nodes Response – – First see effectiveness of WDM initiatives by location Complete current projects but defer future projects 6 Corporate Systems Note: Primary = Raw Water + Vereeniging + Zuikerbosch Primary Systems Booster Systems Rand Water Eikenhof Supply System Zwartkopjes Supply System Vereeniging Purification System Palmiet Supply System Mapleton Supply System Zuikerbosch Purification System Raw Water Supply System Corporate Systems Booster Primary City of Tshwane Palmiet system Eikenhof system Mapleton system Zwartkopjes system Primary systems Vaal Dam 9 Augmenting for 2015 to 2030 cycle Northern Jhb Central Jhb Southern areas Tshwane Ekurhuleni North west Jhb West Rand Rustenburg Eastern Tshwane Ekurhuleni Mpumalanga 10 Peak demand by pumping station Station Design capacity Projected peak day demands (Ml/d) (including WDM savings - indicative) 2020 (2025) 2025 (2030) 2030 (2035) 2035 (2040) Primary Systems Zuikerbosch 3900 4300 4800 5300 5800 Vereeniging 1400 1300 1300 1300 1300 Palmiet 1870 2000 2190 2380 2570 Mapleton 960 990 1080 1180 1270 Eikenhof 2000 1470 1610 1750 1880 Zwartkopjes 800 760 780 840 880 Booster systems 11 CONTENT 1. Demand growth forecast 2. Augmentation & renewal plan to 2030 3. Capital budget 12 Augmentation & Renewal Planning • Augmentation – Increase capacity to meet future demands (quantity & quality) – 20 year view of projects based on 35+ year view of demands – Projects connected to customers per system • Renewal – • Extend life of existing assets (replace, refurbish, upgrade) Integrated – – Many projects combine augmentation and renewal (eg pipelines) Integrate at plant, site and system level 13 Capital expenditure – top 15 projects Project Spend R(m) Augment Renew 2009 5-year 2015 AWS 1 Zuikerbosch scheme (System 5) 2770 58 Δ # 2 O6 Palmiet - Klipfontein augmentation 972 350 Δ # 3 Co-generation 422 142 Δ 4 B1, B2 pipelines refurbishment 325 25 Δ 5 Zuikerbosch filter house 1 upgrade 250 0 Δ 6 B17 Zuikerbosch - Palmiet pipeline 223 223 Δ # 7 H39 Klipfontein - Brakfontein pipeline 221 85 Δ # 8 Zuikerbosch - Chlorine plant 4 replacement 203 3 Δ 9 Vereeniging - Zwartkopjes system 201 1 Δ 10 B16 Zuikerbosch - Slangfontein pipeline 200 0 Δ 11 Kensington - Yeoville system 190 0 Δ 12 Panfontein upgrade 185 7 Δ 13 300 Ml reservoir storage (Soweto) 171 7 Δ 14 Palmiet Engine Room 1 upgrade 170 0 Δ 15 Replace M1 pipeline 163 10 Δ 6,666 911 51% 34% Total # # 14 Asset Portfolios • • • • • • • Buildings and property Civil structures Pipelines Mechanical Electrical Process Automation Infrastructure renewal Asset category Replacement value (Rbn) Design life (yrs) Annual renewal allocation (Rm) Pipelines 46 65+ 600 Civil 12 50 to 100 70 Mechanical 9 30+ 115 Process 7 15 to 20+ 115 Buildings 4 80+ 35 Electrical 1 20 to 30+ 25 Automation 1 5 to 10+ 10 Total 80 970 16 Infrastructure augmentation Providing for 2015 to 2030 augmentation cycle 17 Augmenting for 2015 to 2030 cycle Northern Jhb Central Jhb Southern areas Tshwane Ekurhuleni North west Jhb West Rand Rustenburg Eastern Tshwane Ekurhuleni Mpumalanga 18 Primary Systems – 1600 Ml/d growth from 2015 to 2030 Additional Purification Plant – 1200 Ml/d capacity Additional raw water pipelines and purification plant upgrades Purification plant upgrades Vereeniging and Zuikerbosch B19 raw water pipeline R65 million budget for 2014/15 Station 5 at Zuikerbosch 1200 Ml/d capacity in two phases R58 million budget for 2014/15 BG3 raw water pipeline 9 km x 3500 mm Complete 19 Augmenting for 2015 to 2030 cycle Northern Jhb Central Jhb Southern areas Tshwane Ekurhuleni North west Jhb West Rand Rustenburg Eastern Tshwane Ekurhuleni Mpumalanga 20 Palmiet System – 600 Ml/d growth from 2015 to 2030 Additional Engine Room – 600 Ml/d capacity Total 150 km of pipeline between 600 mm and 2100 mm diameter Diepsloot B17 Zuikerbosch - Palmiet pipeline H39 Klipfontein – Brakfontein pipeline R85 miilion budget for 2014/15 R223 million budget for 2014/15 O6 Palmiet - Klipfontein pipeline R350 miilion budget for 2014/15 Engine Room 3b at Palmiet station 600 Ml/d operational capacity R99 million budget for 2013/14 Zuikerbosch Purification & Pumping Station 21 Pipelines for augmentation Description Palmiet AugmentationExisting augmented Item lines Diameter (mm) Length (km) Required (year) 1.1 Zuikerbosch to Palmiet pipeline B4, B6, B10 2100 46 2017 1.2 Slangfontein cross connection B9 1300 3 2015 1.3 Klipfontein (partial) 1700 14.7 2017 1.4 Palmiet – Klipfontein pipeline (phase 1) O2 2100 18 2017 1,5 Palmiet – Klipfontein pipeline (phase 2) O2, part O5 1800 6 2025 1.6 Kwaggaspoort – Gomsand pipeline H22, H28 1000 9.7 2015 1.7 Shamrock Road – Northridge pipeline G28 1200 3.2 2014 1.8 Northridge – Airfield pipeline H3 900 5.8 2017 1.9 Brakfontein – Lyttelton pipeline H12 portion 1500 26 2022 1.10 Lyttelton – Kwaggaspoort p/line H14 portion 1200 6 2022 1.11 Brakfontein – Kwaggaspoort pipeline H25, H30 1700 21 2027 1.12 Kwaggaspoort – Hartebeesthoek pipeline H22, H28, H42 1200 15 2032 1.13 Hartebeesthoek – Rosslyn pipeline H18, H29 ptn 1400 7 2030 1.14 Rosslyn – Soshanguwe pipeline H16, H29 ptn 1200 8 2030 1.15 Kensington – Yeoville pipeline New route 1200 8 22 2022 to Brakfontein pipeline H12, H21, H27 Pipeline for renewal Age (yrs) Length (km) Palmiet Augmentation 68 10 G17 South Hills – Germiston Diameter Anticipated renewal plan (mm) (subject to final assessment) 940 Renovate if steel quality good If replaced increase diameter to 1200mm G18 South Hills - Wychwood 60 9 1140 Renovate if steel quality good If replaced increase diameter to 1400mm G19 Meyer’s Hill – South Hills 59 2 1240 Renovate if steel quality good If replaced increase diameter to 1400mm G25 Klipriviersberg – Butcher’s Hill 48 5 1450 Refurbish in phases H3 Signal Hill - Northridge 70 50 710 Replace and increase diameter to between 1000mm and 1200 mm diameter H4 Wychwood – Hurlevale 59 7 940 Renovate if steel quality good If replaced increase diameter to 1000mm J4 Main Reef Road – Knights Road 59 1,5 400 Replace and increase diameter to 600mm J5 Main Reef Road – Signal Hill 76 13 610 Replace and increase diameter to between 700 mm and 1000 mm diameter J6 Keswick Road – Churchill Avenue 65 2,2 760 Replace and increase diameter to 1000mm J7 Keswick Road duplication 60 0,9 730 Abandon O2 Palmiet - Klipfontein 42 33 1800 Refurbish in phases 23 10 year renewal plan for Palmiet ER 1 Objective Maintain design capacity (455 to 500 Ml/d), and standby capacity of 200 Ml/d Summary plan Major replacement programme over next 5 years, excluding building Last assessments Integrated PPCA – October 2013 (see document ……) Asset Portfolio Summary of assets Results of latest assessment Renewal proposals Buildings Brick building with RC sub-structure, pump room, control room, loading bay Building in fair condition and expected to exceed design life Civil Objective Structures Pump plinths Good condition Dependant on pumpset replacement Maintain design capacity with slight increase from 455 Ml/d to 500 Ml/d, and standby capacity of 200 Ml/d Pipelines Last assessments 700 mm diameter steel suction lines Some corrosion noted Integrated PPCA – October 2013 (see document ……) 600 mm diameter steel delivery lines Refurbish during shutdowns for pump replacement Electrical Motors Switchgear Incomers Motors in fair condition Switchgear in fair condition Replace motors and switchgear with pumps Mechanical 7 x 91 Ml/d capacity two stage pumps, 204 m duty head Suction & delivery isolating valves Overhead crane – 10T capacity Pumps beyond useful life, overhaul not practical Valves in fair condition Replace pumps in 2017 Process Not applicable N/A N/A Automation Control desk PLC panels Automation not to current RW standards Upgrade to current standards, existing project ……. Summary plan Estimated cost Maintenance only Major replacement programme over next 5 years, excluding building Refurbish valves with pipelines 24 Augmenting for 2015 to 2030 cycle Northern Jhb Central Jhb Southern areas Tshwane Ekurhuleni North west Jhb West Rand Rustenburg Eastern Tshwane Ekurhuleni Mpumalanga 25 Mapleton System – 300 Ml/d growth from 2015 to 2030 Additional Engine Room – 300 Ml/d capacity Total 90 km of pipeline between 1000 mm and 2100 mm diameter R5 Vlakfontein – Mamelodi pipeline R22 million budget for 2014/15 L17 Van Dyk’s Park – Brakpan Res pipeline S4 van Dyk’s Park – Rynfield pipeline Central Johannesburg M1 pipeline replacement Engine room at Mapleton station 300 Ml/d additional capacity B16 Zuikerbosch – Slangfontein pipeline 26 Southern and Central areas – 300 Ml/d growth from 2015 to 2030 Western and North Western areas – 400 Ml/d growth from 2015 to 2030 Lanseria H40 Weltevreden – Cosmo City pipeline C6 Zwartkopjes – East Rand pipeline replacement Soweto priority for WDM A6 Vereeniging – Zwartkopjes pipeline replacement B1, B2 pipeline refurbishment 27 CONTENT 1. Demand growth forecast 2. Augmentation & renewal plan to 2030 3. Capital budget 28 Capital budget for 2014/15 29 5-year Capital Expenditure (2015/19) forecast of R13 billion for continuing business System Augmentation (Rm) Renewal (Rm) Total (Rm) Eikenhof 492 694 1186 Mapleton 956 734 1690 Palmiet 2,106 929 3,035 Primary systems 3,641 2,096 5,737 Zwartkopjes 453 954 1,407 Total 7,647 (59%) 5,406 (41%) 13,053 (100%) Note: the share of spend going to renewal of existing infrastructure has increased from 30% to 40% over the recent past. It is intended to increase this share further to ensure continued functionality of ageing infrastructure Capital expenditure split between main plant categories • Continuing business Reservoirs 1% Pumping 18% Purification 26% Pipeline 55% Note: reservoir spend will increase towards the end of the 5 year business planning horison Page 31 Financial year 2018/19 2017/18 2016/17 2015/16 2014/15 2013/14 2012/13 2011/12 2010/11 2009/10 2008/09 R million Capital expenditure forecast 3000 2500 2000 1500 1000 500 0 20 Year View of Projects (as per IAMP) 16 18 28 31 32 33 36 2 3 8 10 21 30 37 14 26 34 12 17 25 29 38 23 20 35 39 99 2014 PMZ MPZ MPZ MPZ PMZ PMZ RWZ ZBZ EKZ EKZ EKZ EKZ EKZ EKZ EKZ EKZ EKZ EKZ MPZ MPZ MPZ MPZ MPZ MPZ MPZ MPZ MPZ MPZ MPZ MPZ MPZ PMZ PMZ PMZ PMZ PMZ PMZ PMZ PMZ PMZ PMZ PMZ PMZ PMZ PMZ PMZ PMZ RWZ RWZ RWZ VGZ VGZ ZBZ ZBZ ZBZ ZBZ ZBZ ZBZ ZBZ ZBZ ZKZ ZKZ ZKZ ZKZ ZKZ ZKZ ZKZ All 74% 74% 74% 74% 74% 75% 74% 81% Priority score 9 13 22 27 EXPENDITURE FOR THE PERIOD 2013 TO 2033 INCLUDING GROWTH PROJECTS Escalation: 6.0% p.a. Sys Priority 1.00 1.06 1.12 1.19 1.26 Score IDR Jun 13 Jun 14 Jun 15 Jun 16 Jun 17 Jun 18 Jun 19 Jun 20 Jun 21 Jun 22 Jun 23 Jun 24 Jun 25 Jun 26 Jun 27 Jun 28 Jun 29 Palmiet A 1 4 5 19 11 15 6 7 SUMMARY OF RAND WATER FORECAST CAPITAL Project (1) Comission BASE CASE by AUGMENTATION PROJECTS Brakfontein - Madibeng system (H33-H36) R5 Vlakfontein - Mamelodi pipeline L17 Van Dyk's Park - Brakpan Res N7, N8 pipelines B17/B18 Zuikerbosch to Palmiet pipeline H14 pipeline partial re-route BG3 pipeline Sedimentation tanks at Zuikerbosch S2&3 Total for current augmentation projects H40 Weltevreden - Cosmo City pipeline Q5 Remainder Eikenhof - Waterval pipeline F46 Waterval to Weltevreden pipeline Soweto 400 Ml reservoirs (2 x 200Ml reservoirs) F5 Krugersdorp to Randfontein 10km x 800mm 2020 Q3 Baragwanath to New Canada 10km x 1200mm 2025 Weltevreden 100Ml reservoir 2032 Roodepoort 100Ml reservoir 2025 Eik. pumping Station 400Ml/d pumps 2035 Roodepoort Booster Pump Station 100Ml/d x 95m 2024 S4 Van Dyk Park - Rynfield duplication 16km x 1800mm Mapleton Engine Room 3 Mapleton engine room upgrade 2 x 200Ml/d Bloemendal upgrade Bloemendal Upgrade - extra pump set B16 Zb - Slangfontein pipeline 19km x 2100mm 2023 Bronberg 100 Ml reservoir Brakpan to Secunda pipelines upgrade Bloemendal Eskom Upgrade Graham Road to Mamelodi 5 km x 1200mm 2020 Vlakfontein Reservoir 210Ml 2025 Palmiet Engine Room augmentation 800 Ml/d 2032 Garsfontein to Bronberg 9 km x 1200mm 2020 H39 Klipfontein to Brakfontein pipeline O6 Palmiet - Klipfontein augmentation Palmiet Engine Room 3b H42 Kwaggaspoort - Gomsand pipeline G37/H37 Shamrock Road - Airfield Hartebeesthoek 100 Ml reservoir Palmiet Eskom Upgrade Brakfontein to Lyttelton Heights 26 km x 1500mm 2020 Heights to Kwaggaspoort 6km x 1200mm 2020 Brakfontein to Kwaggaspoort 21km x 1700mm 2027 Kwaggaspoort to Hartebeesthoek 15km x 1200mm 2032 Hartebeesthoek to Rosslyn 7km x 1400mm 2030 Rosslyn to Soshanguve 8 km x 1200mm 2030 Klipfontein 250Ml reservoir 2020 Palmiet to Klipfontein O7 2036 Palmiet Engine Room 4 800Ml/d additional B19 Lethabo to Vereeniging pipeline Raw water canal upgrade to raise walls Raw water Zb (with Sys 5B) 1200Ml/d incl Forebay 2022 Vg to Amanzimtoti 10km x 900mm dia, plus pumps 2032 A15 Vg to Sasolburg 10km x 1200mm (portions) 2026 Zuikerbosch filter block 2b Zuikerbosch System 5A (600 Ml/d) Panfontein drying beds upgrade Panfontein drying beds upgrade2 2022 Panfontein drying beds upgrade3 2028 Zuikerbosch System 5B (600 Ml/d) 2024 Zuikerbosch Eskom upgrade 2014 Zuikerbosch System 6 (1200 Ml/d) 2040 Amanzimtoti expansion - phase 1 & 2 C25 Zwartkopjes - Meyer's Hill + MPS pumps Zwartkopjes Eskom upgrade Zb to Daleside pipelines 1000mm x 22km 2024 Daleside 40Ml reservoir 2019 T5 extension to Ennerdale Res 5km x 1000mm dia 2019 Daleside - Zwartkopjes A6 pipeline 19 km x 1400mm 2030 Other augmentation projects Total for planned augmentation projects Total for all augmentation projects 74% 74% 74% 62% 74% 74% 62% 62% 77% 77% 74% 77% 77% 77% 77% 62% 62% 74% 77% 74% 62% 77% 74% 74% 74% 77% 74% 74% 62% 77% 74% 74% 74% 74% 74% 74% 62% 74% 77% 74% 74% 78% 77% 74% 81% 78% 69% 69% 69% 78% 78% 77% 77% 74% 77% 74% 62% 74% 74% 2005 2005 2007 2008 2007/8 2005 2008/9 2009 2008 2025 2009 2009 2009 2009 2009 2009 2007 2007/8 2009 2009 2008/9 2009 2009 2010 2009 7 12 41 258 8 95 150 571 35 25 5 10 20 20 5 50 15 30 45 5 102 52 66 15 7 20 527 1,098 24 6 245 43 73 391 73 42 9 35 66 23 57 57 142 160 94 2 57 9 142 199 104 23 38 19 9 20 1,379 1,770 205 19 223 49 31 9 9 36 71 133 151 89 89 80 9 49 459 39 28 18 20 1,370 1,593 193 7 201 8 50 50 8 29 134 126 84 42 34 126 34 619 42 20 1,407 1,608 182 182 24 63 63 4 79 28 111 119 40 32 119 27 488 40 20 20 1,276 1,458 30 80 20 150 50 150 25 45 40 215 30 100 180 30 30 20 20 1,215 1,215 50 50 80 30 150 150 25 45 216 30 100 50 30 20 20 946 996 50 50 80 30 20 40 150 25 45 215 30 100 367 20 20 1,142 1,192 50 50 80 20 200 40 100 383 75 317 20 1,235 1,285 50 50 80 22 200 40 50 50 250 75 417 20 1,204 1,254 50 40 22 244 150 185 734 20 1,445 1,445 50 40 22 85 150 50 634 100 20 1,151 1,151 50 40 85 150 215 50 417 100 20 1,127 1,127 85 215 50 300 100 20 770 770 215 100 523 100 20 958 958 45 40 100 464 100 100 20 869 869 50 45 40 846 100 20 1,101 1,101 Jun 30 40 90 150 74 45 40 350 160 40 423 100 20 1,532 1,532 2034 40 90 80 170 74 350 160 40 50 20 1,074 1,074 Timing subject to WDM success BG4 Total Jun 31 Jun 32 Jun-33 40 90 80 100 74 350 160 40 20 954 954 90 90 350 40 300 20 890 890 231 12 47 1,083 8 138 249 1,768 165 173 167 463 84 150 120 120 360 66 397 138 250 136 40 644 120 600 23 75 255 470 135 393 940 427 264 295 105 2 646 90 645 222 135 120 300 1,400 480 426 84 1,235 160 150 292 1,997 209 150 200 2,519 23 2,906 111 125 9 500 80 60 300 420 23,571 25,339 33 THANK YOU 34