InstantSpot, a PanEuropean Model for Power Price and Flow From Mkonline.com Implicit Exchange & Price InstantSpot MKonline NO4 Explicit Exchange & Price Not included in IS. Yet • • • SE1 Exegenous exhange NO3 NO5 SE2 NO1 NO2 38 Individual price areas Price and flow simultaneously Updates each 15 min, 24x7 Aim, continuous update, 10 sec intervals. SE3 SE4 D1 D2 PL BE CZ SK HU SI NORD RS BA CNOR MK BU CSUD MK SUD Price and Flow forecasts Net Transfer Capacity Forecast Ensemble forecasts too PostFix update Commnets 3 times a day • Free BETA avaialbel for RO HR SARD • • • • • AL RO TRRO BLT, TR, and parts of SEE GR SICI AL Info: Hugo@MKonline.com, +47 9187 7970 1 InstantSpot, Updates During Work Hours EC12 Det and Ens Spot arrives. Actual simulated with overnight pricefeed updated andinstant price MKonline you the updated info. Spot comments EC00 Det arrives. EC00 Ens arrives. a comments are translates MWh development and e.g. are issued After EC00 Ens update. ContinuousContinuous update update issued changes into Euro/MWh for : Las update before Includes 8:40-10:00 Cet par effect on price -Priceinfo area, Fix Det update. After EC00 from new info arriving -When should you expect change Includes info 6:41-8:00 between 5 and 6 -Why does it change 8:40-9:55 PostFix Update. 6:41-8:00 Info arriving 12-15 is included EC12 Det and Ens -Prepinfo for DA+1 simulated with -Info on5-6. Intraday arriving between -Info for Balance EC00 Ens EC00 Det Cet par effect on price from 12 and 15. PostFix Actuals And on Price calc. And on 05 06 07 08 09 10 11 Pan European Price Formation, Montel conference 17.April 13 12 13 14 16 15 2 17 And on Evidence from the modelling: A Lesson Learned: 40% Started to include power flow and control the capacity assumptions. This reduced the model error dramatically 30% St.Err, IS/Conv DE MAE IS/Conv DE Is on par with Conv 20% 10% 0% -10% -20% 20-Jan 20-Feb 20-Mar 20-Apr 20-May 45% St.Err, IS/Conv FR 40% 35% MAE IS/Conv FR 30% Is on par with Conv 25% 20% 15% 10% 5% 0% -5% 20-Jan 20-Feb 20-Mar 20-Apr 20-May 200% 180% 160% 140% 120% 100% 80% 60% 40% 20% 0% 20-Jan St.Err, IS/Conv NPA MAE IS/Conv NPA Is on par with Conv 20-Feb 20-Mar 20-Apr 3