PATRONS OF ST. COLUMBAN FOUNDATION The goal of the foundation is to raise funds through bequests, government grants, personal donations and fundraising events to be used for capitol projects. Long term projects will include the repointing of the exterior walls, roof replacement, chimney and steeple work. A five year plan is in place Phase 1 – 2008 A- Total replacement of the Cornice and repairs to the roof valleys where some leakage has occurred. B- Front (south) Tower Section Wall Elevation. Work involves repointing all joints, repair and/replace damaged stones, reinstate relevant stone details, caulk windows and replace accessible tower flashing. Some work has been completed Stone work & re-pointing Gaps between stones Needs repair Stone needing repair Mortar needed Mortar work done Stone needing repair Repaired stone Stone work to be done Stone repaired & re-pointed Re-pointing done No gaps between stones Re-pointing done Stone needing replacement New stone New stone Stonework re-pointed No gaps Scaffolding & Fascia Restoration in progress Flashing coming away Fascia needing repair Restored Fascia Re-pointing done Restored Fascia Restored Fascia Plan for 2009 Phase 2 -2009 Front (southeast and southwest) wall elevations. Work involves re-pointing all joints, repair and/replace damaged stones, reinstate relevant stone details, caulk windows and doors and stabilize southwest corner. The 5 Year Plan Phase 3 -2010 Phase 4 -2011 Phase 5 -2012 More detail about the five year plan can be found on our website: www.stcolumbans.com PLEASE CONSIDER MAKING A DONATION