UCPath Implementation Update June 2013 UCPath Implementation Planning UCPath UCOP Project Structure UCPath UCOP Production Support Workstreams in Progress • • • • • • • • Vendor Management – Bob Baum UCPC Support Integration – Carrie Gatlin Juna LaMay Incident Management – Gary Keith Release Management – Wayne Templeton Change Management – Pamela Sampson-Smith Technical Access Management – Carrie Gatlin Service Design – Tara Brant Staffing – ITS Sr. Management Team Wave 2 Implementation Planning • Formal wave 2/3 implementation kick-off took place May 15th 2013 • Local UCD planning and resourcing has started for campus and UCDHS • All locations have requested UCOP for UCPath sandbox to help with local process analysis and implementation planning The work in front of us… Workstream Interface Development Data Conversion and Cleanup ODS, Local Reporting, Tier n Business Process Alignment Application Security and UCPath Access Identity Management (IDM) TAM & E-Per Change Management Communications Training Testing Interface Development Outbound flow Location Tier1 Nightly Incremental UCPath Location ODS Inbound flow Interface groups – – – – General Time and Attendance Parking SIS/Work study – – – – Commitment Accounting Base IDM 3rd Party Interface Development Color Key: Multi-Site Webinar Attendees Functional and Technical Owners Local work Workstream Kickoff Local Prep Detail Interface Walkthrough Local Workstream effort begins Follow-up Interface Walkthrough Site Specific Interface Walkthrough Common Challenges Update Site Specific Q&A Sessions On-going Mentoring & Support 1-on-1 UCPath/Locatio n Interface Development Activites – Step 1: Identify Interface Functional and Technical Owners – Step 2: Assemble Local Interface Inventory and Data Dependencies – Step 3: Assess Applicability/Availability of Reusable Code – Step 4: Evaluate ODS vs. Tier-1 Outbound Interface Options • Tier-1 Interface Files • ODS/Local Data Warehouse – Step 5: Review UCPath Functional and Technical Designs – Step 6: Attend the Tier-1 Interface Design Walkthroughs – Step 7: Create Schedule for Interface Development Interface Development UCPath Implementation Timeline Apr-13 Wave 2 Jul-13 Oct-13 Jan-14 Apr-14 Jul-14 Application Design & Dev & Location Dev Support (Incl TAM) Oct-14 Jan-15 Apr-15 Jul-15 Go Live Support Wave 3 Application Design & Dev & Location Dev Support Go Live Support UCD Interface Development Team Design, develop & unit test inbound/outbound interfaces and existing applications Lead: Anantha Kadur UCDHS: Mangesh Kamble Team Members:Jeremy Dalbeck, Nancy Wilson, Cindy Jones, Debra Henn, Jonathan Keller, Susan M Moore, Irene HorganThompson, Linda Durst, Penny Knutson, Jacqueline Velasquez Marion Randall, Curtis Bray, Tom Poage, Jamila Sahakian, Henry Xiang, Alex Alfieri, Pari Velji, Brian Waechter, Tim Olesen Brad Harding, Eric Rothgarn, Nathan Affleck, Luci M. Schmidl UCDHS Team: Fanny Tung, Michael Marchant, Jonathan Opie JoAnna Askew-Hill, Cecilia Labrado, Sharon Huckfeldt, Drew Pokorney, Ann Steele, Elisabeth Lippuner, Wanda Brown, Carol Shimada, Susana Lee Data Conversion and Cleansing Location Data Conversion and Cleansing Color Key: Multi-Site Webinar Attendees Functional and Technical Owners Local work Workstream Kickoff Local Prep Detail Activity Walkthrough* Local Workstream effort begins Follow-up Activity Walkthrough Site Specific Activity (non-PPS data) Walkthrough Common Challenges Update Site Specific Q&A Sessions On-going Mentoring & Support 1-on-1 UCPath/Location Data Conversion and Cleansing • Activities – Step 1: Local Preparation- Identify Data Conversion/Cleanup Contacts – Step 2: PPS Data Cleanup Activities – Step 3: Gather Non-PPS Data – Step 4: Perform GAP Analysis on Existing Staging Table Layouts – Step 5: Define and Review Key Data Sets Required for UCPath – Step 6: Copy Local PPS Instance – Step 7: Identify Test/Validation Population – Step 8: Validation Activities Step 2: Data Cleanup Requirements Data Cleansing Includes: • Eliminating unnecessary data records • Merging duplicated data • Identifying and correcting inaccurate or missing data • Reformatting and standardizing data so that it can be converted • Gathering information that does not exist in any legacy system but is required in UCPath Step 3: Gathering Non-PPS Data • Absence Mgt Balances • Department Budget * • Direct Deposit Bank * • Direct Deposit * • Emergency Contacts • Encumbrance * • Garnishment * • Garnishment Vendor * • Reports To* • IDM • Profile Degrees • Profile Licenses • AD&D Dependents * These data elements are more complex to complete Step 5: Define & Review Key Data Sets • Provide Department Tree Information • Provide and Review “Reports To” Information • Review Pay Groups • Review DOS Code Mapping • Review Salary Plans Data Conversion and Cleansing UCD Data Conversion Team Work closely with UCOP PMO to plan, execute and test the conversion and migration of campus data to from PPS to UCPath. Lead: Anantha Kadur UCDHS: Drew Pokorney Team Members: Elizabeth Ehnat, Mary Ann Beall, Cindy Jones, Kathy Stuhr, Theresa Schumacher, Bobbie Lasky, Gee Lee, Linda Durst UCDHS Team: Misti Lang , Sharon Huckfeldt, Janette Manuel, JoAnna Askew-Hill, Cecilia Labrado, Terri Maddera, Fanny Tung, Mangesh Kamble ODS, Local Reporting and Tier n Tier n analysis ODS Development and Local Reporting ODS, Local Reporting and Tier n • Activities – Step 1: Prepare Local ODS Team – Step 2: Identify Local Reporting and Tier-n Data Requirements – Step 3: Review ODS Design Documentation – Step 4: Schedule Site Specific Q&A Sessions – Step 5: Determine ODS Report Development Approach UCD expects to collaborate with other locations to reduce any duplication of efforts. Identity Management (IDM) • Activities – Step 1: Upgrade and Configure Shibboleth – Step 2: Provide Test Accounts – Step 3: Accept/Generate Test Messages and Responses – Step 4: Modify Internal Systems – Step 5: Support Two-Way SSL-protected SOA Endpoints for Message Receipt and Sending – Step 6: Provide Conversion Data to UCPath – Step 7: Perform Local Data Conversion – Step 8: Testing The work in front of us… Workstream Started Interface Development Wave 2 kick-off June 6th; UCD: In Planning Data Conversion and Cleanup Wave 2 kick-off June 4th; UCD: In Planning ODS, Local Reporting, Tier n UCD: In Planning UCD: Recruiting for lead/analyst Business Process Alignment UCOP kick-off Sept ‘13 Application Security and UCPath Access Identity Management (IDM) TAM & E-Per Change Management & Communication UCOP Status: In Planning UCD: In Planning; Recruiting UCOP Status: In Planning UCD: Recruiting for lead/analyst UCOP kick-off July/August ’13 UCD: Recruiting for lead Training UCOP kick-off Sept ‘13 Testing UCOP Status: In Planning