Timber frame: Re-engineering for affordable housing ZIRA | — ENVIRONMENT TRANSPORT REGIONS Digitized by the Internet Archive in 2023 with funding from Kahle/Austin Foundation https ://archive.org/details/timberframereengOOOOpitt WA 12 02541 WTI 0 A Timber frame: Re-engineering for affordable housing G C Pitts aN. TRADA Technology Report 2/2000 TRADA TECHNOLOGY © TRADA Technology Ltd 2000 ISBN | 900510 25 | Stocking Lane | Hughenden Valley High Wycombe Buckinghamshire HPI44ND UK Tel: +44 (0) 1494 563091 Fax: +44 (0) 1494 565487 email: information@trada.co.uk web site: www.trada.co.uk Contents IQOQASHIO -. Leaming Resources Centre Introduction 3 Core principles of a re-engineering strategy 5 Re-engineering for affordable housing: Concept ideas ff The re-engineered design solution 8 Details 10 References 16 Cover illustration: Drawing courtesy PCKO Architects TRADA TECHNOLOGY Whilst every effort is made to ensure the accuracy of the advice given, the company cannot accept liability for loss or damage arising from the information supplied. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the copyright owners. The author of this report is employed by TRADA Technology. The work reported was carried out under a contract jointly funded by the Timber Research and Development Association (TRADA) and the Secretary of State for Environment, Transport and the Regions (DETR). Any views expressed are not necessarily those of the Secretary of State for Environment, Transport and the Regions. YDETR ENVIRONMENT TRANSPORT REGIONS TRADA Technology gratefully acknowledges the sponsorship and thanks both organisations for their support. Thanks are also due to the individuals and organisations who participated in the advisory group for the project and companies which supplied materials for the models produced for demonstration: Sir Michael Latham Liquid Plastics Anchor Trust Housing Association Louisiana-Pacific (Europe) British Gypsum Marley Building Materials Ltd Peter Brown & Co PCKO Architects Bryant Homes The Proctor Group Caradon - Plumbing Redrow Homes Caradon (Mk) - Electrical Sodra AB Hanson Brick Velux/ Velfac HRV Design Hyde Housing Association Group Timber frame: Re-engineering for affordable housing: Introduction This document is aimed at affordable housing providers whether in the social and/or the private sector. In this context, the housing provider is termed ‘the client’ with the end user being ‘the customer’. The intention of the document is to raise awareness and interest in new ways to manufacture, procure and erect timber frame for the provision of affordable housing. “Increased housing need and building construction skill shortages changed much of the volume housing industry from craft-based brick-built homes to a wide variety of off-site prefabricated systems”. This quotation, dating from the 1960s is equally valid today. It is significant that the expectations surrounding most of the building systems developed in the 1960s were not realised and timber frame construction is the only mainstream survivor. Now, there is again an increased housing need and skill shortages but the expectations are even higher: ¢ Demand for consumer choice ¢ Reduced costs ¢ More predictable delivery ¢ Reduced defects and accidents ¢ Increased productivity. The government is also driving changes through initiatives arising from the Latham and Egan Reports. The traditional craft-based approach to construction cannot meet these expectations. Timber frame, as an already established prefabricated system, goes some way towards a solution. The timber frame construction method generally accepted in the UK comprises small prefabricated wall panels with trussed rafter roofs and floors assembled on site. Details are included in the Wood Information Sheet Introduction to timber frame construction and in the book Timber Frame Construction. However, a re-appraisal of the whole construction process, known as re-engineering, can deliver significant benefits. This document outlines the background and results of a TRADA Technology demonstration project to “Re-engineer affordable housing using a timber frame approach”. The project was jointly supported by the Department of the Environment, Transport and the Regions (DETR) and TRADA. The key aims of the project were: * To investigate existing timber frame benchmarks and best ¢ To set new benchmarks and improve on existing best practice through re-engineering timber frame. The research project (in addition to defining detailed manufacturing benchmarks) set general targets for completed housing as: practice. Reduce costs by 30% Reduce time to completion by 20% Reduce reported site defects by 50% Meet or exceed all existing performance criteria ¢ To meet the stated expectations above through Partnering (housing provider, designer, consultants and supply chain), Whole-Housing Thinking (not just a collection of parts eg frame, cladding etc) and Lean Production Techniques. ¢ To produce a practical, innovative timber frame system to deliver homes which can meet the demands of consumer choice. The re-engineered timber frame solution proposed in this document is intended to meet these aims and targets for clients. However, this can only be proven when the solution is adopted with significant numbers of units built. Core principles of a re-engineering strategy Any construction-related re-engineering exercise aims to: Eliminate: Simplify: Over production Waiting Times Integrate: Automate work which is: Technology Customers Difficult Problem Areas Suppliers Dirty Inventory/ Storage Production Flows Jobs Dangerous Waste Processes Contractors Dull Areas which typically offer scope for improvement and the changes which are needed to bring about such improvements are outlined below: Product design Aim to “Supply solutions; rather than address parts of a problem”. ¢ Improve IT links between designer, supply chain and clients to simplify and speed up data transfer ¢ Maximise off-site production ¢ Increase in-factory services integration ¢ Explore opportunities for “single skin” external wall construction ¢ Explore optimum standardisation of components but also ¢ Design only “open-system” homes (those with flexible internal layout) ¢ Always utilise the roof space as part of the house ¢ Eliminate waste. maintain design flexibility for consumer choice Client/Customer Provide “Service; not lip-service” Development ¢ Increase emphasis on partnering agreements between designers, clients and supply chain ¢ Explore “up-chain” opportunities for earlier involvement in the design process (eg, through Construction Management procurement) with designers and supply chain ¢ Expand customer choice through “open system” thinking for flexible layout ¢ Explore with key clients provision of more materials and components within the frame package to minimise site activities (higher quality/less defects) ¢ Explore with key clients the possibilities of forming groups or clubs to provide level “pull” (ie consistent production week on week) from the factory ¢ Production and Order Fulfilment Set benchmarks with regular improvement targets. Provide true “Customer choice; not a customer must adapt attitude” ¢ Minimise the number of supply chain partners ° Shift toward smaller supply chain packages for just-in-time ¢ Reduce space available for storage (if it’s there it gets filled) delivery * Decrease throughput time in the factory using “multi-skilled” personnel ¢ Do not accept waste ¢ Minimise stock levels of completed “house kits” ¢ Simplify erection processes to reduce site operations, improving quality and reducing defects — drive toward zero rework and recalls to site ¢ Set benchmarks with regular improvement targets. The details and proposals outlined above are essentially a list of opportunities and potentials for introducing improvements and efficiencies in the off-site production and procurement processes related to housing. Re-engineering for affordable housing: Concept ideas Four key concepts were used to focus the thinking for the re-engineering process relating the to provision of timber frame for affordable housing. These were: Standardisation versus Customisation * standardisation versus customisation * consumer choice * proposed changes to the Building Regulations * removing opportunities to get it wrong on site. The timber frame structural grid is normally 400 mm, 600 mm, or more radically, 1200 mm for studs, joists and rafters. A rigid discipline based on timber panel product sizes offers standardisation with minimal cutting of sheet materials to fit these grids. Adoption of a sensible grid size means a small number of standard wall, floor and roof panels. Special infill panels such as a roof window, a window/door panel or a floor “trimmed” panel offer design variability, but compromise standardisation. For dimensional freedom, variable-size pre-made corners can be used but again, purist’ standardisation is compromised. Consumer Choice “Compromised standardisation” leads to consumer choice but an “open system” building is also essential. “Open system” in this context is freedom of internal layout with no internal loadbearing walls throughout the dwelling. Another compromise of consumer choice is that due to practical and planning reasons, windows, doors, stairs and vertical services are largely fixed. Changes to Building Regulations Acoustics — Part E of the England and Wales Regulations will be revised. Timber party walls easily meet proposed new standards and compartment floors can improve beyond current standards. Thermal Performance — Part L of the England and Wales Regulations will soon have higher standards. To meet the proposed new requirements, timber frame stud sizes can be increased or the same stud size can be retained with a change to a more efficient insulation material. Air sealing — timber frame already exceeds current Part L requirements and can compete in the future, but a re-engineered system needs to do much better. Clients and consumers will increasingly demand higher levels of performance which will exceed minimum Building Regulation standards. Right-first-time principle With the open-system and maximised factory production, panels can be produced to only fit one way. Interlocking joints on each panel can provide a “fail-safe” mechanism on site. These joints enable positive panel to panel fixings that improve air sealing and the thermal performance of the building. Pre-drilling for panel connections with a single screw type minimises the chance for error and makes inspection easier. The re-engineered design solution The Frame Timber frame panels are based on a 1200 mm module for walls and 600 mm for floors and roofs, produced in standard long panels up to 12 min length. Dimensional flexibility is achieved through the incorporation of non- modular panels at junctions ie: * wall corner ° roof eaves and ridge ¢ floor stairwell. Wall panels are of storey height rather than floor to ceiling height. This provides continuity in the vapour control layer and insulation through the floor space and reduces the amount of differential movement. Interlocking joints at the top, bottom and sides of each panel ensure the right-first-time principle on site — if the panels do not interlock easily they are in the wrong place. The Wall The external wall uses reverse wall construction — moisture resistant plasterboard and oriented strand board (OSB) on the internal face and breather membrane, moisture resistant plasterboard or impregnated softboard on the outer stud face. 140 x 38 mm (minimum) studs are at 1200 mm centres — saving 40% in structural timber in the external walls and taking away the need for most lintels. OSB on the internal face, behind the plasterboard provides structural sheathing, robustness on the internal face, removes the need for noggings, forms a continuous air and vapour control layer and contributes to fire resistance. With cladding, joinery and an internal face of 9 mm moisture resistant plasterboard all fixed in the factory, immediate site weather proofing is provided. Interlocking panel joints ensure easy erection and right-first-time location and fixing. The U-value is 0.27 W/m2K for 140 mm mineral wool between studs. Other insulation and/or stud depth options can give similar U-values. The Floor The floor panel system is of broadly conventional construction. The prefabricated floor units are of closed panel, stressed skin design with 18 mm OSB deck glued and screwed to joists at 600 mm centres. Intermediate floor panels are hung from a ledger affixed at the top of the wall panel. Non-modular infill panels can be included if required. Intermediate floor panels include 140 mm insulation to enhance sound insulation with 15 mm moisture resistant plasterboard on the underside removing the need for noggings. Ground floor panels are similar to intermediate floors but include 200 mm insulation with a breather membrane on the under side; with mineral wool insulation giving a U-value of 0.2 W/m2K. Other insulation and/or joist depth options can give similar U-values. The Roof Prefabricated panels are used to form a useable roof space. Panel construction has purlins at 600 mm centres spanning to gable ends. Non-modular panels can be used at the eaves and ridge where required. The purlin approach takes out eaves thrust and removes the need for collar ties. The non-modular eaves panel gives the option of open or closed eaves; the ridge panel allows dimensional flexibility and any roof pitch. Each panel is factory finished with a 9 mm OSB wind bracing/vapour control layer and 9 mm moisture resistant plasterboard on the underside and a breathable underlay, battens and counterbattens above the purlins. Tiles or slates are fixed on site. With 200 mm mineral wool insulation the roof U-value is 0.2 W/m? K. Other insulation and/or purlin depth options can give similar U-values. Service Integration Fully factory fitted services include water pipes, telecommunication and electric wiring. Push-fit connectors are used to provide flexibility in design, easy installation in the factory and reliable connections on site. Vertical services are located in the special wall corner panels. Easy access is available for maintenance and future change. The Details Six key construction details are shown to illustrate the main principles. Pre-cast foundation - Ground floor panel - Wall panel: Section Oo | wen. Kel O) 10 Specification | External wall panel: 9 mm moisture resistant plasterboard on 18 mm OSB type 3 on 140 x 38 mm timber studs at 1200 mm centres with 140 mm mineral wool between and 12 mm impregnated softboard sheathing. Liquid DPC factory-applied to pre-cast concrete foundation. Bottom rail of wall panel with 50 x 38 mm timber fixed to form inside part of interlocking joint. 140 x 38 mm sole plate with 90 x 56 mm timber fixed to form outside part of interlocking joint. Vertical or horizontal timber batten to form drained behind cladding. and vented cavity Factory-applied cladding eg timber boarding, cement render on lath, brick slips Factory-applied “skirting” panel to accommodate horizontal service runs. Pre-cast “timber frame” concrete foundation beam to be set on pre-cast concrete piles. Ground floor panel: 18 mm OSB type 3 glued and screwed to 235 x 38 mm joists at 600 mm centres with 200 mm insulation between and Type 1 breather membrane to the underside. Stainless steel insect mesh to base of drained and vented cavity. 10 Storey height panel - Intermediate floor panel - Wall panel: Section Specification l External wall panel: 9 mm moisture resistant plasterboard on 18 mm OSB type 3 on 140 x 38 mm timber studs at 1200 mm centres with 140 mm mineral wool between and 12 mm impregnated softboard sheathing. Bottom rail of wall panel with 50 x 38 mm timber fixed to form inside part of interlocking joint. 140 x 38 mm top rail with 90 x 56 mm timber fixed to form outside part of interlocking joint. Vertical or horizontal timber batten to form drained and vented cavity behind cladding. Factory-applied cladding eg timber boarding, cement render on lath, brick slips. Factory-applied “skirting” panel to accommodate horizontal service runs. 235 x 38 mm edge beam factory fixed to wall panel with 63 x 388mm ledger to support bearing floor joists of floor cassette. 12 Intermediate floor panel: 18 mm OSB type 3 glued and screwed to 235 x 38 mm joists at 600 mm centres with 140 mm (sound absorbent) insulation between and 15 mm moisture resistant plasterboard below. i Special corner panel - Standard wall panels: Plan Specification External wall panel: 9 mm moisture resistant plasterboard on 18 mm OSB type 3 on 140 x 38 mm timber studs at 1200 mm centres with 140 mm mineral wool between and 12 mm impregnated softboard sheathing. 140 x 388 mm end stud of wall panel with 50 x 38 mm timber fixed to form inside part of interlocking joint. 140 x 38 mm end stud with 90 x 38 mm timber fixed to form outside part of interlocking joint. Vertical or horizontal timber batten to form drained and vented cavity behind cladding. Factory-applied cladding eg timber boarding, cement render on lath, brick slips. 12 Upper wall panel - Roof eaves panel: Section 13 Specification External wall panel: 9 mm moisture resistant plasterboard on 18 mm OSB type 3 on 140 x 38 mm timber studs at 1200 mm centres with 140 mm mineral wool between and 12 mm impregnated softboard sheathing. Vertical or horizontal timber batten to form drained behind cladding. and vented cavity Factory-applied cladding eg timber boarding, cement render on lath, brick slips. Tiles or slates. Tiling battens to suit tiles or slates. 50 x 38 mm counter battens. Roof panel: 9 mm moisture resistant plasterboard ceiling on 9 mm OSB type 3 wind bracing panel with 235 x 38 mm purlins at 600 mm centres with 200 mm insulation between and a “Roofshield” breather underlay above. Timber fascia. 72 x 38 mm “rafter” notched over purlins as an eaves dimension overhang with open or closed eaves). ladder (flexible 18 Notched eaves purlin. 19 Angled timber roof panel “stop” factory-fixed to topmost wall panel. 13 Ridge panel - Standard roof panels: Section Specification 20 Standard roof panel edge purlin with 50 x 38 mm timber fixed to form inner part of interlocking roof joint. 21 Standard roof panel edge purlin with 184 x 38 mm outer part of interlocking roof joint. 13 Tiling battens to suit tiles or slates. 14 50 x 38 mm counter battens. 22 Ridge special panel: Plasterboard, OSB, insulation and underlay all as standard panel, but with 235 x 38 mm timber as rafters between edge purlin and ridge board. Length and pitch can vary to suit design. 14 timber fixed to form Upper wall panel/Roof verge: Section 1 Specification External wall panel: 9mm moisture resistant plasterboard on 18 mm OSB type 3 on 140 x 38 mm timber studs at 1200 mm centres with 140 mm mineral wool between and 12 mm impregnated softboard sheathing. Vertical or horizontal timber batten to form drained behind cladding. and vented cavity Factory-applied cladding eg timber boarding, cement render on lath, brick slips. Tiling battens to suit tiles or slates. 14 50 x 38 mm counter battens. 15 Roof panel: 9 mm moisture resistant plasterboard ceiling on 9 mm OSB type 3 wind bracing panel with 235 x 38mm purlins at 600 mm centres with 200 mm insulation between and a “Roofshield” breather underlay above. 23 90 x 38 mm joint. timber fixed to roof panel to form outer part of interlocking 15 References EGAN, Sir John. Rethinking construction. Department ment, Transport and the Regions. London. 1998. LATHAM, TRADA Publications of the Environ- Sir Michael. Constructing the team. HMSO, London. 1994 Timber Frame Construction — Low-rise buildings. TBL 58. 3rd edition in preparation. Please contact the TRADA Information Centre for details. Introduction to timber framed construction. Wood Information Sheet 0-3. Timber framed building — materials specification. Wood Information Sheet 0-5. Prices and details of all TRADA publications are available from the TRADA Information Centre, Tel: 01494 563091 or from the website: www.trada.co.uk 16 of University Wales South Prifysgol Cymru De 7 Stocking Lane Hughenden Valley High Wycombe Buckinghamshire HP144ND UK Tel: +44 (0) 1494 563091 Fax: +44 (0) 1494 565487 Website: www.trada.co.uk
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )