Section 8 Chemical Stimulation Table of Contents Introduction ............................................................................................................................................... 8-5 Topic Areas............................................................................................................................................ 8-5 Learning Objectives ............................................................................................................................... 8-5 Unit A: Types of Acids.............................................................................................................................. 8-6 Hydrochloric Acid.................................................................................................................................. 8-6 Hydrofluoric-Hydrochloric Acid ........................................................................................................... 8-6 Additional Acids .................................................................................................................................... 8-6 Unit A Quiz............................................................................................................................................ 8-7 Unit B: Safety ............................................................................................................................................ 8-8 Safety Precautions.................................................................................................................................. 8-8 Unit B Quiz ............................................................................................................................................ 8-9 Unit C: Reactions of Hydrochloric Acid ................................................................................................. 8-10 HCL Reactions..................................................................................................................................... 8-10 Unit C Quiz .......................................................................................................................................... 8-12 Unit D: Corrosion Inhibitors.................................................................................................................... 8-13 Corrosion of Metals ............................................................................................................................. 8-13 MSA Inhibitors .................................................................................................................................... 8-14 Unit D Quiz.......................................................................................................................................... 8-15 Unit E: Carbonate Acidizing ................................................................................................................... 8-16 Matrix Acidizing.................................................................................................................................. 8-16 Expected Results .................................................................................................................................. 8-17 Types of Porosity ................................................................................................................................. 8-17 Fracture Acidizing................................................................................................................................ 8-17 Formation Core and Fluid Testing ....................................................................................................... 8-17 Tubing Movement Program ................................................................................................................. 8-19 Fracture Acidizing Plan Calculations .................................................................................................. 8-19 Acid Systems ....................................................................................................................................... 8-19 Additional Reference ........................................................................................................................... 8-21 Preflushes............................................................................................................................................. 8-21 Acid Placement Techniques................................................................................................................. 8-22 Unit E Quiz .......................................................................................................................................... 8-24 Unit F: Sandstone Acidizing.................................................................................................................... 8-25 Hydrochloric Acid................................................................................................................................ 8-25 Hydrofluoric Acid................................................................................................................................ 8-25 Damage Removal................................................................................................................................. 8-25 Reaction Rates ..................................................................................................................................... 8-25 Sandstone-2000 TM ............................................................................................................................... 8-26 © 2005, Halliburton 8•1 Stimulation I Chemical Stimulation Formation Conditioning....................................................................................................................... 8-26 Clays .................................................................................................................................................... 8-26 Secondary Precipitation ....................................................................................................................... 8-28 Acid Systems ....................................................................................................................................... 8-29 Unit F Quiz .......................................................................................................................................... 8-33 Unit G: Damage Removal – Mud............................................................................................................ 8-34 Mud Removal....................................................................................................................................... 8-34 Limestone Formations.......................................................................................................................... 8-34 Acid–Surfactant Mud Removal Solutions (MCA-III) ........................................................................ 8-34 Non-Acid Mud Removal Solutions (Mud-Flush) ................................................................................ 8-35 Sandstone Formations .......................................................................................................................... 8-35 Hydrofluoric-Hydrochloric Acid Mixtures (HF Acid)......................................................................... 8-35 Oil Base Muds...................................................................................................................................... 8-35 True Oil Base Muds ............................................................................................................................. 8-36 N-VER-Sperse ..................................................................................................................................... 8-36 Additional References.......................................................................................................................... 8-36 Unit G Quiz: Damage Removal-Mud .................................................................................................. 8-37 Unit H: Paraffins and Asphaltenes .......................................................................................................... 8-38 Paraffins ............................................................................................................................................... 8-38 Cloud Point and Pour Point.................................................................................................................. 8-38 Factors Affecting Paraffin Deposition ................................................................................................. 8-39 Loss of Volatile Constituents from the Crude...................................................................................... 8-39 Suspended Particles in the Crude......................................................................................................... 8-39 Conditions Favoring Paraffin Deposition ............................................................................................ 8-39 Paraffin Precipitation during Fracture Stimulation .............................................................................. 8-40 Methods Used to Remove Deposits ..................................................................................................... 8-40 Methods for Decreasing the Severity of Deposition ............................................................................ 8-42 Asphaltenes .......................................................................................................................................... 8-44 Targon® II Solvent ............................................................................................................................... 8-44 Unit H Quiz.......................................................................................................................................... 8-45 Unit I: Scale Removal and Prevention..................................................................................................... 8-46 Scale Effects......................................................................................................................................... 8-46 Types of Scale...................................................................................................................................... 8-46 Scale Formation ................................................................................................................................... 8-47 Scale Form ........................................................................................................................................... 8-47 Acid Soluble Scale Removal................................................................................................................ 8-48 Regular Inhibited Acid......................................................................................................................... 8-48 Penetrating Acid................................................................................................................................... 8-48 Non-Emulsifying Acid (NE) ................................................................................................................ 8-49 Fe Acid................................................................................................................................................. 8-49 Multiple Service Acid (MSA).............................................................................................................. 8-49 Paragon Acid Dispersion (PAD).......................................................................................................... 8-49 Acid Insoluble Scale Removal ............................................................................................................. 8-50 GYPSOL .............................................................................................................................................. 8-50 Liquid Scale Disintegrator ................................................................................................................... 8-50 Equations for Determining Volume of Scale Present .......................................................................... 8-52 gallons 15% HCL × 27.5906 ft 3 Acid Volume = 180 3 ........................................................................... 8-53 ft = 4966.308 gallons Scale Inhibition .................................................................................................................................... 8-53 © 2005, Halliburton 8•2 Stimulation I Chemical Stimulation Scalechek® Scale Prevention Service................................................................................................... 8-53 Scalecheck® HT ................................................................................................................................... 8-53 Calchek Service.................................................................................................................................... 8-54 Protex-All Inhibitor.............................................................................................................................. 8-54 Chemical Placement Technique (CPT)................................................................................................ 8-55 Unit I Quiz ........................................................................................................................................... 8-56 Unit I Quiz ........................................................................................................................................... 8-57 Unit J: Placement Aids ............................................................................................................................ 8-59 Temporary Bridging Agents ................................................................................................................ 8-59 Selection of Bridging Agent ................................................................................................................ 8-59 Well Completion Type......................................................................................................................... 8-60 Placement Techniques.......................................................................................................................... 8-60 Carrier Fluid......................................................................................................................................... 8-60 Concentration of Bridging Agent......................................................................................................... 8-60 Particle Size Distribution ..................................................................................................................... 8-61 MATRISEAL® O ................................................................................................................................. 8-61 Matriseal® OWG Diverter.................................................................................................................... 8-62 Temporary Bridging Agents in Conjunction with Temblok Diverting Materials................................ 8-62 Unit J Quiz ........................................................................................................................................... 8-63 Unit K: Job Calculations.......................................................................................................................... 8-64 Calculations for Spotting Acid to the End of Tubing or Packer .......................................................... 8-64 Calculations for Balanced Acid Spot ................................................................................................... 8-65 Calculations for Flush and OverFlush.................................................................................................. 8-66 Unit Quiz K:......................................................................................................................................... 8-67 Self-Check Test for Section 8: Chemical Stimulation............................................................................. 8-68 Answer Key ............................................................................................................................................. 8-70 Self Check Test .................................................................................................................................... 8-73 © 2005, Halliburton 8•3 Stimulation I Chemical Stimulation Use for Section notes… © 2005, Halliburton 8•4 Stimulation I Chemical Stimulation Introduction • Chemical stimulation is an important method of increasing oil and gas well production which, even today, is still experiencing rapid technical growth. Different processes have been used extensively since 1935. Job Calculations Learning Objectives Upon completion of this section, you will be able to: Topic Areas • identify the acid types The section units are: • list critical safety precautions • Types of Acids • • Safety • identify the primary corrosion factors and list the inhibitors that help decrease corrosion Reactions of Hydrochloric Acids • • Corrosion Inhibitors identify damage removal methods of mud, scale and paraffin • Limestone Acidizing • • Sandstone Acidizing identify acidizing treatments for limestone and sandstone • Damage Removal – Mud • identify types of acids • Paraffin and Asphaltene Deposits • identify inhibitors • Scale Removal and Prevention • calculate placement of acid • Placement Aids © 2005, Halliburton 8•5 Stimulation I Chemical Stimulation Unit A: Types of Acids Major acids used in chemical stimulation include hydrochloric acid, hydrofluorichydrochloric acid mixtures, and organic acids. This unit will explain the roles of these acids in chemical stimulation. Hydrofluoric-Hydrochloric Acid A Hydrofluoric-Hydrochloric (HF) acid mixture is the basic acid for treating sandstone formations with less than 20% HCL solubility. These mixtures are used for removal of damage caused by drilling mud, filtrate water, waterswollen clays, migrating clays, and other small formation particles. HF acid is typically prepared in the field by adding ammonium bifluoride (ABF) to HCL. Hydrofluoric acid is discussed further in Unit F, Sandstone Acidizing. Hydrochloric Acid Hydrochloric (HCL) acid containing inhibitors is the base solution for most oil field acidizing treatments. Depending on the use and requirements of the treatments, the concentration may range from 1% to about 35%. Hydrochloric acid reacts rapidly with carbonate formations and is used in treating sandstone formations. HCL can serve as the basic acid for damage removal in addition to matrix and fracture acidizing. Additional Acids Two organic acids also used are formic and acetic. These are weaker than hydrochloric acid and exhibit less corrosion problems than HCL; which means their hydrogen ions are released more slowly than HCL with most materials found in wells. Ten- percent formic acid will dissolve as much limestone as eight- percent HCL. Six percent HCL will dissolve as much limestone as ten-percent acetic acid. Due to their low degree of corrosiveness, organic acids can be used at higher temperatures for acidizing treatments. Acetic acid is the only acid that won’t damage chrome plating. It is useful for acidizing wells that contain pumps using chrome plated parts. Organic acids may be used with HCL to allow deeper penetration and to provide unique etching properties with some formations. Hydrochloric acid is a mixture of hydrogen and chlorine gases dissolved in water. This gas is called hydrogen chloride and is readily soluble in water up to 42% by weight at 60°F. However, a solution of this concentration is impractical since hydrogen chloride gas will come out of hydrochloric acid at temperatures above 60°F. Commercially available hydrochloric acid has been standardized at 20° Be (Baume). This is equivalent to 31.45% acid, by weight, with a density of 9.67 lb/gal. Higher concentrations of acid can be purchased at 22° Be, or 35.2% acid. It has a specific gravity of 1.179 and a density of 9.82 lb/gallon. © 2005, Halliburton 8•6 Stimulation I Chemical Stimulation Unit A Quiz Fill in the blanks with one or more words to check your progress in Unit A. 1. Two major acids used in chemical stimulation are ____________________ and ____________________. 2. Hydrochloric acid can serve as the basic acid for ____________________ ____________________ in addition to ____________________ and ____________________ acidizing. 3. Commercially available hydrochloric acid is standardized at __________ °Be or __________%. 4. Hydrofluoric – Hydrochloric acid mixture is the basic acid for treating ____________________ formations having 20% or less HCL solubility. 5. Two organic acids commonly used are ____________________ and ____________________. 6. ____________________ acid is the only acid that will not damage chrome plating. Now, look up the suggested answers in the Answer Key at the end of this section. © 2005, Halliburton 8•7 Stimulation I Chemical Stimulation Unit B: Safety • NO SMOKING around an acid tank. Tanks containing acid or that have had acid in them can have an explosive mixtures of gases and liquids trapped inside. Crude oil vapors mixed with air or hydrogen gas present in a tank is also a possibility. Hydrochloric acid reacts with steel to produce iron chloride and hydrogen gas—a potentially explosive situation. Safety is a top priority in all job procedures. Before pumping or handling acids or other stimulation chemicals, you should study the safety precautions given in the Chemical Stimulation Manual excerpts on HalWorld. This unit discusses several important precautions to use when handling chemicals on the job. • Even though an acid tank is coated with a sealant, there may be some exposed metal. Hydrogen gas could be present. Safety Precautions Some critical safety precautions are as follows: • Always add the water to the tank first and then add the concentrated acid. Never add water to acid or fill the tank with acid first. This increases the risk of splashing and can generate a large amount of heat. • Always wear rubber gloves when working around acid. • Goggles should be worn due to possible leaks in pump lines which may occur when acidizing a well under pressure. • Hydrogen, mixed with air in the ratio of one part per 24 parts, is an explosive mixture. For this reason, be aware of metal connections when loading hoses. They could strike the tank and ignite an explosion with the smallest of sparks. • Safety precautions should be taken when handling hoses during the loading of trucks or tanks or when disconnecting lines on a job. Acid may be left in the hoses. • It is always a good practice to notify personnel on location when acid is being used under pressure. All personnel should be kept at a safe distance. • Clothes contaminated with chemicals should be removed and thoroughly washed before wearing them again. Wash off any chemical spills with water immediately. • Acid pump trucks or transport trucks should be furnished with first aid kits containing soda (sodium bicarbonate) for acid burns. Drivers and operators should ensure that it is always accessible in case of emergency. A solution of one teaspoonful of soda to a pint of water should be kept for use in the eyes. Dry soda can be applied directly to the skin and then rinsed with water. DO NOT use dry soda in the eyes. • Wear a dust mask when handling powders. Inhalation of any powdered material can be irritating even if the chemical is not toxic. The safety rules given here are a few of the rules listed in the Chemical Stimulation excerpts on HalWorld. Be sure to study the remaining rules. An important section to be read in the safety section of the Chemical Stimulation manual on HalWorld is “Hydrogen Sulfide”. NOTE: When washing eyes, use a gentle flow of water when rinsing. You could damage an eyeball or even wash it out of its socket with a heavy stream of water. © 2005, Halliburton 8•8 Stimulation I Chemical Stimulation Unit B Quiz Fill in the blanks with one or more words to check your progress in Unit B. 1. Because of possible leaks in pump lines, ____________________ should be worn on chemical jobs. 2. First aid kits on acid trucks should contain ____________________ ____________________ that can be dissolved in water for treating acid burns. 3. Dry soda can be applied directly to the ____________________ but not to ____________________. 4. The possible presence of ____________________ ____________________ is one reason smoking is not allowed around an acid tank. 5. When working with acid and water, always put the ____________________ in first and then add the ____________________. 6. Wear a ____________________ ____________________ when handling powders. Now, look up the suggested answers in the Answer Key at the end of this section. © 2005, Halliburton 8•9 Stimulation I Chemical Stimulation Unit C: Reactions of Hydrochloric Acid Reaction rates and products are important considerations in acidizing. The various characteristics can have an effect on the choice of acid systems. Concentrations of HCL acid solutions may range from 1% to approximately 35% depending on the use and requirements of the treatment. It may be your responsibility to mix the various acid blends required in stimulation treatment applications. Tables like the following one have been developed to assist you in determining the proper amounts of concentrated acid and water to use when mixing an acid solution (see Table 8.1). These tables are usually posted in acid terminals. HCL Reactions When 1,000 gallons of 15% hydrochloric acid solution reacts with calcium carbonate (limestone), it will dissolve 10.9 cubic feet (1843 lb) of the limestone. The products resulting from “spending” the 15% HCL solution upon the limestone will be: Information for both 22 °Be and 20 °Be acid is given in the table. Before using the table, find out which of the two acid concentrations are being stocked in the service center. • 2050 pounds of calcium chloride (CaC12) To illustrate the use of the table, assume that 20 °Be acid is stocked in the storage tanks and that you need to mix 1000 gallons of 15% HCL acid solution. You need to determine how much water to add to the acid transport and how much strong acid to add to the water to make the solution. • 40 gallons of water (H2O) • 6620 cubic feet of carbon dioxide gas (CO2) at standard conditions The total volume occupied by 1000 gallons of 15% hydrochloric acid after the reaction is: • 912 gallons of water pumped into formation In Table 8.1, locate the heading “Gals 20 °Be Acid & Water To Make 1000 Gals Acid.” Under this heading observe that acid and water amounts are given in separate columns. In the extreme left-hand column “HCL% Acid” is given. Under this column locate 15 % and move horizontally across the chart. You will read 442 gallons of 20 °Be acid and 558 gallons of water required to mix 1000 gallons of 15% HCL acid solution. • 40 gallons water made by chemical reaction • 68 gallons of volume occupied by 2050 pounds of calcium chloride • 1020 gallons total, assuming no volume is occupied by the carbon dioxide gas or diluted by formation brine 15% hydrochloric acid spent on limestone becomes a 20.0% solution of calcium chloride having a specific gravity of 1.175 and weighing 9.79 lb/gal. © 2005, Halliburton 8 • 10 Stimulation I Chemical Stimulation Gals 22°Be Acid & Water To Make 1000 Gal Acid HCL % Acid Gals 20°Be Acid & Water To Make 1000 Gal Acid S. G. Acid Water Acid Water Wt. In lb/gal Hydrostatic psi/ft depth 1 1.005 2 1.010 3 1.015 4 1.020 5 1.025 6 1.030 7 1.035 8 1.040 9 1.045 10 1.050 11 1.055 12 1.060 13 1.065 14 1.070 15 1.075 16 1.080 17 1.085 18 1.090 19 1.095 20 1.100 21 1.105 22 1.110 23 1.116 24 1.122 25 1.127 26 1.132 27 1.136 28 1.141 29 1.146 30 1.153 31 1.158 31.45 1.160 32 1.163 33 1.168 34 1.173 35 1.178 35.2 1.179 Table 8.1 24 49 73 98 124 149 175 201 227 253 280 307 334 362 389 417 445 473 502 531 560 589 619 650 680 710 740 771 802 835 866 880 898 930 962 990 1000 976 951 927 902 876 851 825 799 773 747 720 693 666 638 611 583 555 527 498 469 440 411 381 350 320 290 260 229 198 165 134 120 102 70 38 10 -- 28 55 83 112 140 169 199 228 258 288 318 349 379 410 442 473 505 538 570 603 636 669 703 738 772 806 840 875 910 948 983 1000 ----------- 972 945 917 888 860 831 801 772 742 712 682 651 621 590 558 527 495 462 430 397 364 331 297 262 228 194 160 125 90 52 17 0 ----------- 8.83 8.42 8.46 8.50 8.54 8.59 8.63 8.67 8.71 8.75 8.79 8.84 8.88 8.92 8.96 9.00 9.05 9.08 9.13 9.17 9.21 9.25 9.30 9.35 9.39 9.43 9.46 9.50 9.55 9.60 9.65 9.66 9.69 9.74 9.78 9.82 9.83 .435 .437 .439 .442 .444 .446 .448 .450 .452 .454 .457 .459 .461 .463 .465 .468 .470 .472 .474 .476 .478 .481 .484 .486 .488 .490 .492 .494 .497 .499 .502 .503 .504 .506 .508 .510 .510 © 2005, Halliburton 8 • 11 Eqiv. Gal of 15% per 1000 gals 62 125 189 253 318 383 449 516 583 651 723 788 858 929 1000 1072 1144 1217 1290 1364 1439 1514 1592 1670 1747 1825 1902 1981 2061 2145 2226 2262 2308 2398 2481 2558 2573 Stimulation I Chemical Stimulation Unit C Quiz Fill in the blanks with one or more words to check your progress in Unit C. 1. 1000 gallons of 15% hydrochloric acid will dissolve __________ pounds of limestone. 2. The products resulting from the “spending” of 15% HCL on limestone are __________ pounds of calcium chloride, 40 ____________________ of ____________________, and __________ cubic feet of ____________________ ____________________ gas at standard conditions. 3. The total volume of 1000 gals of 15% HCL after spending is ____________ gallons. 4. If you have 20 °Be acid, how much acid and water are required for 1000 gallons of 10% HCL? __________ acid __________ water Now, look up the suggested answers in the Answer Key at the end of this section. © 2005, Halliburton 8 • 12 Stimulation I Chemical Stimulation Unit D: Corrosion Inhibitors and 85M, as well as the newer inhibitors HAIGE and OS. These inhibitors will not protect such metals as aluminum and magnesium from attack by hydrochloric acid. In addition, galvanized coatings and chromium plating will be attacked by inhibited hydrochloric acid. This is true with these inhibitors and with all other inhibitors, including competitive materials. Some types of chrome and steel alloys can be protected. Contact Duncan Research for further information about these alloys. Corrosion is defined as “the deterioration of a substance (usually a metal) because of a reaction with its environment.” In well stimulation, the primary concern is the reaction of acids on the well equipment, including tubular goods, during acidizing treatments. This reaction can be minimized by the use of corrosion inhibitors. There is a dual purpose for adding inhibitors to acid: the first is to protect our equipment and the second is to protect the customer’s well equipment. Several types of inhibitors are available for use in the oilfield. Acid corrosion inhibitors can be used up to about 500°F. At temperatures above 275°F a secondary component may need to be added. Two such components are Halliburton Inhibitor Intensifiers 124 and 500 (HII 124 and HII 500). Corrosion of Metals Several factors govern the degree of attack acid has on steel. The primary factors are: NOTE: When hydrochloric acid is mixed with acetic or formic acid, the inhibitors used for HCL are the inhibitors used in these mixtures. • temperature In general, the mixing procedures to follow when mixing hydrochloric acid and organic corrosion inhibitors together are: • time of contact • type of acid • The required volume of water is first added to the tank • pressure • type of steel • The proper, measured volume of inhibitor is added to the water and agitated • ratio of volume of acid to exposed steel surface area • The concentrated acid from storage is thoroughly mixed until uniformity is obtained. The longer acid is in contact with steel, the greater the amount of steel dissolved. The corrosion rate increases with increasing temperatures. You must remember that inhibitors do not stop corrosion; they only decrease the rate of corrosion. This rate of corrosion can be decrease to an acceptable level if the proper inhibitor type and concentration are used. Figure 8.1 shows the corrosion rate of 15% HCL with different concentrations of HAI85 on N-80 steel at 200 °F. Notice that the Halliburton standard is a “Maximum Total Corrosion Loss” of 0.05 lb/ft2 total steel dissolved over the life of the test. If the acid mixture requires additional additives, they may be added to the water prior to final agitation. It is very important that the steps of addition of material, agitation and blending be followed. Even if each chemical has been dumped into the tank, do not assume that uniform mixing will occur while being moved to the location. For more complete and detailed mixing procedures, refer to the confidential field bulletins for inhibitors found on HalWorld Inhibitors being used presently in hydrochloric acid are Halliburton Acid Inhibitors HAI-81M © 2005, Halliburton 8 • 13 Stimulation I Chemical Stimulation procedures for MSA-II inhibitor are the same as for other acid inhibitors. The Chemical Stimulation Manual on HalWorld should be used when determining amounts of MSA inhibitor to use. MSA Inhibitors Organic acids such as formic and acetic require an inhibitor other than HA1-81, 85M, or 72 E+. MSA-II and the newer MSA-III inhibitors are designed for use in these acids. MSA-II and MSA-III inhibitors are not recommended for use in hydrochloric acid solutions. Mixing Other inhibitors are designed for many purposes. You should become familiar with these inhibitors and their functions. Figure 8.1 © 2005, Halliburton 8 • 14 Stimulation I Chemical Stimulation Unit D Quiz Fill in the blanks with one or more words or check the correct answer to check your progress in Unit D. 1. The primary factors governing the degree of attack acid has on steel are: ________________________________________________ ________________________________________________ ________________________________________________ ________________________________________________ ________________________________________________ ________________________________________________ 2. ______ True ______ False Inhibitors will stop corrosion. 3. Above 275° F, secondary components such as ____________________ and ____________________ may be needed for better corrosion protection. 4. ______ True ______False Adequate mixing will occur if inhibitor is dumped into a transport and the transport is driven over rough roads to the location. 5. The Halliburton standard limit for corrosion, over which more inhibitor should be added is __________ lb/ft2 6. MSA Inhibitor is required when you use ____________________ acids. Now, look up the suggested answers in the Answer Key. © 2005, Halliburton 8 • 15 Stimulation I Chemical Stimulation Unit E: Carbonate Acidizing maximum production is the result of minimum damage. Successful acidizing in limestone and dolomite formations depends on a productive drainage pattern formed by the action of the acid. One or a combination of the following ways that acid invades a formation accomplishes this: (1) entering natural existing fractures (2) entering cracks caused by hydraulic fracturing (3) entering the permeability of the formation The extension of an effective drainage pattern into a productive zone requires deep penetration into some formations regardless of whether the crevices exist naturally or are artificially made. WELLBORE Penetration is dependent upon the permeability, porosity, oil saturation, the amount of productive interval, the formation pressure and the depth of the zone. PRESSURE IN FORMATION Unplugged flow paths should exist from the wellbore face to the outer limit of the formation. Therefore, it is important that reaction products and acid insoluble fines, which have been dislodged by the chemical action on the formation, be removed after acidizing. PRESSURE DROP ACROSS SKIN Matrix Acidizing WELLBORE PRESSURE Matrix acidizing consists of treating at a rate and pressure low enough to avoid fracturing the formation. This allows treatment of the natural permeability, whether it is between the grains of rock, in the vugular spaces of limestone or in natural fractures. Figure 8.2 - Schematic of a damaged well. Top view with oil or gas flow. Side view with pressure drop. The skin factor can be reduced if near-wellbore damage is removed or if a highly conductive structure is placed in the formation. In either case, the result is an increase in the production rate of a well and/or the reduction of the drawdown pressure differential. Decreased drawdown can help prevent formation collapse in weak formations, reduce water or gas coning, minimize both organic and mineral scaling, and Matrix acidizing enhances well productivity by reducing the skin factor. Skin is the term used to quantify damage that occurred to the formation during drilling and completion. Damage occurs in all stages of the life of a well, and it is impossible to completely eliminate this phenomenon. But, to produce hydrocarbons at an economical and profitable rate, maximum productivity is usually desired. In radial flow, © 2005, Halliburton SKIN OR ZONE OF DAMAGE 8 • 16 Stimulation I Chemical Stimulation help ensure that a greater percentage of the completed interval contributes to production. Fracture Acidizing Matrix acidizing should be considered when damage is present or when a water zone or gas cap is close and fracturing could result in high water production or excessive gas/oil ratio. Most limestone and dolomite formations have low permeability. Acid injected into these low permeability formations, even at moderate rates, usually result in a fracture type acid treatment. Fracture Acidizing is the most widely used treatment for limestone and dolomite formations. The success of a fracture acidizing treatment depends upon the ability to create a conductive fracture with enough length and height. Most fractures are vertical, and the productivity should increase as the vertical fracture height approaches the formation height. The productivity should also increase as the fracture length approaches the drainage radius of the well. Of course, the fracture must have adequate flow capacity so that produced fluids will have a passageway from the formation into the well bore. Expected Results Results from matrix acidizing depend upon the type of permeability and porosity present and the presence and extent of any formation damage. For example, assume that flow from a producing limestone or dolomite is radial and the permeability near the wellbore is the same as it is deep in the formation (no damage). In this case, an increase in the permeability due to acidizing in the immediate vicinity of the well will give a relatively small increase in the production capacity of the well. In fact, if the acid completely dissolves the limestone or dolomite up to a radius of five feet, the production capacity of the well can be increased by only 65% maximum. However, if the well is partially plugged, and the damage can be removed to a radius of five feet around the well bore, the production capacity can increase by as much as 350%. To achieve good fracture extension and adequate flow capacity, an acid that has low fluid loss and produces good flow capacity should be used. Formation Core and Fluid Testing The following tests performed on formation core samples are useful in planning acid treatments. Types of Porosity In the fluid loss test, fluid is forced through a core plug cut from a submitted core sample. A differential pressure of 1,000 psi is used, and the test temperature duplicates the bottom hole temperature of the well. Various types and quantities of fluid loss additives are tried in order to establish the most effective additive to use in the preflush and the acid. The fluid efficiency of the acid and water preflush can be determined from these tests. These fluid efficiencies are used in calculating the created fracture area. When the porosity is intergranular (between grains) and the formation is the same all over (homogeneous), then matrix acidizing of this type of formation might produce approximately a 60% increase in production if no damage exists. Should damage exist, much larger production increases could be expected. If the porosity is vugular (large holes), the formation is homogeneous, and no damage exists, then production increases in the 100150% range are possible. If damage exists, then greater production increases can be expected. If there are naturally occurring fractures in either a vugular or intergranular type formation, then production increases of several hundred percent might be possible. © 2005, Halliburton 8 • 17 A rotating disc reaction rate apparatus is used to determine the true surface reaction rate and order of reaction of the formation to be acidized. Another test involves determining fracture flow capacity from acid etched cores. On of the differences between fracture acidizing and Stimulation I Chemical Stimulation conventional water frac or oil fracs is that usually no propping agent is used. The acid produces flow capacity by removing limestone or dolomite from the fracture faces. However, laboratory tests indicate that certain types and concentrations of acid can create more fracture flow capacity. are placed together, and pressure is applied. The resulting fracture flow capacity can then be measured. The etching time is also important. Laboratory etching tests determine the etching time and type acid which produce the maximum flow capacity. These tests are conducted by placing two core faces in a chamber approximately 0.1 inch apart. Acid flows radially across this simulated fracture at 1,000 psi pressure and at simulated bottom hole temperature. After a certain etching time, the cores are removed, the etched surfaces There are some formations in which fracture flow capacity cannot be created with acid, either because the formation etches smoothly or because large quantities of insoluble fines plug the channels. In these formations, a SUPRA technique or a conventional fracturing solution carrying a propping agent should be considered. The acid etching tests can be used to determine the feasibility of fracture acid stimulation and the best type acid to use. Figure 8.3 shows a decision tree to help determine what type of treatment to perform. Figure 8.3 - Acid Treatment Decision Flowchart © 2005, Halliburton 8 • 18 Stimulation I Fracture Acidizing Plan Calculations For a successful acid treatment, the acid solution must be compatible with the produced fluids. Emulsion tests should always be run with the produced fluids and the treating solution. These tests are run by mixing equal volumes of the treating solution and the produced oil with high shear. The time and amount of separation are noted. Complete separation of the mixture within ten to fifteen minutes is desirable. The tests are run with both live and spent acid because the fines released from some formations tend to stabilize emulsions. The acid used in the emulsion tests should contain all of the additives that are going to be used in the job since many of these additives affect the emulsion tests. The information obtained in the tests described, along with certain well and formation data are used in computerized design programs. The calculations in Halliburton’s Acid Design Program have been incorporated into FracPro PT, a 3-dimensional fracture simulator which can determine the conductive fracture length and the productivity increases that are possible. If cores are not available, a treatment design can be run using information determined previously on cores from the same formation and same area. Acid can cause some of the asphaltene components of the crude to fall out of solution. These solids are commonly called “acid sludge.” A sludge test should be run to see if anti-sludge agents are needed in the acid. Acid Systems In recent years, Halliburton has made an effort to simplify it’s terminology in describing the wide variety of acid systems and additives. The Carbonate 20/20 program helps fill a void in the oil industry created by the lack of personnel that can effectively design acid treatments. Several standard acid blends resulted from the Carbonate 20/20 initiative. Tubing Movement Program The Tubing Movement Program (TMP) helps predict the amount of tubing movement that can occur because of the high pump rates and fluid volumes. This tubing movement is primarily caused by changes in the tubing through the cooling effects from the pumped fluids, from the pressures exerted by fluids in the tubing and annulus, and from the friction effect of these pumped fluids. One of the main advantages of the program is that it uses bottom hole treating pressure as a starting value along with a specific pump rate. A computer print-out includes: Carbonate Completion Acid Carbonate Completion Acid (CCA) minimizes compatibility problems, especially for reservoirs containing asphaltene crudes. CCA uses HAIGE corrosion inhibitor which is compatible with non-ionic and anionic surfactants. Although the CCA system is primarily used for acidizing carbonate reservoirs that contain asphaltene crude, it can also be used on “sour” wells (wells containing hydrogen sulfide) if sulfide scavenger is added and on sweet wells if ferric iron control is used. Because the inhibitor and antisludging agent are compatible, they can prevent sludging without compromising corrosion protection. For effective corrosion inhibition, the upper temperature limit of the CCA system is approximately 200°F in 15% HCL. Depending on acid concentration, contact time, and metal type, this temperature limit can be higher or lower. • surface injection pressure • total tubing movement, which includes • piston effect • ballooning effect • frictional effect • buckling effect • thermal effect • the amount of force required to be exerted in order to overcome these five effects © 2005, Halliburton 8 • 19 Stimulation I Chemical Stimulation Carbonate Stimulation Acid Zonal Coverage Acid The Carbonate Stimulation Acid (CSA) system is used in carbonate formations for stimulating production. Operators can use CSA to stimulate carbonate formations by fracture acidizing or matrix acidizing. Regardless of the approach, the acid should be viscous to promote effective stimulation. The Zonal Coverage Acid (ZCA) System is a crosslinked acidizing fluid system that can be used in carbonates for fracture acidizing and for diversion during matrix acidizing. The use of crosslinked acidizing fluids in the past was limited. The high fluid viscosity required during pumping increased frictional pressures, which required greater pumping horsepower. In addition, obtaining a live-acid crosslinked fluid was an expensive process. In many cases, fully crosslinked acids were not necessary to retard the reaction of HCL on carbonates; viscosifying the acid provided ample retardation. In such treatments, however, much of the acid was lost as a result of leakoff through wormholes (Figure 8.4). Gelling agents made from synthetic polymers are the most useful viscosifiers for acidizing carbonate formations. These materials resist acid hydrolysis (breaking) over a wide range of temperatures. Currently, Halliburton offers four gelling agents made from synthetic polymers: SGA-HT, SGA-II, SGA-III and SGA-IV. The most effective gelling agent for acidizing carbonate formations depends on the agent's working temperature range, ease of mixing, compatibility with other additives, and control of reactivity. Based on these characteristics, SGA-HT is usually the best gelling agent to use for acidizing carbonate formations. However, this viscosifier is also significantly more expensive than SGA-II, III and IV. SGA-II and SGA-III can be used at lower temperatures and SGA-IV is the only gelling agent compatible with sulfide scavengers. Table 8.2 presents various properties of these three gelling agents. Product Viscosity 170 S-1 150°F 2% Conc. Temp Limit (°F) Charge Ability to crosslink SGA-HT 27 cp 400-425 + No SGA-II 19 cp 200-225 - Yes SGA-III 39 cp 300-325 + Yes* SGA-IV 33 cp 200-225 + Yes** Table 8.2 – Acid Gelling Agents *SGA-III must be premixed in HCL for 2 to 4 hours to develop adequate crosslink sites. **SGA IV is the only acid gelling agent compatible with SCA-130 sulfide scavenger. © 2005, Halliburton Figure 8.4 – Leakoff due to wormhole growth during acid fracturing Zonal Coverage Acid (ZCA) system is an insitu crosslinked gelled acid system. When this system is used, fluid loss can be controlled as the acid leaks off through wormholes and spends. Once the acid is nearly spent, the system crosslinks, blocking wormholes and preventing further loss of acid from the fracture face. The system will not break until the acid is completely spent. SGA-II, III or IV can be used as a gelling agent in the ZCA system. SGA-III must be premixed in acid for 2 to 4 hours to develop adequate crosslink sites for use in the ZCA system. 8 • 20 Stimulation I Chemical Stimulation Therefore, if planning to run ZCA system fluids on-the-fly, use SGA-II or IV gelling agents. Handbook can be used when you design an FRA treatment. Carbonate Emulsion Acid Hot Rock Acid Carbonate Emulsion Acid (CEA) is an emulsified acid system used in carbonate reservoir stimulation jobs that require retarded acid reaction rates. The upper temperature limit of the system is approximately 400°F. In fracture acidizing applications, formations that produce heavy crude oils with high quantities of asphaltenes tend to respond best to CEA. The Hot Rock Acid (HRA) system is a totally organic acid system with a dissolving power equal to 15% HCL. HRA is an acid system specifically for high temperature wells. It consists of both acetic and formic acids set at different ratios to eliminate secondary precipitation problems and maintain maximum dissolving power. The Hot Rock Acid system increases stimulation effectiveness and reduces corrosion rates. Specifically, it allows extended reaction times, provides built-in iron control, and enhances the performance of acid gelling agents. Because of the reduced interfacial tension the service provides, emulsion and sludging problems are less likely. Because of its excellent acid retardation properties, the system has also been successfully used in higher-temperature matrix acidizing applications. Under high-temperature conditions, the CEA system allows live acid to penetrate deeper into the formation matrix than other acid formulations. As a result, wormholing is improved. By volume, 70% of the CEA system consists of 22% hydrochloric acid as the internal phase and 30% of No. 2 diesel as the external phase of the emulsion. The CEA system is formed through the use of AF-61 emulsifier along with a corrosion inhibitor. Fines Recovery Acid Additional Reference Fines Recovery Acid (FRA) is an energized acid system for stimulating carbonate formations with bottomhole static temperatures (BHST) up to 150°F. The energized phase of FRA is For more detailed information and mixing procedures, consult the Carbonate 20/20 technical bulletins on HalWorld. 70% nitrogen. The acid is usually 20% HCL with a gelling agent and inhibitor. In addition to demonstrating low liquid concentrations and good fluid loss, the FRA system can also be used in low-pressure, liquid-sensitive wells that normally produce fines during acidizing, or wells that have fluid and fines recovery problems. Preflushes In fracture acidizing, good productivity can be obtained if adequate fracture geometry can be created that has enough conductivity. The fracture geometry is determined by the fluid properties such as fluid loss, fluid viscosity and the injection rate. However, the conductivity of the fracture is a function of the amount and pattern of rock removed from the fracture faces, not from acid leaking off into the formation. Under matrix acidizing conditions, the FRA system can be used to divert in long horizontal open hole sections. STIMWIN, STIM2001, FOAMUP, FracproPT and the Halliburton Nitrogen © 2005, Halliburton Although the base acid cost for the Hot Rock Acid system is about twice that of HCL, the reduction in corrosion inhibitor loading and the reduced gelling agent requirement generally result in lower overall treatment costs. In addition to the two acids, the system includes MSA-II inhibitor, SGA-HT gelling agent and an appropriate surfactant. Iron-control additives can be used but are not necessarily required. 8 • 21 Stimulation I Chemical Stimulation The distance that a conductive fracture can be created is dependent upon the reaction rate of the acid as well as the fluid properties. One method of obtaining slower reaction rates is to use water preflushes to cool the fracture faces. Preflushes also produce wider fractures for the acid, which improves the rock surface area to acid volume ratio. This gives better penetration distance of live acid. Acid fluid loss is also decreased by the use of water preflushes. natural fractures, and fluid-loss control is reestablished. SUPRA CE (Conductivity Enhancement) When using the SUPRA CE technique, service operators pump a viscous pad fluid ahead of the acid and behind an optional nonviscous, cool down prepad. As the viscous pad is pumped, it generates fracture geometry. Because the acid that follows it is less viscous, it “fingers” through the viscous pad. This fingering process limits the acid contact to the formation face, which creates etched and nonetched areas. This process results in longer acid penetration distance and possibly more effective conductivity at a greater distance along the induced fracture. A viscous preflush can be used like a nonviscous preflush. The increased viscosity has the added advantage of creating a wider and possibly higher fracture. Acid Placement Techniques The SUPRA (sustained-production acidizing) techniques are another result of the Carbonate 20/20 initiative. They detail the different methods that can be used under various well conditions to generate the optimum conductive geometry in the reservoir being treated. SUPRA FLC (Fluid-Loss Control) SUPRA FLC controls acid fluid-loss in induced and natural fractures. In rock matrix or natural fracture systems, acid leakoff must be controlled so that live acid will remain within the fracture and generate effective etched fracture length. Under some conditions, Carbonate 20/20 treating fluids provide fluid-loss control. Under excessive fluid-loss conditions, some additional fluid-loss material may be required in addition to alternating phases of acid and nonacid fluids. The acid provides conductivity, and the nonacid fluid (containing fluid-loss additive) establishes or re-establishes fluid-loss control. Figure 8.5 - SUPRA CE Technique SUPRA EHC (Etched Height Control) The nonacid phase also acts as an acid extender, allowing a sufficient volume of acid to penetrate the required distance while reducing the volume of acid necessary for that distance. Phases can be alternated at any time, depending on the treating conditions. The acid leaks off and forms wormholes or goes into natural fracture systems. The nonacid phase (containing fluid-loss additives) sands off and seals up wormholes or © 2005, Halliburton 8 • 22 The SUPRA EHC technique uses fluid density differences to control fluid placement in certain sections of an induced vertical fracture. This technique can place acid in areas of a fracture that do not contain water or possibly a gas cap. Figure 8.6 shows the fracture-acidizing process including SUPRA EHC. Advantages of the SUPRA EHC system are that it prevents the acid treatment from entering unwanted zones such as Stimulation I Chemical Stimulation water-producing intervals and gas caps, and that it uses less acid. Closed-Fracture Acidizing (CFA) With the aid of nitrogen, many heavier fluids can be lightened by foaming (gas content greater than 55%) or commingling (gas content less than 55%) gas in the fluid. Even with the best engineering and design, this treatment may not always work. The closed-fracture acidizing (CFA) technique reopens previously created fracture systems with a prepad fluid pumped at high rates. The fractures are then allowed to close naturally, or part of the prepad is flowed back to force the fractures to close. Next, acid and any necessary additives and diverters are pumped below fracturing pressure. This technique can also be used immediately after a fracture acidizing treatment performed for enhanced etched conductivity. For more information on these acid placement techniques, consult the Carbonate 20/20 best practices page on HalWorld. Figure 8.6 - Fracture-Acidizing Process Including SUPRA EHC © 2005, Halliburton 8 • 23 Stimulation I Chemical Stimulation Unit E Quiz Fill in the blanks with one or more words to check your progress in Unit E. 1. Matrix acidizing enhances well productivity by reducing the ____________________ factor. 2. Matrix acidizing requires that rates and pressures be controlled so that ____________________ does not occur. 3. Decreased well pressure drawdown can help prevent formation ____________________ in weak formations, reduce water or gas ____________________, minimize both organic and mineral ____________________. 4. The most widely used treatment for limestone and dolomite is _____________________ ____________________. 5. One method of obtaining slower reaction rates is to use water _____________________ to ____________________ the fracture faces. 6. _____ True ______ False Fracture conductivity is generated by acid leaking off into the formation. 7. Which Carbonate 20/20 acid system is used when asphaltenes are a problem? _____ a) Carbonate Stimulation Acid _____ b) Carbonate Completion Acid _____c) Zonal Coverage Acid _____d) Carbonate Emulsion Acid 8. Which acid system uses a crosslinked gel to control leakoff? _____a) Carbonate Stimulation Acid _____b) Carbonate Completion Acid _____c) Zonal Coverage Acid _____d) Carbonate Emulsion Acid 9. What does SUPRA stand for? ____________________-____________________ ____________________ Now, look up the suggested answers in the Answer Key. © 2005, Halliburton 8 • 24 Stimulation I Chemical Stimulation Unit F: Sandstone Acidizing reaction products and also has a significant effect upon the reaction rate. Basically, two types of acids are used in sandstone acidizing: hydrochloric acid alone and hydrofluoric-hydrochloric acid mixtures. Normally, these treatments are used to stimulate near the wellbore (maximum 5-6 feet out). Damage Removal These treatments are done at rates that will not fracture the formation. They can be very effective in removing damage near the wellbore. Hydrochloric Acid Even though hydrochloric acid will not dissolve sand or clays, it is still useful in acidizing sandstone formations. It will dissolve any carbonates that might be present in the formation and will also partially dehydrate water-swollen clays. In sandstone stimulation, hydrochloric acid is usually combined with Morflo III to produce MCA (Mud Cleanout Acid). The hydrochloric acid in MCA shrinks swollen clay particles. Morflo III disperses clays and acts as a surfactant to aid in emulsion prevention and faster cleanup. The hydrochloric-hydrofluoric acid mixture (HF Acid) has application in mud-or clay-damaged sandstone formations. There are two fundamental types of clay damage in sandstone. One type is mud damage where bentonite drilling mud particles have coated the formation face or have invaded the formation. This type of damage is considered to be very shallow, possibly only an inch or so deep. The second type results from naturally occurring clays that have either migrated toward the wellbore and are plugging flow channels or have become hydrated and swollen due to contact by fresh water. This type of damage is deeper into the formation than mud damage. Reaction Rates The Speed with which hydrofluoric acid reacts upon sandstone is affected by Hydrofluoric Acid • physical and chemical composition of the formation In contrast to hydrochloric acid, hydrofluoric acid does have the ability to dissolve silica (sand) or silicates such as clays, silt, shale and feldspars. Since bentonite is a silicate, it can also be dissolved by hydrofluoric acid. Sandstone formations having permeability damage due to clay migration or benetonite drilling mud can usually be helped by a hydrofluoric acid treatment. • temperature • surface area of rock exposed to a particular volume of acid • concentration of excess hydrochloric acid Sandstone formations are basically composed of quartz, with some limestone, dolomite, feldspars, and several clay minerals. Hydrofluoric-hydrochloric acid mixtures react with these materials at varying rates. Therefore, the reaction rates of the HF Acid mixtures will vary considerably with the composition of the formation. The physical distribution of the acid Hydrofluoric acid is usually pumped as a hydrochloric-hydrofluoric acid mixture (HF Acid) with the hydrofluoric acid being obtained from the reaction of hydrochloric acid on ammonium bifluoride. Hydrochloric acid increases the solubility of some of the secondary © 2005, Halliburton 8 • 25 Stimulation I Chemical Stimulation soluble material throughout the formation also influences reaction rate. Sandstone-2000 TM Another factor greatly influencing the rate of reaction is bottom-hole temperature. The higher the temperature, the more rapid is the reaction. For example, laboratory data taken from tests reacting 25 ml of acid on 4.0 gm of sand reveal that 33.6 lb of 20-40 mesh Ottawa sand would be dissolved by 1,000 gallons of a 3% HF-12% HCL acid mixture in eight hours at 75°F. However, at 200°F, 1,000 gallons of the same acid mixture would dissolve 43.1 lb of the same sand in only one hour. Sandstone acidizing technology has improved significantly in recent years as a result of field analysis, fundamental research and applied research. Traditional sandstone acidizing treatments were performed by pumping a standard blend of 3% HF and 12% HCL acids. These treatments often had minimal success and sometimes actually damaged the well further. Older theories regarding reactions occurring between the acid and the formation proved to be inaccurate in 1984 when samples from a Gulf Coast well were obtained after sandstone acidization. Based on this research, the Sandstone 2000TM acidizing processes were developed. Like the Carbonate 20/20 initiative, Sandstone 2000TM created a set of “best practices” to help improve Halliburton’s sandstone acidizing success rate. The surface area of material exposed to the acid also influences the rate of the reaction. This is probably the primary reason that hydrofluoric acid dissolves clay minerals more rapidly than it does quartz. As shown above, 1,000 gallons of 3% HCL will dissolve 33.6 lb of 20-40 mesh sand in eight hours at 75°F. However, under the same test conditions, 1,000 gallons of the same acid will dissolve 50.7 lb of silica flour in only 30 minutes. Formation Conditioning Further data show that 72.6 lb of silica flour containing 5% bentonite will be dissolved by 1,000 gallons of 3% HF-12% HCL in 30 minutes at 75°F. These examples illustrate the influence of the exposed surface area on the rate of the reaction. Under reservoir conditions the surface area-to-volume ratio will be much greater than that of any of these examples. As a result, the reaction in the formation will be more rapid. Treatment of a well before sandstone acidizing can greatly increase the success rate of this type of treatment. Formation conditioning design depends on the presence of key minerals. Proper use of a formation conditioner or a combination of conditioners before treatment with HF acids is critical to the success of the treatment. Clays Therefore, the influence of exposed surface area of rock on the reaction rate cannot be overemphasized. Clays were previously thought to be of minor consequence. However, recent work has shown that the impact of clays can be dramatic for brines undergoing deep matrix invasion in sandstones. Table 8.3 shows some mineralogies that could cause problems. The importance of the concentration of excess hydrochloric acid can be illustrated with the following examples. Using calculations from laboratory tests conducted by reacting 25 ml of acid on 4.0 gm of sand for 30 minutes at 75°F, 1,000 gallons of 3% HF-0% HCL will dissolve 27.1 lb of silica flour containing 5% clay. The same volume of 3% HF-12% HCL and 3% HF20% HCL will dissolve 72.6 lb and 90.8 lb respectively. © 2005, Halliburton 8 • 26 Stimulation I Chemical Stimulation Mineral Feldspars Carbonate Illite Kaolinite Smectite Mixed-Layer Clay Chlorite Mica Zeolite The CLA-STA additives described in Section 6 can also be used to enhance clay stabilization. Problem Contains sodium and potassium. Fluosilicate precipitation and K-Spars can create major problems. Consumes HCL and can cause precipitation of fluosilicates and aluminum from spent HF. Can cause fines migration problems, is ion exchanging, and contains potassium which can cause fluosilicate precipitation from spent HF. Can cause fines migration problems and disperses in fresh water and causes plugging. Is ion exchanging and swells in fresh water. Is ion exchanging, swells in fresh water, and frequently contains potassium which can cause fluosilicate precipitation from spent HF. Is ion exchanging and is unstable in HCL. Is ion exchanging, is unstable in HCL, and contains potassium which can cause fluosilicate precipitation from spent HF. Is ion exchanging, is unstable in HCL, and occasionally contains sodium which can cause fluosilicate precipitation from spent HF HCL Sensitivity Many formations are “HCL-sensitive;” formation minerals decompose when contacted by HCL. During this process, metal ions such as iron, aluminum, calcium, and magnesium are dissolved from the mineral, leaving an insoluble silica gel mass that can be extremely damaging. HCL-sensitive minerals include zeolites and chlorite. However, research has shown than all clays have a temperature above which they are unstable. When conditions make formation minerals highly unstable, only organic acidbased systems should be used. CLAY-SAFE Despite the sensitivity of clays to HCL, they are stable in acetic acid and fairly stable in formic acid. Unfortunately, both of these acids are similar to fresh water in the presence of watersensitive clays. Substituting acetic acid (MSA) for CLAYFIX is not a good alternative, since MSA does not exchange ions with the clays or prevent clay swelling. MSA is not an equivalent substitute for HCL because it does not dissolve iron scales and is slow to dissolve carbonates. However, use of CLAY-SAFE conditioners should provide sufficient ion ex-change to help: Table 8.3 – Problem Formation Mineralogy CLAYFIX When ion exchange occurs, the cations naturally present on the surfaces of the clays are replaced or exchanged with ions from the invading brine. For example, 7% potassium chloride brine (KCl), after exchanging ions with the formation, becomes approximately 5% sodium chloride (salt). Because of this exchange it is important that the transformed brine should also be compatible with the formation. • prevent precipitates in the HF/HCL process, • control clay swelling, and • stabilize the clay to sandstone acidization. Their recommended uses are given in Table 8.4, but the Sandstone Stimulation Process section on HalWorld should be consulted for proper use of these fluids. The most effective brine for sandstone acidizing is ammonium chloride (NH4CL), also called CLAYFIX. CLAYFIX 5 (5% NH4CL) provides sufficient ion exchange and maintains enough salt concentration to prevent clay swelling before and after ion exchange. © 2005, Halliburton 8 • 27 Stimulation I Chemical Stimulation Fluid System Mud Cleanout Mud-Flush N-Ver-Sperse Wellbore Conditioning Paragon or other organic solvents HCL for pickling When to Use Whole water-based mud losses Whole oil-based mud losses Asphaltene/paraffin problems, heavy oils, pipe dope Removing iron scales and preventing them from entering the formation Oil Well Conditioning Gidley's CO2 Conditioner Emulsion problems, terminal upsets, improves acid penetration into oil zone Matrix Conditioning CLAYFIX 5 High ion-exchanging clays 5-15% HCL Carbonate removal, ion exchange, removal of polymer damage CLAY-SAFE 5 *See note below. Carbonate removal, ion exchange for HCL-sensitive mineralogy CLAY-SAFE H HCL-sensitive mineralogy, but it requires removal of polymer damage (K-Max, HEC, etc.) or high carbonate levels. CLAY-SAFE F *See note below. HCL-sensitive mineralogy, but it requires increased carbonate dissolving power without increased volume. See note below. *Note: MSA II Inhibitor and 5% NH4Cl are not compatible when the MSA II Inhibitor concentration is above 1%. Below 1% MSA II Inhibitor, dispersing agents may be required. Table 8.4 – Formation Conditioning System Carbonates Sandstone formations containing greater than 5% carbonates are prone to matrix precipitation of complex aluminum fluorides as spent HF flows across the carbonates. The solution to this problem requires • deep removal of the carbonate with large preflushes of HCL or • the use of an additive that prevents precipitation. © 2005, Halliburton For example, 50 gal/ft (gallons per foot of formation height) of 15% HCL preflush in a sandstone containing only 5% calcite will remove the calcite in a radius of about 2 ft from the wellbore. If spent HF follows, aluminum fluoride precipitation will begin 2 ft from the wellbore. Gidley’s CO2 Conditioner Carbon dioxide preflushes have successfully prevented fluid compatibility and emulsion problems after sandstone acidizing treatments and have improved the HF treatment response. One operating company’s study revealed that oil-wet particulates (silica and fines) stabilized emulsions. These particles were precipitated from HF acid reacting with the formation in the presence of hydrocarbons, such as crude oil and xylene. The solution is in Gidley’s CO2 Conditioner, a Halliburton-exclusive process that removes the hydrocarbons from the nearwellbore area. The carbon dioxide treatment uses 100 to 200 gal/ft of CO2 under miscible (easily mixed) conditions to displace the oil away from the matrix in the near-wellbore area. Displacing the hydrocarbons allows better HF invasion of the matrix and prevents emulsions from forming. The CO2 can also be used throughout the acid stages to provide enhanced energy for cleanup. Some oils form asphaltene precipitation easily and other oils have minimal miscibility with CO2 under reservoir conditions. Both of these conditions can be at least partially eliminated with a xylene preflush ahead of the Gidley’s CO2 Conditioner. Secondary Precipitation When hydrofluoric acid reacts with either silicates (clay minerals) or silica (quartz), one of the reaction products is fluosilicic acid. This acid will react with sodium or potassium to form sodium fluosilicate or potassium fluosilicate. The sodium and potassium fluosilicates have very low solubility, and precipitation can occur. This can happen if the hydrofluoric acid contains 8 • 28 Stimulation I Chemical Stimulation • Contains ALCHEK to prevent secondary precipitation of aluminum. This is particularly important when the mineralogy is unknown or the formation contains high carbonate streaks or more than 5% carbonates. sodium or potassium, or if the spent or partially spent acid becomes mixed with solutions containing these chemicals. This means that salt water should not be used as mixing water for the acid or for displacing the acid. The acid should not be weighted with sodium chloride or calcium chloride. When calcium chloride is added to hydrofluoric acid, calcium fluoride will precipitate immediately. Diverting aids such as rock salt should not be used because of secondary precipitates. If additional weight is necessary, it is possible to use ammonium chloride as the weighting agent. • Aids in iron control, in most cases eliminating the need for other iron control additives such as Fe-2 (citric acid) and Fe1A (acetic acid). • Contains a penetrating agent to help acid contact damage. The overall advantage of Sandstone Completion Acid is that it provides the customer with maximum dissolving power while maintaining compatibility which is particularly important when the mineralogy is unknown. The 1.5% HF is the maximum HF concentration recommended in most sandstone matrix acidizing treatments. Acid Systems Silica Scale Acid Silica Scale Acid is the old regular HF or mud acid (12% HCL-3% HF). It is effective at removing damage, but its high HF concentrations almost invariably result in secondary precipitation very near the wellbore resulting in failures or limited, short-term successes. Therefore, this system is recommended for use only when the mineralogy shows there are essentially no clays and 100% quartz, or in geothermal wells. Fines Control Acid RHF (Retarded HF Acid) is an acid system that has proven successful. The patented system has been modified slightly and renamed Fines Control Acid. Sandstone Completion Acid Sandstone Completion Acid consists of 13.5% HCL-1.5% HF, Pen-88 as penetrating agent, and 5% ALCHEK to prevent precipitation of aluminum in the formation and in the wellbore (alumino-silicate scaling). This fluid is compatible with a majority of formations and was particularly designed for the cases where the formation mineralogy is unknown or uncertain. The primary advantages of sandstone completion acid are: • Contains high HCL-HF ratio to provide compatibility with most formation mineralogies. Exceptions include formations high in feldspars, particularly at temperatures below 200°F and formations containing "HCL-sensitive" minerals. © 2005, Halliburton Conventional matrix acidizing with hydrofluoric acid is only effective for removing shallow clay damage 1 or 2 in. from the wellbore. Fines Control Acid is a retarded hydrofluoric acid system designed for treating sandstone formations that have been damaged from the migration and/or swelling of silica, feldspars, and clays up to 2 to 6 in. from the wellbore. Formations with significant Kaolinite and /or illite are particularly sensitive to this type of damage. The fluoride content of Fines Control Acid is equivalent to the fluoride content of 1.5% HF, but its effective dissolving power is equivalent to 1.1% HF. However, because of its retarded nature in its reactions with sand, it is as effective in removing clay damage as 1.5% HF. Fines Control Acid can also be effective in formations that appear to be HCL-sensitive. In these cases CLAY-SAFE 5 Conditioner can be used followed by Fines Control Acid. Formation minerals do not show acid sensitivity when 8 • 29 Stimulation I Chemical Stimulation treated in this manner, as discussed in an earlier section on HCL-sensitivity. overall content is greater then 10%. Since the fluosilicates are less soluble at lower temperatures, K-spar Acid should also be used in most formations containing any significant sodium feldspars below 175°F. In formations containing high concentrations of potassium feldspars below 200°F, lower HF concentrations are suggested. If fluosilicate precipitation cannot be avoided, an HCL overflush should be used to help re-dissolve the precipitate. The primary advantages of fines control acid are: • Deeper penetration of live HF into the formation. • Retarded reaction with sand and silica to promote deep damage removal and improve compatibility with feldspar-containing formations. Cla-Sta FS is included to control fines migration associated with illite or mixed-layer clays. These clays are almost always present when potassium feldspar is a dominant mineral and are very susceptible to fines migration during a stimulation treatment. K-Spar Acid will prevent this migration. If fines migration is the source of damage, Fine Control Acid is recommended. The HF fluid treatment design could consist of 50 gal/ft of K-spar Acid followed by 200 gal/ft of Fines Control Acid. • Minimized damage to formation consolidation - it reacts less with the sand that holds the formation together. • Fe-1A for iron control and preventing aluminum scaling. • Penetrating agent to help acid contact damage. • Clay stabilizer to control fines migration during and following the treatment. The primary advantages of K-Spar acid are: • Temperature limitation only because of corrosion inhibitor and formation mineral stability, as in non-retarded HF systems. • Is compatible with formations containing significant feldspar and/or illite minerals Higher volumes of Fines Control Acid should be used where deep, severe damage has occurred. A lower volume of overflush can be used when the well is predicted to clean up rapidly. When difficulty in cleaning up the well is anticipated, the large volume of overflush should be used to push the HF-containing fluids far from the wellbore. Since Fines Control Acid does not require a shut-in time to function, the well should be returned to production as soon as possible. • Contains penetrating agent to help acid contact damage. • Contains clay stabilizer to control fines migration during and following the treatment. Volcanic Acid Volcanic Acid is a new organic-HF acidizing blend developed to replace acetic-HF and formic-HF fluids. This system is unique to Halliburton. Recent research (including laboratory reactions, core flow tests, and flowback sample analyses from organic-HF treatments) has shown that the acetic-HF and formic-HF systems have severe secondary precipitation of HF reaction products. The systems are effective in removing skin damage and increasing production in wells in which HCL-based fluids could not be used. However, secondary reactions further from the wellbore K-Spar Acid K-Spar Acid is a 9% HCL-1% HF blend which was designed for treating formations containing significant sodium or potassium feldspar or illite. As the sodium and potassium are dissolved from these minerals, the potential for fluosilicate precipitation increases. Potassium fluosilicate is less soluble and presents a bigger problem. K-spar Acid should be used in almost all cases where the formation contains K-spar and/or illite as the dominant mineral, or the © 2005, Halliburton • Contains Fe-1A for iron control and preventing aluminum scaling. 8 • 30 Stimulation I Chemical Stimulation precipitate the HF reaction products giving a less than optimum overall treatment. Volcanic Acid solves these problems while maintaining all the advantages of organic-HF fluids. The primary advantages of Volcanic Acid are: • Is compatible with HCL-sensitive minerals • Can be used at higher temperatures than HCL-based fluids, without decomposing clays or zeolites or having high corrosion rates. and asphaltenes or scale removal treatments may also be required. 3. Pump 100 to 200 gal/ft of Gidley's CO2 Conditioner (optional). Applicable for oil wells with emulsion problems, terminal upset problems, or to enhance contact of acid into the oil zones. 4. Pump 50 to 150 gal/ft of non-acid CLAYFIX 5 Conditioner (optional). CLAYFIX 5 Conditioner is recommended in formations with a high ion-exchange capacity. It also should be used when completion brines or kill fluids have not been recovered from the well and need to be displaced from the nearwellbore area to avoid contact with acid fluids. If the crude oil or formation brine shows incompatibility with the acid fluids, the non-acid preflush may also be necessary. • Typically will not cause sludging with formation crude oils, even with those prone to acid sludging. • Avoids secondary precipitation observed with formic-HF and acetic-HF. • Contains NH4Cl to prevent swelling of water-sensitive clays. 5. Pump 50 to 150 gal/ft of appropriate acid conditioner. Acid fluids are required prior to the HF-containing damage removal fluid systems in order to ion exchange and remove carbonates. HCL, CLAY-SAFE 5, or CLAY-SAFE H should be used. The choice of these fluids depends upon damage mechanism, mineralogy, and temperature. • Contains a penetrating agent to help acid contact damage. • Can be used anywhere formic-HF or aceticHF fluids were previously used. The name Volcanic Acid came from the fact that formations with high zeolite content and high clay content are often associated with areas of volcanic activity. The name also has the connotation of high temperature. The Volcanic Acid fluid systems are specifically suited for these types of formations. 6. Pump 75 to 200 gal/ft of appropriate damage removal fluid system. When using Fines Control Acid, pumping a small nonretarded HF stage is often beneficial in removing very near-wellbore damage. 7. Overflush with 25 to 200 gal/ft of 5-15% HCL or CLAYFIX 5. Overflush is required to push the treatment fluids deeper into the formation. The larger volumes are required with brines incompatible with spent acid or for disposal wells where the fluids are not recovered. General Treatment Guidelines Designing sandstone acidizing treatment may seem very complicated due to the numerous considerations that must be dealt with, but following the 8 general steps listed below and the decision tree in Figure 8.7, the goal of improving well performance can keep things in perspective. 8. Displace with clean fluid such as nitrogen or CLAYFIX 5. Volumes should be sufficient to fully displace any acid fluid away from the wellbore and the gravel pack. Never use KCL, or formation brine to displace since these fluids will be incompatible with spent acid. 1. Perform mud cleanout treatment if whole drilling mud was lost. Additional fluid should be circulated until returned fluid is clean. 2. Perform wellbore cleanout treatment. This should include pickling the tubing with HCL at the least. Solvent treatments for paraffins © 2005, Halliburton 8 • 31 Stimulation I HF Acid Flow Diagram W ellbore A rea D amaged? Don’t use HF Yes No Is dama ge H F a cid soluble? Don’t use HF No Yes Damag e remov ed, will production be e conomica l? D on’t use H F Yes No Pump at re asonable ma trix inje ction rate? Don’t use HF Yes No Carbo nate Conce ntra tion > 20%? Don’t use HF Yes No C an treatment be control le d to tre at all in terval of Interes t? U se HF Yes No Nec ess ary to tre at t he whole i nt erval t o ma ke well ec onomical? D on’ t use H F U se HF Yes No Figure 8.7 – HF acidizing decision tree © 2005, Halliburton 8 • 32 Stimulation I Unit F Quiz Fill in the blanks or mark the correct answer to check your progress in Unit F. 1. Hydrochloric acid used in sandstone acidizing is basically used to (check all that apply): _____ a) partially dehydrate water-swollen clay _____ b) dissolve clays _____ c) dissolve carbonates that are present _____d) create a fracture 2. Hydrofluoric acid will dissolve _____a) silica _____b) clays _____c) silt _____d) shales _____e) all of the above 3. The speed of hydrofluoric acid’s reaction on sandstone is affected by: _______________________________________________________ _______________________________________________________ _______________________________________________________ _______________________________________________________ 4. Halliburton’s name for ammonium chloride is ____________________. 5. Gidley’s CO2 process displaces ____________________ away from the wellbore to allow better HF ____________________ of the matrix and prevent ____________________ from forming. 6. Which Sandstone acid system would you choose for removal of deep damage (up to 2 to 6 in. from the wellbore) caused by clay migration or swelling? _____a) Sandstone Completion Acid _____b) Fines Removal Acid _____c) Silica Scale Acid _____d) Volcanic Acid Now, look up the suggested answers in the Answer Key at the end of this section. © 2005, Halliburton 8 • 33 Stimulation I Chemical Stimulation Unit G: Damage Removal – Mud considered before a mud removal operation is started. Since many mud systems are used for well completion, it is almost impossible to describe all of them, their properties, and how they might affect production. Therefore, this unit is limited to: Limestone Formations (1.) water base muds which contain clay minerals If damage from mud or mud filtrates exists in a limestone formation, the exact nature of the damage should be determined. If the producing formation has not experienced excessive lost circulation problems during the drilling operation, then the problem is probably one of the following: (2.) oil base muds. Oil muds are either straight oils or oil external emulsions. It is desirable to remove muds from wells for a number of reasons. • very shallow clay particle invasion Mud Removal • possible filtrate invasion resulting in water blocks Water base mud, if properly combined, will build a filtercake on the wall of the wellbore as the well is drilled. The consistency of this filtercake will vary from a tight, dense material to a soft, mushy cake that allows excessive fluid to penetrate into the formation. The mud’s fluid loss properties must be constantly monitored to do its job. • possible changes in the formation (particularly if naturally occurring water sensitive clays are present) Acid–Surfactant Mud Removal Solutions (MCA-III) As the well is drilled, the wiping action of the bit, pipe, and tool joints on the on the sides of the wellbore can remove the filtercake. This allows more filtrate and even clay particles to invade the formation. Also, excessive speed in running the pipe can cause fracturing and loss of whole mud to the formation. Many factors can contribute to lost circulation problems, including natural fractures and the vugular porosity of some formations. If the formation is limestone, any acid solution that penetrates the mud or filtercake should result in increased production. To penetrate a mud filtercake, a surfactant is often added to hydrochloric acid. The surfactant Morflo III also acts to cure other problems associated with mud damage. In addition to aiding penetration of the filtercake, Morflo III can • aid in thinning whole mud Damage results when filtrate, clay, and whole mud invade a formation. This damage can seriously restrict the well’s production capacity or injectivity if it is an injection or disposal well. The degree of damage can be determined through pressure buildup tests. If damage does exist, steps can be taken to remove the damaged condition. Potential damage and the composition of the formation should be © 2005, Halliburton • lower surface and interfacial tension to prevent or remove water blocks • aid emulsion breaking or prevention of emulsions • assists in dispersing the clay minerals and other insoluble fines after acid has done the job of shrinking the clay 8 • 34 Stimulation I Chemical Stimulation One potential problem with whole mud removal is that even when acid is used to shrink clay particles in the mud system, it does not necessarily mean the mud will be thinned. In fact, the opposite can occur because the acid may flocculate or cause the clay particles in the mud to clump together. Sandstone Formations Removal of water base muds from a sandstone reservoir should follow much the same pattern as that of a limestone formation with some slight changes. Where the calcium carbonate content of the formation is low, hydrofluoric acid can be used. To minimize this flocculation and mud thickening, Morflo III is added to the acid, and the acid strength is maintained at the lowest possible level. Usually 5 to 10% acid is used for this work. Less than ½ % of the acid in the solution is required for dehydrating the clay. The rest can be used for dissolving lime in the mud and limestone from the formation. If the acid concentration used is 15% or higher, even the special surfactant may not be capable of thinning the mud effectively. Therefore, low concentrations of acid solutions are recommended. Hydrofluoric-Hydrochloric Acid Mixtures (HF Acid) One precaution that should be pointed out is that the fluoride ion (F-) will react with calcium ions (Ca++) to form a damaging precipitate. Serious damage could result if it forms in excessive amounts in the intergranular porosity of a sandstone formation. Limestone content of sandstone formation is generally low enough so that this problem will not occur. If limestone content is too high where you can’t put enough HCL ahead to get rid of it, then HF should not be used. If the well has had a weighted clear completion fluid (such as 40% calcium chloride) used in it, damage could result. A spearhead of dilute hydrochloric acid is almost always recommended ahead of HF. Non-Acid Mud Removal Solutions (Mud-Flush) Mud-Flush lowers the viscosity of water-based mud systems and helps keep the solids in a dispersed state. Mud-Flush has several applications comparable to MCA-III, but it cannot remove hard, dehydrated, filtercake from a formation. Although Mud-Flush is not considered a replacement for MCA-III, it is a more economical alternative for use in lostcirculation situations. For example, if 100 bbl of water-based mud was lost to a producing formation, the volume of MCA-III required to contact and chemically react with the mud would be expensively large. If whole mud or a mud filtercake is present on the formation face or in perforation, it can be removed by MCA-III. An appropriate surfactant can also be added to HF-HCL mixtures for the mud removal. The comments on concentrated acid are still true. Even with HF solutions, flocculation can result, and whole mud thickening may be observed. Filtercake and mud invasion, as well as clay within the formation, may be removed by HF Acid. Mud-Flush is a mixture of a mud thinner (MF-1) and MORFLO® III. The action of these two chemicals dissolved in water is sufficient to perform the following functions: The Mud-Flush solution previously mentioned can be used for whole mud removal in sandstone formations in the same manner as discussed for limestone formations. • Aid removal of water-based drilling muds from all types of formations Oil Base Muds • Help prevent and break emulsions and water blocks Two basic oil mud systems require attention: the Oil External Emulsion Muds and the True Oil Base Muds. Mud-Flush should not be used for removing oilbased mud. © 2005, Halliburton 8 • 35 Stimulation I Chemical Stimulation N-Ver-Sperse O consists of Oil External Emulsions (Invert Emulsions) • hydrocarbon solvents, such as diesel oil, kerosene, or xylene Emulsions used for drilling are usually fairly low solid, oil external, oil wet clay stabilized emulsions. They can be broken, with undesirable results, if too much of a high surface area solid such as clay is added to the system. They can also be broken with appropriate emulsion breakers in some instances. • 5% MUSOL® or MUSOL A solvent • and HYFLO® IVM surfactant If the muds contain asphaltic materials, use xylene for the hydrocarbon solvent. Use N-Ver-Sperse A fluid, containing wetting agents and dispersants, when hydrocarbon-based fluids must be avoided because of economics, environmental concerns or lower hydrostatic pressures. The aqueous system also can be used as either a mud cleanout fluid or a formation breakdown fluid. When used as a mud cleanout fluid, gelling agents can be added to give the fluid sufficient viscosity to carry the mud solids from the wellbore. It can also be weighted to 11 lb/gal using zinc chloride. Materials, such as calcium chloride and sodium bromide, are not satisfactory weighting salts. Sodium bromide can be used for weighting, however, if methanol is included in the formulation. Test weighted solutions at specific well conditions before use. True Oil Base Muds True oil base muds are usually prepared by gelling a viscous, high asphaltene oil and adding to it blown asphalt, fine calcium carbonate, and other materials which can have fluid loss properties. One of the most effective thinning and removal solutions consists of glacial acetic acid or acetic anhydride mixed with an aromatic solvent containing Hyflo IV. These will also water wet the pipe and formation. Some oil base type muds tend to spontaneously form a very viscous emulsion with certain cements. This emphasizes the need for a wash ahead of the cement. N-Ver-Sperse A consists of • water containing 2% KCl by weight • 10% MUSOL N-VER-Sperse (NOTE: MUSOL A is not recommended because of separation problems noted at higher temperatures) N-Ver-Sperse A and N-Ver-Sperse O have been developed to help clean up a well where oil based muds have been used. • 1% MORFLO III by volume Use N-Ver-Sperse O fluid when the presence of a hydrocarbon fluid would be advantageous. Use it either as a cleanout fluid to remove mud from the wellbore and formation or as a formation breakdown fluid. When used as a mud cleanout fluid, circulate N-Ver-Sperse O at a fairly high rate to prevent the solids in the mud from settling out. © 2005, Halliburton 8 • 36 • 50 lb SPACER SPERSE per 1,000 gal of fluid. Additional References Acidizing Methods and Materials (Mud Removal) - HalWorld Stimulation I Chemical Stimulation Unit G Quiz: Damage Removal-Mud Fill in the blanks or mark the correct answer to check your progress in Unit G. 1. Damage can result when ____________________, ____________________ and ____________________ ____________________ invade a formation. 2. Two solutions that can be used to remove mud damage in a limestone formation are ____________________ and _____________________ ____________________. 3. ______ True ______ False Mud damage in a sandstone formation can be removed with HF Acid if the limestone content is high. 4. The two types of oil base muds are ________________ ____________________ ________________ and ________________ ________________ ________________ muds. 5. ____________________ and ____________________ are two solutions for removing oil base muds. Now, look up the suggested answers in the Answer Key. © 2005, Halliburton 8 • 37 Stimulation I Chemical Stimulation Unit H: Paraffins and Asphaltenes the deposition problem varies between reservoirs in the same area and between wells in the same reservoir. The severity is difficult to estimate until it cannot be controlled by normal production techniques. Many operators have learned to live with their situation and have “grown-up” with their removal techniques. Therefore, they tend to treat the problem as an unavoidable part of life. Other than the physical properties and condition of the producing formations, one of the most aggravating problems for the petroleum producer is the build-up of organic deposits in areas like the well bore and feed lines. These deposits act as chokes during build-up in the well bore. They gradually decrease production and, in time, could completely stop the flow of oil. This may cause rod failure, split tubing, and worn pump parts unless some remedial action is taken. Two common actions are • an orderly program for the removal of the deposits • the use of some type of inhibitor. Cloud Point and Pour Point Cloud point and pour point tests are used to get general measurements of the ability of the crude oil to hold paraffin in solution. These are experimental measurements that give us some idea where or when paraffin might cause problems. The petroleum industry spends millions of dollars annually correcting these deposition problems. Organic deposits are formed when the chemical equilibrium of the oil is upset. This causes certain chemicals normally in solution to precipitate. The physical and chemical characteristics of many crude oils are such that the oils can deposit waxy material called paraffins or, in some instances, asphaltenes. The cloud point is defined as the temperature where paraffin begins to come out of solution. This point is visible in clear crude oils as a slight cloudiness. Obviously the cloud point of a dark crude oil has no meaning since the cloudiness is not visible. Other instrumental methods are sometimes used to obtain the cloud point of crude oils. Paraffins If the liquid or crude oil is slowly cooled below the cloud point without agitation, small wax crystals gradually form an interlocking network that will support the liquid. A temperature is finally reached where the oil will not flow when tilted to a horizontal position in a bottle. This is referred to as the pour point. This point has more meaning when dealing with crude oils. Generally, the higher the cloud point or pour point of an oil, the less stable the paraffin is in the oil. The family of hydrocarbons classified as paraffins is generally inert. They are resistant to dissolving in acids, bases, and oxidizing agents. This makes it difficult to remove these deposits chemically. Depending on the conditions where paraffin deposits were formed, they have different physical forms. These forms include soft mush to hard, brittle deposits. Also, paraffin deposits will often include other materials such as scale, sand particles, or asphaltenes. Paraffin problems are encountered in almost every oil producing area. Some areas are more severely affected than others. The severity of © 2005, Halliburton 8 • 38 Stimulation I Chemical Stimulation Factors Affecting Paraffin Deposition expand and cool. The largest amount of cooling is usually at the formation face. Paraffin deposition is primarily due to a reduction in the amount of paraffin that can be dissolved in a crude oil. This loss of solubility can be caused by many different factors. Some of the more important factors are discussed below. Loss of Volatile Constituents from the Crude Generally, the light parts of a crude oil are the ones that dissolve the most paraffin. Loss of these lighter constituents reduces the quantity of paraffin that the oil can hold in solution at a specific temperature. Temperature In most solutions, as you lower the temperature the material dissolved in the fluid begins to drop out of solution. This is also true of paraffins. As oil is produced, its temperature can drop for a variety of reasons. Cooling can be produced: • by gas expanding through an orifice or restriction (choke) As a producing field becomes older, the lighter constituents are constantly being removed from the oil, even within the formation. Therefore, the oil becomes more saturated with paraffin before it ever leaves the formation. For this reason, many paraffin deposition problems become more severe as the well becomes older. • as a result of the gas expanding, forcing the oil through the formation to the well and lifting it to the surface • by loss of heat from the oil and gas to the surrounding formations as it flows from the bottom of the well to the surface Suspended Particles in the Crude • by dissolved gas being liberated from solution • by water production As was stated previously, paraffin begins to separate from crude oil when the temperature of the oil cools and the paraffin is no longer stable in solution. There is some evidence that formation fines such as sand and silt often speed this separation process. These small particles suspended in the crude act as a nucleus for the small wax particles to form into larger particles. These separate more readily from the oil. Paraffin problems are greatly increased when these fines are present, especially since fines tend to increase the bulk of the deposit. • by the evaporation or vaporization of the lighter constituents • in oil flow lines due to loss of heat to air (especially in winter) Pressure Pressure helps keep gas and lighter constituents dissolved in the crude oil. If the wellhead pressure were the same as formation pressure, paraffin would probably not cause many problems. Conditions Favoring Paraffin Deposition However, oil will not flow unless there is some type of pressure drop. The largest percentage of this pressure drop occurs near the bottom of the well. As the pressure decreases, oil and gas © 2005, Halliburton Evaporation of the volatile constituents in crude oil also tends to reduce the temperature of the oil. This is due to the heat required to change the liquid to a vapor. This effect is not as important as the loss in solubility mentioned above. Even though wax may separate from the crude oil, the paraffin will not necessarily deposit on 8 • 39 Stimulation I Chemical Stimulation the tubular goods and other objects. The wax will probably remain suspended in the crude oil itself. This ideal situation often exists. In some wells producing very waxy crude, little or no paraffin problems are experienced. On the other hand, some crude oil areas with “low” paraffin content have some severe problems. Listed below are some conditions that are favorable for paraffin deposition: • The alternate coating of the pipe and draining of the oil. As the pipe fills, then drains, the film left on the pipe surface is too thin and its movement too slow to carry the wax particles away. • The presence of only a film of oil in contact with the pipe while the well is flowing. One obvious method of minimizing this problem would be to heat the stimulation fluids on the surface. Another method might be to run a paraffin solvent ahead of the job. Methods Used to Remove Deposits • When the oil contacts with an unusually cold surface such as the production of oil through water zones. This will cause paraffin crystals to grow directly on the pipe wall. It is estimated that the heat loss from a pipe in contact with water is approximately eight times greater than when in contact with air or dry earth. Methods generally used to remove accumulations of paraffin can be classified as follows: • Those that remove the paraffin by use of mechanical equipment. • Those that remove the paraffin by use of solvents which dissolve the deposits. • Rough pipe surfaces. • Electrical charges on various materials in the crude oil. These conditions favoring paraffin deposition combined with a sufficient cooling of crude oil can cause serious problems. • Those that use heat, which melts the wax and reduces it to a liquid so that it can easily be removed with produced oil. Mechanical methods such as scrapers, knives, hooks, and other tools for the removal of paraffin deposits offer fairly satisfactory results when the wax accumulation is in the well bore. Tools such as these are common in the oil field and will not be discussed here. Paraffin Precipitation during Fracture Stimulation Studies have been conducted on the effect of injecting cold fluids into a warm, producing reservoir. It was found that the crude oil can deposit paraffin in the formation when the reservoir is cooled by large volumes of cold fluids such as those used in fracturing treatments. This is particularly true when the surface fluid temperature is cooler than the formation temperature. If the fluid in the formation is cooled to a temperature below the cloud point, paraffin precipitates may deposit in the formation pores. Once this occurs, the fluid © 2005, Halliburton flow channels become partially blocked or plugged, and the flow of oil is restricted. Even after the original formation temperature is restored, it may be difficult to redissolve the precipitated paraffin in the same fluid. This is because the melting point of solid paraffins is much higher than the cloud point. However, formations having temperatures higher than the melting point of the precipitated paraffin would not be affected. Hot Oil One of the most common techniques of removing paraffin deposits is to dissolve or melt waxy accumulation with hot oil. This removal method is very simple. Lease crude is run through heat exchangers and pumped into the well at temperatures in excess of 300°F. This will usually melt the accumulated paraffin in the oil string. The paraffin is then produced back with the oil. Many small businesses own and 8 • 40 Stimulation I Chemical Stimulation operate specially designed hot-oil trucks. Many wells are hot oiled at regular intervals ranging from every two to four weeks or more. Parasperse Additives There is some evidence that hot oiling may be detrimental to crude oil production. Paraffin damage is caused when temperatures higher than the formation temperature is used to melt the paraffin wax. As the hot oil is circulated, some of the liquid containing a high concentration of paraffin may leak off into the producing zone where it cools to the formation temperature. This allows paraffin to reprecipitate within the formation. When this type of damage is suspected, it often requires several soakings with a good paraffin solvent to clean the wax out of the formation matrix. Many crude paraffin deposits contain inorganic solids such as corrosion products, scale, and formation fines. These solids can comprise as much as 60% of the paraffin deposit. If the paraffin is melted by the hot oil, the solids could be forced into the formation matrix and create another source of damage. Steam Steam has been used successfully in a number of fields having severe paraffin problems. The application of steam heat to the formation is a practical method of heating the sand and removing paraffin from the formation face. One disadvantage of this method could be the possibility of plugging the producing zone with paraffin in much the same manner as with hot oil jobs. Aqueous Paraffin Removal Systems Parasperse has proven very successful in both laboratory and field tests as a water-dispersible paraffin removal agent. One of the most successful applications of Parasperse® cleaner is periodic cleaning of the formation face. Other applications include wellbore cleanout, flowline cleaning, paraffin inhibitor placement, and as a preflush in fracturing. This material can be used as an alternative to hot-oiling downhole. Parasperse® is ordinarily used at a concentration of 2-10% in a water carrier. This water may be produced formation brine or clean surface water. Successful treatments have been noted when cold water was used. Preferably, the system should be warmed to about 100-120°F to aid the cleaning action of the Parasperse® solution. In laboratory tests, the Parasperse® solution removed more crude paraffin than is dissolved in conventional paraffin solvents. Parasperse® treatments are also less expensive than conventional paraffin solvents. Since water comprises 90-98% of the removal system, the chemical expense is very reasonable. In many instances, Parasperse® treatments have significantly increased the production of a well. Paraspserse T was designed for the removal of both paraffins and asphaltenes. It has the same applications as Parasperse. Parasperse LR was primarily designed for use in hydrocarbon-based fluids. However, it can also be added to aqueous fluids and has the same general applications as the other Parasperse additives. Solvents Certain water-based chemicals have been successfully used to remove downhole paraffin deposits. These chemicals, when added to water, have the ability to remove accumulated organic deposits and disperse them for easy removal. The use of solvents to remove paraffin deposits is becoming more common in the oil field. Many laboratory studies have been conducted on a variety of solvents in an attempt to determine the best solvents for paraffin and how the solubility varies with different waxes. In general, the solubility of different waxes in a given solvent at a definite temperature decreases © 2005, Halliburton 8 • 41 Stimulation I Chemical Stimulation as the molecular weight and melting point increase. loss, produce the oil out of the well bore rapidly, and minimize agitation of oil in the wellbore. The usual practice has been to dissolve paraffin accumulations using light, hydrocarbon solvents such as kerosene, naphtha, gasoline, diesel fuel, etc. These solvents are very effective for dissolving purified paraffins such as canning waxes. However, crude waxes are usually deposited with a considerable quantity of asphaltenes present. Because asphaltenes are insoluble in most solvents, they tend to hinder the dissolving of the waxes present in the deposit. This makes the solvent less effective in dissolving the total deposit. Electrical Heaters The use of bottom hole heaters is a less satisfactory means of controlling paraffin deposition. Heaters are designed to heat the oil as it comes out of the formation in order to keep the paraffin “in solution.” The use of this technique is severely limited by economics, high maintenance costs, and the absence of electricity in isolated fields. Plastic Coatings PARAGON Solvents Tests show that aromatic solvents such as xylene and toluene dissolve both the wax and the asphaltenes. These two solvents are excellent for treating crude paraffin deposits. Halliburton’s Paragon is an effective blend of aromatic solvents. Paragon 1 and Paragon 100E+ effectively dissolve paraffin without using benzene, ethyl benzene, toluene, or xylene (BETX). The use of one or more of these four materials may be restricted in certain areas due to government regulation. Paragon EA™ is a cost-effective solvent for the removal of excess pipe dope, paraffin deposits, and crude oil residues. In most cases, Paragon EA will be applied as a neat solvent. Unlike Xylene and Paragon 100E+, Paragon EA does not contain any aromatic components and is environmentally acceptable. Plastic pipe used as feedlines and plastic coated pipe used in the well has received much attention in the last few years as a means of combating paraffin deposition. Extruded plastic pipes and plastic coatings have proven effective in some areas. The idea behind the use of plastic coatings on downhole equipment is that paraffin will not adhere to the smooth surface provided by the plastic. In some cases this is true; however, most plastic coatings will not withstand the rough treatment given to downhole equipment. Therefore, the coating becomes scratched and worn and provides an excellent base for paraffin deposition. In some instances, certain types of plastic coatings actually promote the deposition of paraffin. This method of combating paraffin deposition is also very expensive, especially if the existing iron has to be junked and new plastic coated equipment placed in the well. Surfactants Methods for Decreasing the Severity of Deposition Many of the chemicals used to combat paraffin problems are just ordinary surfactants or dispersants. The surfactants work by waterwetting the tubular goods. This water film helps keep paraffin from sticking to the pipe wall. Dispersants work by reacting with paraffin and causing the particles to repel each other. Altering Production Techniques Altering production techniques is one way to avoid paraffin problems. There are many methods that can be used to cut down on heat © 2005, Halliburton 8 • 42 Stimulation I Chemical Stimulation These approaches have been partially successful. However, there is no information on when they will work. It is mostly a trial-and-error method. The squeeze treatment is done by diluting 1 drum of paraffin inhibitor per each 50 bbl. of produced crude per day in 500 gallons of diesel, kerosene, xylene, Paragon, or lease crude. Thus, for a 50 BOPD (barrels of oil per day) well 1 drum of inhibitor diluted to 500 gallons would be required; for a 100 BOPD well 2 drums of inhibitor diluted to 1000 gallons would be required, etc. Once the inhibitor is spotted downhole, it is then overdisplaced with 5-10 bbl. of lease crude per foot of formation. Inhibitor treatments as outlined above should theoretically give about 200 days protection against paraffin deposition. Crystal Modifiers Generally, crystal modifiers have many of the same drawbacks of surfactants. They appear to be somewhat unpredictable in their effectiveness. However, with the proper placement technique, they seem to work fairly well and offer the most hope for the chemical inhibition of paraffin deposition. When viewed under a microscope, they appear to modify the wax crystals precipitating from a solution. The normal crystal growth of paraffin is deformed sufficiently to inhibit further growth. The crude oil becomes filled with paraffin crystals that are much smaller than normal and have fewer tendencies to adhere to pipe surfaces. While not completely curing the paraffin problem, crystal modifiers help reduce the severity of the problem. Parachek® 160 paraffin inhibitor continuous injection into the crude stream may be accomplished by metering the inhibitor downhole with a small surface chemical pump, by injection into the power oil on wells equipped with a subsurface hydraulic system, or by using a bypass feeder arrangement. One advantage to the continuous injection of the paraffin inhibitor is that conscientious operating personnel can carefully control the concentration of the chemical. In all continuous injection applications, the inhibitor must enter the crude stream well ahead of the point of paraffin deposition. This is imperative for a successful treatment. Parachek® 160 Inhibitor Parachek® 160 inhibitor is an effective blend of chemicals that may be classed as crystal modifiers. Parachek® 160 has been found to be effective in relieving paraffin problems encountered in most crude oil producing areas. However, it should be noted that Parachek® 160 does not prevent the paraffin crystals from coming out of solution in the crude oil. Once the crude oil becomes saturated with dissolved paraffin, paraffin crystals begin to form in solution. Parachek® 160 is not a paraffin solvent and should not be used in place of Paragon or Parasperse. That is, it is not to be used as a paraffin removal solution, but rather as prevention against paraffin deposition. It is possible that Parachek® 160 could be placed during other remedial treatments on a well, such as a propped fracturing treatment. Paracheck® 160 is not ordinarily dispersible in aqueous solutions; however, it could be injected into an aqueous fracturing fluid providing the pump rate is sufficient to keep it dispersed. Parachek® 160 can also be added by mixing with Parasperse. Parachek 160 has not been tested to determine if it has a detrimental effect on the gel properties of My-T-Oil IV and My-T-Oil V, so compatibility testing would need to be conducted before attempting to use it with these fracturing fluids. There are three different applications that may be used to introduce Parachek® 160 into the crude oil stream. These are: • squeezing into the formation • continuous application • introduction into other stimulation fluids. © 2005, Halliburton In all applications a concentration of 0.5 to 0.75 gallons of inhibitor per 100 bbl. of produced crude oil should be maintained. 8 • 43 Stimulation I Chemical Stimulation tends to aggregate (form) the asphaltene particles. The breaking of this bonding allows better solvent penetration and increases the dissolution rate of the asphaltenes. Asphaltenes Asphaltenes are generally considered to be suspended particles in the oil. Unlike paraffins, they are not soluble in the light constituents of oil. Asphaltene deposition can be caused by some of the same conditions as paraffin. However, it is believed that asphaltene deposits are caused by the inability of a crude oil to keep the particles dispersed. Targon® II is used from 1 - 10% by volume of the carrier. It will not work in solvents such as kerosene, diesel, gasoline, condensate, etc. Tarchek Asphaltene precipitation is less widespread in the United States than is paraffin precipitation. It appears that certain fields in Mississippi and California are the most susceptible to this type of deposition. However, any well producing asphaltic base crude may experience this problem. Asphaltene deposition is also a problem in many areas outside the United States. Where asphaltene precipitation is a problem, the deposition usually occurs at the bottom of the well bore and adjacent to the producing formation. In some instances the asphaltenes may precipitate within the formation itself and cause damage. Targon® II Solvent Targon® II is an organic solvent used to remove asphaltene deposits. This solvent was designed for use with an aromatic solvent carrier (Paragon). Targon® II was designed to use as an additive in aromatic solvents to enhance their asphaltene dissolution properties by breaking down the strong intermolecular bonding that © 2005, Halliburton Tarchek is an asphaltene inhibitor for use in wells with asphaltene precipitation problems. It can be run in combination with such paraffin inhibitors as Parachek®160 to treat crude oils that have both paraffin and asphaltene problems. Laboratory testing has shown that Tarchek does not affect paraffin inhibition. Remember that, like Parachek®160, Tarchek inhibitor is not a solvent and should not be used in place of Paragon solvent. The primary function of Tarchek inhibitor is not to remove asphaltene deposits, but to prevent asphaltene from depositing. Before applying Tarchek, clean out any existing asphaltene deposit either mechanically or by using a solvent soak consisting of Paragon and the appropriate amounts of Hyflo®IV M surfactant and Targon®II solvent. Tarchek asphaltene inhibitor stabilizes the asphaltenes by preventing their flocculation (clumping) and/or deposition; thereby, protecting the entire production system from asphaltene plugging. 8 • 44 Stimulation I Chemical Stimulation Unit H Quiz Fill in the blanks with one or more words or circle the correct answer to check your progress in Unit H. 1. ______ True ______ False Most organic deposits in a well contain both paraffin and asphaltene. 2. ______ True ______ False Paraffin problems are rare in the oilfield. 3. The cloud point is the ____________________ when paraffins begin to come out of ____________________. 4. The pour point is the ____________________ when oil can no longer ____________________. 5. Factors affecting paraffin deposition are: __________________________________________________________________ __________________________________________________________________ __________________________________________________________________ __________________________________________________________________ __________________________________________________________________ 6. ______ True ______ False It is impossible to cause paraffin deposition during a stimulation job. 7. Paraffin removal is accomplished by: __________________________________________________________________ __________________________________________________________________ __________________________________________________________________ 8. Parachek® 160 inhibitor is an effective blend of chemicals that may be classed as ____________________ ____________________. 9. ____________________ can be used to help dissolve asphaltenes when added to Paragon and ____________________ can be used to prevent asphaltene precipitation. Now, look up the suggested answers in the Answer Key at the end of this section. © 2005, Halliburton 8 • 45 Stimulation I Chemical Stimulation Unit I: Scale Removal and Prevention The deposition of scaling material from brines produced with oil has been a serious problem for many years. Compounds such as calcium sulfate, calcium carbonate and barium sulfate have been found in many wells. These deposits may exist in injection wells, producing wells and waste disposal wells. Scale Effects The effects that scales caused by brine production have on a well depend largely on the type of scale in the system. Scales may restrict and completely choke off production in the tubing, flow lines, or tubing perforations either at the formation face or in the perforations. Scales have been suspected of depositing in fractures or in the formation some distance from the well bore. Chemical Formula Scale Type Mineral Name Water Soluble Deposits Sodium Chloride NaCl Halite (salt) Acid Soluble Deposits Calcium Carbonate CaCO3 Calcite Iron Carbonate FeCO3 Soderite Iron Sulfide FeS Trolite Iron Oxide Fe3O4 Magnetite Fe2O3 Hematite Mg(OH)2 Brucite Magnesium Hydroxide Acid Insoluble Deposits Scale not only restricts production, but also causes inefficiency and production equipment failure. Since many older fields have entered into enhanced recovery stages, scaling problems can have an even greater impact on waterflood operations. One of the most important factors in dealing with scaling problems is to have an accurate identification of the material being deposited. There are essentially two methods used in the laboratory for the identification of scales. One involves the use of an instrumental method (xray diffraction). The other uses chemical methods. Calcium Sulfate CaSO4 2H2O Gypsum Calcium Sulfate CaSO4 Anhydrite Barium Sulfate BaSO4 Barite Strontium Sulfate SrSO4 Celestite Barium Strontium Sulfate BaSr(SO4)2 Table 8.5 - Oilwell Scale Deposits Types of Scale Scales can roughly be divided into three classes: • water soluble • acid soluble • acid insoluble These are based on the ability of water or hydrochloric acid to dissolve the scale. This is a simplified division (see Table 8.5) because many times pure calcium sulfate or pure calcium carbonate is not deposited. The scale deposit is © 2005, Halliburton 8 • 46 Stimulation I Chemical Stimulation usually a mixture of one or more of the major scales plus corrosion products, solidified oil, silicates, paraffin, etc. However, separation into water soluble, acid soluble or acid insoluble is adequate for field analysis. Scale Formation Prior to production, well fluids remain in a static, undisturbed state. Scale deposits occur as a result of disturbing this equilibrium. When production is started, a pressure drop occurs near the well bore. This pressure change allows dissolved gases to come out of solution. Since changes destroy the state of equilibrium, deposits can form. For example, calcium carbonate scale can occur as a result of a pressure drop at the well bore. Calcium carbonate does not exist in the formation brine as calcium and carbonate ions, but as calcium and bicarbonate ions. A change in pressure allows carbon dioxide (CO2) to escape from solution. Calcium carbonate scale can then be formed. Scale deposits may also occur as the result of mixing incompatible waters. Waters from different zones may become mixed in the well bore, or injection water may mix with formation water. In water injection wells, brines from several sources may be combined and cause compatibility problems which could form scale. The incompatibility of mixed brines results when one water contains a high concentration of calcium or barium and the other water contains a high concentration of sulfate or bicarbonate ions in solution. As these waters mix, deposition can occur because the final solution becomes saturated with calcium sulfate, barium sulfate, or calcium carbonate. These deposits may be found on the rods, tubing or flow lines. Scale Form The Physical form of a scale deposit is dependent upon the manner in which it was deposited. Scale does not form spontaneously. Instead, it occurs in stages. Scale molecules form clusters over a period of time. As these clusters grow, they become too heavy to remain suspended in solution. They precipitate or become deposits. The final crystal form of the scale may resemble popcorn and be either soft and fluffy or very hard and dense. The hard, dense scales occur as the result of slow growth. The soft, fluffy scales are often deposited rapidly. Most inorganic scales appear in one of three forms: • thin scales or popcorn like • laminated deposits • crystalline deposits Corrosion and microbial reaction products can result in deposition of various iron scales such as iron oxides and iron sulfide. Sulfate reducing bacteria are a source of hydrogen sulfide which can precipitate iron that is in solution, or the hydrogen sulfide can react with steel. Iron in solution can also be precipitated if oxygen is introduced into a system. Iron oxide (rust) can form on metal surfaces when oxygen is present. © 2005, Halliburton Figure 8.8 - Heavy Scale Deposits 8 • 47 The thin type scales are normally the most permeable and easily removed. The laminated or crystalline scale forms are less permeable and harder to remove. Factors such as pressure drops, temperature, and the mixing of water can result in severe scale problems. However, the formation of scale is usually a situation with several possible causes. As changes in the equilibrium occur, interaction Stimulation I Chemical Stimulation of these changes with other conditions downhole can result in deposits. The final form that a particular scale deposit takes can significantly affect efforts to remove the scale. Figure 8.9 - Flowchart for field identification of scale Acid Soluble Scale Removal Regular Inhibited Acid Acid soluble scales are: Regular inhibited acid solution is normally 15 % hydrochloric acid that contains corrosion inhibitor. It is the basic acid for preparing penetrating and non-emulsifying acid. It is not normally used for scale removal. • Calcium Carbonate • Iron Carbonate • Iron Sulfide • Iron Oxides Penetrating Acid • Iron Hydroxide. Penetrating acid solution is regular inhibited acid that has 1 ½ gallons of Pen-5 or Pen-88 per 1000 gallons. Pen-5 and Pen-88 are surfactants One or more of the following solutions can remove these acid soluble scales. © 2005, Halliburton 8 • 48 Stimulation I Chemical Stimulation that lower the surface tension of the acid solution to approximately 25 dynes/cm. Lowering the surface tension increases the acid’s ability to contact the scale. during the course of the acidizing treatment, iron salts and oxides that were put into solution as iron chlorides may form insoluble iron hydroxides. These iron compounds can deposit near the well bore and cause even lower injectivity than before the treatment. A penetrating acid solution can be successfully used on scales containing only a small amount of iron if it does not form an emulsion with the formation fluids. When treating surface pipelines, gathering lines, or other systems where the solution will not enter the formation, penetrating acid can be used for all acid soluble scale. Under cold conditions, increasing the concentration of the hydrochloric acid will increase the reaction rate. With most iron scales, it is usually best to use at least 20 percent hydrochloric acid. The pH control is based on the action of a weak acid that reacts much more slowly on the limestone scale and other acid soluble materials than the hydrochloric acid reacts. While the pH remains low (less than 3), the iron will not precipitate. Multiple Service Acid (MSA) MSA contains a 10 percent concentration of acetic acid. MSA’s greatest attribute in scale removal treatment is that it will not damage chrome-plated parts or alloy steels found in downhole pumping. Calcium carbonate scales are readily dissolved by MSA. Non-Emulsifying Acid (NE) Non-emulsifying acid solution is regular inhibited acid that has one or more of the nonemulsifying chemicals added. Non-emulsifying acid can also have Pen-5 or Pen-88 added to the solution to help obtain the desired wetting properties. Paragon Acid Dispersion (PAD) The non-emulsifying chemicals are added to help prevent the formation of emulsions between the treating solution and the formation fluids. Non-emulsifying acid, like penetrating acid, is used when the scale is primarily calcium carbonate and the iron concentration is low. Fe Acid Fe acid contains hydrochloric acid along with a blend of sequestering agents and a pH control agent. During scale removal, the sequestering agent contained in Fe Acid prevents the precipitation of the iron by forming a complex with the iron and keeping it in solution. Fe Acid is most suited for the removal of iron compounds from disposal and injection wells. Paragon Acid Dispersion (PAD) is a mixture that contains Paragon (an aromatic solvent), acid, and a surfactant. The acid phase may be prepared from a number of acid solutions and selection of the acid phase depends on the conditions involved. In scale removal applications, the aromatic Paragon portion of the dispersion is effective in removing paraffin, congealed oil and other organic deposits. This allows the acid to contact the scale and react more completely. PAD has been injected as the first stage for degreasing and removing acid soluble material prior to a Gypsol or Liquid Scale Disintegrator job for the removal of acid insoluble gypsum. These deposits normally occur near the well bore and gradually block the permeability. Hydrochloric acid will dissolve iron scales and cause a temporary increase in injectivity. However, as the acid spends on the formation © 2005, Halliburton 8 • 49 Stimulation I Chemical Stimulation Gal 15% HCL/ cu ft of Scale lb Scale/ gal of 15% HCL CaCO3 (Calcium Carbonate) 95 1.84 Fe2O3 (Iron Oxide) 318 0.98 FeS (Iron Sulfide) 180 1.62 FeCO3 (Siderite) 111 2.13 Fe3O4 423 0.74 Type of Scale Before placing the Gypsol, the wellbore should be degreased with kerosene containing Hyflo IV or with DopeBuster M. After pumping off the kerosene, the acid reactive scales and corrosion products should be removed with Fe Acid or MSA. PAD made with Fe Acid or MSA can also be used to degrease the well bore to remove the acid reactive materials present. The acidcontaining solution should be completely pumped off before placing the Gypsol. The converted gypsum can then be removed by dumping or pumping inhibited hydrochloric acid or MSA. If the scale is extremely thick, successive treatments may be necessary with Gypsol followed by acid. Table 8.6- Volume of scale dissolved in 15% HCL Acid Insoluble Scale Removal Acid insoluble scales are: Liquid Scale Disintegrator • Calcium Sulfate • Barium Sulfate Liquid Scale Disintegrator or LSD, is an organic solution that is designed specifically for the removal of calcium sulfate scales, gypsum and anhydrite. LSD reacts with gypsum to form a precipitate that won’t adhere to gypsum but forms a water dispersible sludge. The precipitate has a tendency to slough away from the surface of the gypsum and increases the penetration of the solvent. Also, since the precipitate does not adhere tightly and is readily dispersible in water, an acid stage may not be needed to remove the sludge. If it becomes necessary to remove the LSD precipitate with acid, it is soluble at 1.2 pounds per gallon of 15% hydrochloric acid. • Strontium Sulfate • Barium-Strontium Sulfate. Two general types of conversion agents have historically been used for scale removal; Gypsol and hydroxide solutions. Since then, research has developed a number of additional scale removal chemicals that can be used. GYPSOL Gypsol gypsum converter is a water solution containing one-half pound of OG-1 and one-half pound of OG-2 per gallon of solution. A surfactant, Pen-5, is also added at one gallon per 1000 gallons of the solution. Laboratory and field tests have shown that most gypsum deposits can be removed with LSD in 24 to 48 hours. Also, LSD is more effective than Gypsol for removing gypsum scale. A degreasing step with Paragon or a PAD solution with Fe Acid as the acid phase is preferable prior to the scale removal treatment. The degreasing step should be circulated for 12 to 24 hours before being pumped off. The LSD solution is then dumped in the annulus. If the scale deposit is present in fractures some distance from the well bore, a soaking period prior to circulating is recommended. If the scale deposit is considered restricted to the well bore, circulation can be started immediately after dumping. Since the scale deposit may be oil wet, the addition of a With Gypsol, gypsum (CaSO4∗2H20) is converted to acid soluble calcium carbonate. Gypsol is inexpensive and has been successfully used in many wells. However, the converting properties of Gypsol are severely retarded when encountering dense, laminated gypsum scale. Because of this lack of penetration, repeated application may be necessary. Gypsol works only with gypsum deposits. Gypsol is normally placed in contact with the scale for 24 to 48 hours and allowed to convert gypsum to an acid soluble calcium carbonate. © 2005, Halliburton 8 • 50 Stimulation I Chemical Stimulation suitable surfactant would allow better wetting and contact. 7.0 6.0 NOTE: Emulsion tests should be conducted with the LSD and non-emulsifiers added just as they would be with an acid treatment. Wells on gas lift or flowing wells must have the “spot and soak” technique applied. 5.0 4.0 3.0 2.0 LSD can be used at concentrations ranging from 10-50%. Concentrations and volumes used are determined by the amount of scale present downhole. Figure 8.10 gives the theoretical amount of gypsum removed by various concentrations of LSD in pounds per gallon. Note that these are theoretical values and represent the maximum amount of gypsum that can be removed. For instance, LSD-300 and LSD-500 solutions will theoretically remove 4.35 and 7.0 pounds of gypsum per gallon, respectively. However, laboratory tests conducted with field scale samples have shown that LSD-300 and LSD-500 solutions will remove only 2-3 and 3-5 pounds of gypsum per gallon in 24 to 48 hours under static test conditions. 1.0 0 20 30 40 50 CONCENTRATION OF LSD (WT%) Figure 8.10 - Theoretical Amount of Gypsum Removed by Various Concentrations of LSD (per gallon) In cases as serious as the one mentioned, circulating the LSD solution through the interval would be more practical. The volume and concentration of LSD treating solution necessary to circulate would depend upon the length of the interval, tubing volume, and fluid level in the annulus. The treatment time would depend on the particular scale deposit, but 24-48 hours of circulation should be enough. Longer circulating times may be necessary in extremely difficult cases. Dilution with well fluids may slow the disintegration rate. The best method in determining the most effective and economical concentration of LSD for a gypsum removal treatment is to conduct disintegration rate tests with scale from the well. However, this is not always possible under field conditions. Equations are in this unit for determining the cubic feet of scale present on the inside and outside of various pipe sizes. The number of pounds of gypsum present per linear foot may be calculated by multiplying 144 x cubic foot of gypsum present per linear foot. A cubic foot of gypsum weighs approximately 144 pounds. Success or failure of a scale removal treatment often depends upon having sufficient volumes and concentrations of chemicals. For example, if a 2 in. I.D. pipe has scale 0.5 in. thick, it would contain 0.016 cubic feet of gypsum per linear foot of pipe. Gypsum weighs 144 pounds per cubic foot so each linear foot of pipe would contain 2.3 pounds of gypsum. A pipe with a 2 in. I.D. containing 0.5 in. thick scale has a capacity of 0.0449 gallon per linear foot. Calculations show 0.0449 gallon of LSD will theoretically remove 0.314 pounds of gypsum. So, as many as 5-10 treatments may be required to remove the scale if a spot and soak technique is used. © 2005, Halliburton 10 BaSO4lvent BaSO4lvent, pronounced (bay-solvent), is a solution specifically designed to remove barium sulfate and strontium sulfate scales from injection wells, disposal wells, gas wells, or producing wells. BaSO4lvent solution is a one stage solvent; it does not require an additional acid stage for the removal of the scale. The use of BaSO4lvent solution can minimize or eliminate costly and time-consuming pulling 8 • 51 Stimulation I Chemical Stimulation operations and physical descaling of pumps and tubing. Deposits in perforations, SSSV, and gaslift valves can be removed with BaSO4lvent solution. By using BaSO4lvent, operators can more effectively remove NORM (naturally occurring radioactive material) scale without exposure to its hazards and eliminate the costly disposal of these materials. Equations for Determining Volume of Scale Present BaSO4lvent solution can be applied neat or diluted to a 50% concentration consisting of freshwater, seawater, or low-hardness brines. Higher temperatures increase the performance and reaction rate of BaSO4lvent solution. Any means of agitation, such as circulation or periodical pumping of the material back and forth through scaled perforations, will reduce the time required for scale removal. Formation squeezes are effective for removing scale from the near-wellbore area. Soak and shut-in times of 8 to 48 hours are recommended. The actual time required can vary depending on the severity of the deposit. Before the solvent is used in downhole well applications, well fluids should be pumped off or displaced to minimize interference with the dissolving process at the problem contact point. When the deposition of barium sulfate or strontium sulfate has been diagnosed, the most practical solution to the problem is to eliminate the causes. For instance, barium sulfate is most often formed as a result of high-barium content injection water being mixed with water that contains an excess of sulfates. By isolating these waters, the problem could be eliminated. If the cause cannot be eliminated, the next most practical approach is to treat the injection water or produced water with a scale inhibitor such as LP-55 to help prevent the deposition of the scale. Often, if a simple calcium carbonate scale is to be removed, the problem is finding how much 15% hydrocholoric acid is needed. It is possible to use too little acid and fail to effectively stimulate the well. For example, more than 90 cubic feet of calcium carbonate scale have been found in some injection wells. For this quantity of scale, a treatment of at least 8,550 gallons of 15% hydrochloric acid should be used. A smaller amount of acid may not improve injectivity and may even decrease it because of sloughing of the deposit. The following equations give the scale quantities in cubic feet for deposits of various thicknesses on the inside and outside of different pipe sizes. By measuring the thickness of scale, finding the length of the scaled interval over which scale is deposited, and knowing the pipe size, the amount of scale present can be determined. The necessary volume of acid or scale removal solution such as LSD can then be calculated. Equation 1 is for the calculation of scale volume on the outside of tubular goods. (1) V = 0.0218 t (D1 + t) Equation 2 is for the calculation of scale volume on the inside of tubular goods. (2) V = 0.0218 t (D2 – t) Where V = D1 = pipe O.D. in inches D2 = pipe I.D. in inches t Hydra Jet = scale thickness in inches Table 8.6 gives the theoretical quantity of 15% HCL necessary to remove one cubic foot of various types of scale and the pounds of scale removed by one gallon of 15% HCL. A sand laden acid or water wash pumped through a properly designed jetting device will remove all types of scale that are not subject to chemical means of removal. Hydra Jet is especially valuable in open hole injection wells. Special tools are available for use in removing scale from tubing or casing. © 2005, Halliburton volume of scale in cubic feet/linear feet. Example Determine the quantity of 15% HCL necessary to remove an iron sulfide scale having an 8 • 52 Stimulation I Chemical Stimulation producing wells. The chemicals used in the Scalechek® service are three types: solid Scalechek SCP-2 and HT and liquid Scalechek® LP-55. average thickness of 3/8 inch from the outside of 1000 feet of pipe having 3-inch O.D. Solution First, use equation 1 to calculate the quantity of scale per linear foot. V = 0.0218 t (D1 + t) V = 0.0218 × 3/8 in. (3in. + 3/8 in.) SCP-2 is designed to minimize the formation of scale in producing wells. The chemical nature of the material allows formation water to pass over the polyphosphate with only a small quantity being dissolved. This low concentration stabilizes the scale-forming tendency and minimizes scale deposits. SCP-2 is suitable for use in wells having bottom hole temperatures up to 200°F. Change 3/8 in. to a decimal and solve for V: V = 0.0218 × 0.375 × (3 + 0.375) V = 0.0275906 cubic foot per linear foot Now multiply this volume of scale times the length of pipe to be cleaned to determine the total volume of scale to be removed. This would be: ft 3 ft 3 = 27.5906 ft of iron sulfide scale Scale Volume = 1000 ft × 0.0275906 The quantity of 15% HCL necessary to remove iron sulfide is given in Table 8.3. Multiply the total volume of scale times the quantity of acid necessary to remove one cubic foot of scale and the total acid requirement is determined Acid Volume = 180 gallons 15% HCL × 27.5906 ft 3 3 ft Scalechek® treatments with SCP-2 can be performed with fracturing treatments by mixing the material with the first 75 % of the propping agent. Scale forming water flows over or filters through the granular bed at formation temperature and pressure and releases a low concentration of polyphosphates. Most scales such as calcium carbonate, calcium sulfate, and barium sulfate can successfully be controlled. Oil or water base solutions should be used to carry the SCP-2. Acids tend to cause the rapid decomposition of all polyphosphates and should not be used as a placement medium. This does not mean that acid cannot be used as a breakdown fluid, providing that an oil or water spacer is used prior to placing the SCP-2. Wells which have had polyphosphates placed in them should not be treated with acid. = 4966.308 gallons Scalecheck® HT Scale Inhibition Scalechek® HT is a solid scale inhibitor designed to be placed in a fracturing treatment. It is placed along with the proppant as a method of inhibiting the formation of scale. Incompatibility between scale inhibitors and fracturing fluids has long been an inherent problem in stimulation treatments. This incompatibility results in long or no crosslink times due to the binding of the phosphate, phosphonate, or acrylic acid molecule with crosslinkers such as CL-11, 18, 23, 24, and 29. Scalechek® HT has been coated to prevent interference with crosslinked fracturing fluids. This encapsulation controls the flash release of inhibitor which affects crosslink time. The high Scale removal treatments may be expensive, and the deposition of scale might result in decreased production. Therefore, it is often more economical to prevent scale deposition before it occurs. A number of materials and techniques are available to help prevent scale deposition. Scalechek® Scale Prevention Service Scalechek® service is a process for preventing the deposition of scale in injection, disposal and © 2005, Halliburton 8 • 53 Stimulation I Chemical Stimulation concentrations (flash release) of inhibitor observed in produced water following squeeze treatments are not likely to occur with Scalechek® HT. This leaves a higher percentage of Scalechek® HT in the formation to control scale compared to squeezed inhibitors. these kinds of uses, the final concentration of LP-55 in the treated water should be 5-20 ppm (parts per million). Calchek Service Scalechek® HT is effective in controlling calcite (calcium carbonate (CaCO3)), gypsum (calcium sulfate (CaSO4 · 2H2O)), and barite (barium sulfate (BaSO4)) scales. Scalechek® HT is effective in preventing Naturally Occurring Radioactive Material (NORM) scale that is often associated with barium sulfate scale formation. Scalechek® HT is effective for temperatures of 100°F and above; it has been evaluated up to 275°F. Carbonate or sulfate scaling, after acidizing limestone formations, has been observed in areas where the formation water contains large amounts of bicarbonates or sulfates. It has been found that 0.1% LP-55 in the acid will help prevent this secondary scaling. LP-55 is a liquid scale inhibitor containing no polyphosphates. It is used to help prevent the deposition of calcium carbonate, calcium sulfate, and barium sulfate scales in producing and injection wells. It is a water soluble organic compound that acts as a crystal poison by altering the structure of the particles and preventing growth after a crystal nucleus has formed. LP-55 is recommended only as a scale preventer, not a scale removal compound. Consequently, it should be used after some effective descaling treatment has been applied. Adding LP-55 at a concentration of 0.1% will: • aid in preventing secondary scaling • aid in well cleanup • provide scale protection for short periods of time If long-term scale protection is desired, the LP55 concentration should be increased to 0.5 to 0.1% of the treating volume. The shut-in time for the treating slug should be increased to allow complete spending of the acid. The most popular method of placing LP-55 in a well is with the Chemical Placement Technique (CPT). The CPT nomograph (Figure 8.2) is used to determine the volume of water in which to mix LP-55. This is based on production rate and desired recovery time. The volume of LP55 to be used is then based on the expected total water production over the recovery time. For example, if the recovery time is six months, and the production total is 5480 bbls, the required volume can be calculated. LP-55 is used at a concentration of 0.002 gal/bbl gives 11 gallons of LP-55. If the CPT nomograph shows that 4,000 gallons of water should be used, then eleven gallons would be added to 4,000 gallons of water for placement. LP-55 can be diluted with water and lubricated down the annulus of wells or through small tubing strings to treat water downhole. It can also be metered into water going into injection or disposal wells. In © 2005, Halliburton Many oil operators routinely run remedial acid treatments on their wells and follow with inhibitor squeezes after cleaning up the treating fluids. With the Calchek service, the producers are able to stimulate their wells with the same treatment at reduced cost. The Calchek service treatment is intended for application in either limestone or dolomite formations. Protex-All Inhibitor Protex-All is a blend of LP-55 and a surfaceactive agent that forms a slowly soluble complex when placed in contact with an aqueous fluid. This complex appears to have very high adhesive properties on tubular goods and on sandstone and limestone formations. Protex-All provides long term protection against gypsum, calcium carbonate, and barium sulfate scales. The following types of treatments have been performed in the field: 8 • 54 Stimulation I Chemical Stimulation • dumping 1-5 gallons of Protex-All down the annulus and overflushing with water length and height of the fracture is required. The effective permeability of the formation must also be known so that the fluid loss coefficient can be calculated. The effective permeability should include both matrix and fracture permeability, which is more important in limestones and dolomites rather than in sandstones. • placing Protex-All at a concentration of 1 gallon/1000 in an acid or aqueous fracturing fluid • placing 1-5 gallons of Protex-All in water displacing this dispersion into the formation If fracture dimensions are not available from frac plans or effective permeability from logs is not available, then reasonable values must be assumed. These will probably vary from one area to another depending on depth, type of formation, etc. Protex-All is only very slightly soluble in aqueous fluids, but is readily dispersible at low concentrations. Notice that Protex-All should be added to the aqueous carrying fluid on a continuous basis. Mixing Protex-All in high concentrations with water or an aqueous fluid will result in a mass precipitation of the complex. Once this complex adheres to steel, it is difficult to remove. Calculations and field evaluations indicate the following treatment suggestions: • Effective treatments can be obtained in both propped and natural or acidized fractures. • Treatments can be performed on previously fractured wells or along with fracturing jobs. Chemical Placement Technique (CPT) • Injection rates should be maintained at 1 BPM or lower while placing the chemical solutions. CPT is a method of placing chemical solutions having high fluid loss properties into producing formations to achieve slow feed-back with the produced fluids. This technique can provide long term control of scale and paraffin deposition by using solutions of Scalechek LP55 or Parachek. Emulsion breakers, corrosion inhibitors, foaming agents, bactericides and alcohols can also be placed for slow feed back. • No fluid loss additives should ever be incorporated into the chemical solutions. • The well should be left shut in for several hours to permit pressure to dissipate. • Recovery times of 6 months to 15 months have been achieved using LP-55 in water at a concentration of 10 gallons/1000 gallons. The placement of chemical solutions must be done in formations that contain natural fractures, induced fractures that are propped, or along with a fracturing treatment. This is necessary since the slow return of the chemicals is a result of the pressure drop profile or flow patterns that exist in a fractured formation. Injection into an unfractured formation will result in a fairly rapid return of the chemicals. It is possible to place two or more treating chemicals into a formation together. However, this requires careful selection to avoid incompatibility. Chemicals that are highly adsorbed on formation rock require increased treating levels to be effective (such as some emulsion breakers and corrosion inhibitors). Adsorption will not completely inactivate the materials. In fact, it will probably increase the recovery time but decrease the concentration being returned. With corrosion inhibitors in sandstone formations, as much as 50% of the chemical injected in the initial treatment may never be recovered. However, on subsequent treatments nearly 100% will be recovered. Equations have been developed which permit calculation of total feed back time and also the initial concentration of chemical being returned in the produced fluids. In order to use the equations, there are a number of things that must be known or assumed about the formation. First, the equations were developed for flow in a vertical fracture system. Knowledge of the © 2005, Halliburton 8 • 55 Stimulation I Chemical Stimulation Figure 8.11 – CPT Nomograph © 2005, Halliburton 8 • 56 Stimulation I Chemical Stimulation Unit I Quiz Fill in the blanks with one or more words or select the correct answer(s) to check your progress in Unit I. 1. Scale deposits can be found in ____________________ ____________________, ____________________, ____________________, and ____________________ ____________________ . 2. Scales are classified as ____________________ ___________________, ____________________ ____________________, or ____________________ ____________________. 3. Most scales appear as ______________________________________________ ______________________________________________ ______________________________________________ 4. Which of the following fluids can be used to remove acid soluble scales? (check all that apply) _____a) Regular Acid _____b) Penetrating Acid _____c) Diesel _____d) NE Acid _____e) Fe Acid _____f) Xylene _____g) MSA _____h) Water _____i) PAD 5. ____________________, ____________________ ____________________, ____________________ and ____________________ are chemical methods of removing acid insoluble scales. 6. Scale formation can be inhibited with: _____a) Scalechek LP-55 additive _____b) SCP-2 © 2005, Halliburton 8 • 57 Stimulation I Chemical Stimulation _____c) Calchek service _____d) Protex-All inhibitor _____e) All of the above Now, look up the suggested answers in the Answer Key. © 2005, Halliburton 8 • 58 Stimulation I Chemical Stimulation Unit J: Placement Aids During stimulation operations it is sometimes necessary to divert the stimulation fluid. Diverting materials should bridge effectively and be easily removed. Temporary Bridging Agents are solids used to divert treating fluids in stimulation operations and to protect producing zones during workover operations. Selection of Bridging Agent Well Conditions A series of temporary bridging agents have been developed for diverting operations involving a variety of well conditions and a wide range of temperatures. The selection of the bridging agent and concentration is based on: Temporary Bridging Agents The effectiveness of a Temporary Bridging Agent is dependent on its particle size distribution. TBA-110, the first water soluble, graded (specifically sized), temporary bridging agent was introduced in 1969. Early in 1970, TBA-350, the first oil soluble, graded, temporary bridging agent was introduced. The bridging efficiency of these graded materials was readily apparent in the field when pressure charts were studied. • formation fluids contacted • feet of formation • formation temperature • physical properties of the formation • type of well completion • placement technique Because of the efficiency of TBA-110 (TBA350 is now obsolete), TLC-80, with a particle size distribution to help prevent caking and to divert effectively, has also been added to the inventory. Melting Point A bridging agent should be selected that has a softening point high enough that it does not soften before the diverting operation has been completed. In most treating operations, the treating fluid preceding the diverting material cools the formation. Effective diversion may be accomplished when the normal bottom hole temperatures exceed the melting point of the bridging agent. The graded bridging agents contain particles ranging from about 0.25 inch to 0.002 inch in diameter. The larger particles bridge on the zone. The smaller particles successively bridge on larger particles until a bridge is built that has very little permeability. Pressure increases are then sufficient to register on pressure recording charts and show effective diversion. Solubility Bridging agents previously used that were ungraded (TLC-W3, TLC-15) bridged effectively and probably slowed down the flow of treating fluid into the bridged zone slightly. However, the slow down was not enough to show a pressure increase on pressure recording charts © 2005, Halliburton A bridging agent should be soluble in the produced or injected fluid if possible. Oil soluble bridging agents are not used in water injection and disposal wells. Water soluble bridging agents should not be used in oil wells and gas wells that are not making water unless an overflush of water is used to dissolve the agents. Otherwise, a cleanup operation should be planned with dilute acid or brine. Some 8 • 59 Stimulation I Chemical Stimulation materials will sublime (go from solid to vapor) in gas wells at the bottom hole temperature and can be removed without a solvent. increases the overall effectiveness of the diverting process. Carrier Fluid Well Completion Type The carrier fluid is an important consideration in diverting. It should have its specific gravity and viscosity adjusted to maintain a uniform dispersion of the bridging agent. The carrier fluid may be gelled or emulsified. Laboratory tests show that gel type carrier fluids are less difficult for the bridging agent to hold in place than emulsions. The strongest bridge is probably achieved with carrier fluids having the minimum viscosity for maintaining a uniform dispersion of the bridging agent. The lower viscosity lets the carrier fluid continue to flow through the bridge for a slightly longer time and deposit more solids for a stronger, less permeable bridge. The tail end of the carrier fluid should then have maximum pumpable viscosity so that it will not flow through the bridge and will act as a blanket. This would be the ideal method of application but would be difficult to achieve. The most practical option would be to compromise between maximum pumpable viscosity and the viscosity necessary to keep the bridging agent uniformly dispersed. The type of well completion should be considered along with the physical properties of the formation. If the formation to be bridged is fairly homogeneous and free of vugs or fractures, consider bridging agents that are composed of smaller particles. These particles should not bridge on perforations or fractures, but instead will bridge on the formation and fill perforations and channeled areas behind the casing. Such bridging agents are Matriseal O and Matriseal OWG. If the zone contains vugs, fractures or is composed of coarse sand or gravel that will be difficult to bridge, a bridging agent such as TLC-80, TBA-110 or FRAX-160 wax should be considered. Since bridging may be achieved on the perforations or on the formation, placement techniques must be considered. Placement Techniques When the graded bridging agents (TLC-80, TBA-110) are used, special techniques must be used if they are to pass the perforations and bridge on the formation. Low concentrations of bridging agent should be used per gallon of the carrier fluid, which must be viscous enough to maintain a uniform dispersion of the solids. Larger volumes of carrier fluid are then necessary to transport sufficient bridging agent through the perforation. Concentration of Bridging Agent The type of well completion and previous well treatment history will help determine the quantity of solids required to form a bridge. Erosion of perforations and presence of voids, vugs, and fractures are also important factors. The best volumes of both carrier fluid and bridging agent vary widely from area to area. However, a general rule seems to be to use at least twice the volume of the casing covering the interval for carrier fluid. The quantity of solids should depend on type of diversion being attempted. If you desire to bridge on perforations, a high concentration of bridging agent is required in a carrier fluid which has as low a viscosity as possible and can still transport the bridging agent to the perforation. Decreasing the pump rate when the diverting material approaches the zone is considered one of the most important steps in correct placement techniques. This allows an initial bridge to be accomplished more easily and quickly and © 2005, Halliburton Open hole completions in fractured or vuggy limestone may require 2-4 pounds of TBA-110 per gallon of carrier fluid. An open hole 8 • 60 Stimulation I Chemical Stimulation completion in a highly permeable formation, free of fractures and vugs, may be bridged and sealed with 4-6 pounds of TBA-110 per square foot of open hole surface area. Bridging on 3/8 inch perforations may be achieved with ½ to 2 pounds of TBA-110/gallon of carrier fluid. The higher concentrations will bridge more quickly, have less loss of carrier fluid to the formation, and form a stronger bridge. zone. The data presented for bridging in open hole, highly permeable, or lost circulation zones were obtained using the BB Bed test. The zones were considered unfractured and non-vugular. Particle Size Distribution Effectiveness of a bridging agent is dependent on its particle size distribution. The efficiency of various bridging agents is compared in Table 8.7. The data were obtained at 76°F using water gelled with 100 pounds of WG-6 per 1000 gallons. The specific gravity of the water was adjusted to maintain a uniform dispersion of the bridging agent. Bridging agents were used at a concentration of 28 pounds per gallon. The carrier fluid containing the bridging agent was displaced with kerosene using a constant pump rate of two BPM. The maximum pressure was recorded. The bulk density of the solids is also a factor in determining the concentration to use. TLC-80 is used at about one-half the TBA-110 concentration. All TLC-80 materials available will not bridge on a 3/8 inch perforation. Specific data on bridging agent concentrations are listed in each bridging agent bulletin. The data on the perforations were obtained without formation, or other materials surrounding the casing, and would simulate bridging on perforations in a highly fractured or vugular Pressure Held (psi) Fracture Width 0.10 0.13 0.16 0.20 0.24 0.32 0.40 TBA-110 + TLC-15S (graded) + Unibeads* TLC-80** (Velsicol Coarse) 1000 1000 340 0 1000 680 290 0 1000 685 234 No bridge 1000 635 129 No bridge 1000 485 65 No bridge 385 No bridge 40 No bridge No bridge No bridge No bridge No bridge Table 8.7 - Bridging Agent Efficiency *A 1:1 blend of Unibead Buttons and Unibead Wide Range material was used. **These materials bridged fracture widths shown to have 0 pressure buildup but did not seal. Field operations at higher pump rates than can be achieved in the laboratory have shown that these materials will achieve some fluid control. However, they are not expected to be nearly as effective as TBA-110, TLC-15S, TBA-350, or the 1:1 blend of Unibead materials. + Obsolete • disperses readily in aqueous treating fluids Open-hole completions in fractured or vuggy limestone may require 2-4 pounds per gallon of carrier fluid. Bridging on perforations can be achieved at 0.5-2.0 pounds per gallon. • aids in maintaining a uniform dispersion of the polymer • leaves the sandstone formation water-wet ® MATRISEAL O Matriseal® O is used for diverting treating fluids in wells that have been completed with sand packs behind slotted liners or sand screens. It is a finely ground, oil-soluble polymer slurried in a carrier fluid. The carrier fluid has been carefully selected to provide a pourable slurry which: © 2005, Halliburton 8 • 61 The oil-soluble polymer is readily soluble in most crude oils, kerosene, diesel, and Paragon (aromatic solvents). Its particle size has been controlled so that it passes through 20-40 mesh sand (permeability of about 121 darcies) and bridges and seals on Oklahoma #1 sand (permeability of about 9 darcies). Musol® A, solvent, included in a treating placement fluid with Matriseal® O softens the Matriseal® O Stimulation I Chemical Stimulation aqueous treating fluid a white precipitate forms that functions as a fluid-loss additive for diverting. The slow solubility of this precipitate in water, oil, and gas enables it to divert effectively and still have good cleanup properties for all applications. diverter particles. The softened particles stick together and do not divert effectively. Matriseal® O diverter, compatible with LoSurf259 and LoSurf-300, are the preferred nonemulsifiers for sandstone acidizing. Matriseal® O can be dispersed in HF acid treating fluid. The acid flows through the liner and sand pack and penetrates the formation. The resin component of Matriseal O filters out on the face of the formation and diverts acid into areas of the formation having lower permeability. Progressive diversion occurs and eventually distributes acid over the zone. Musol® A solvent should not be included in carrier fluids with Matriseal® OWG. The dissolution rate of Matriseal® OWG increases to the extent that it will not be effective. Temporary Bridging Agents in Conjunction with Temblok Diverting Materials The oil soluble polymer is readily soluble in most crude oils and will be removed when contacted by produced crude oil. However, at times it may be desirable to spot a hydrocarbon solvent (kerosene, diesel or Paragon) over the zone for rapid removal of the polymer present. Temblok agents are a series of viscous fluid type diverting materials available in several varieties to meet differing application requirements for stimulation and work-over operations. Due to their viscous consistency, Temblok materials resist flow into the formation matrix. Where vugular or fractured zones are encountered, granular agents such as the Temporary Bridging Agents may be incorporated into the Temblok diverting materials to assist in bridging and sealing the zone. The Bridging Agent must be insoluble in the Temblok material selected. Table 8.8 describes the properties of various Temblok materials and compatible Temporary Bridging Agents. Matriseal® OWG Diverter Matriseal® OWG is a universal diverting material that may be used in treating or completion fluids for injection, disposal, oil and gas wells. Matriseal® OWG diverter has unique properties. It is a water clear liquid that may be metered into the stream on large volume treating operations, or it may be dispersed readily in the treating solution when batch mixing. When MATRISEAL® OWG is dispersed in the Temblok Type Fluid Temblok Time and Temperature Stability TBA additives that can be used if needed 80 Tough Water Gel 1 180-350°F 0.2 to over 30 days TBA-110 90 Tough Water Gel 2 200-350°F 2 to over 30 days TBA-110, TLC-80, FRAX-160 100 Tough Water Gel 80-200°F over 30 days TBA-110, TLC-80, FRAX-160 Table 8.8 - Temblok/TBA Properties 1. Should be prepared with saturated salt water for greatest stability, and to prevent dissolution of TBA-110. © 2005, Halliburton 2. 8 • 62 Do not use Calcium brines. Stimulation I Chemical Stimulation Unit J Quiz Fill in the blanks with one or more words or circle the correct answer(s) to check your progress in Unit J. 1. The effectiveness of a Temporary Bridging Agent is dependent on its ____________________ ____________________ ____________________. 2. Bridging agent type and concentration is dependent upon: _____a) formation fluids _____b) temperature _____c) formation interval _____d) type of formation _____e) all of the above 3. When the graded bridging agents (TLC-80, TBA-110) are used, special techniques must be used if they are to pass the perforations and bridge on the formation. ________________ concentrations of bridging agent should be used per gallon of the carrier fluid. 4. If you desire to bridge on perforations, a ________________ concentration of bridging agent is required in a carrier fluid which has as ________________ a viscosity as possible and can still ____________________ the bridging agent. 5. Musol® A solvent should not be included in carrier fluids with ____________________ or ____________________ because of dissolving problems. Now, look up the suggested answers in the Answer Key. © 2005, Halliburton 8 • 63 Stimulation I Chemical Stimulation Unit K: Job Calculations Three common job types are: 1. Spotting to the end of the tubing or packer 2 3/8-in. 4.7 Tubing 2. Balanced acid spot 4 1/2-in. 11.6 Casing 3. Flushing and overflushing We shall go through an example of each. Calculations for Spotting Acid to the End of Tubing or Packer In most wells, it is desirable to place as little fluid on the formation as possible. Many chemical placement designs call for the chemical to be spotted to the end of the treating tubing by circulating. To spot the acid or chemical, first find the total capacity of the tubing using the Red Book: Top of Acid ⎛ ft ⎞ Tubing Capacity = Depth (ft) × ⎜⎜ factor ⎟⎟ ⎝ gal ⎠ Tubing Depth 6,500 ft Then, subtract the amount of acid from the total tubing capacity: Flush Volume = Tubing Depth - Feet of Acid Spotted Example: Figure 8.12 – Acid Spotting Example How much 2% KCL water is needed to spot 250 gal 15% HCL to the bottom of the tubing? Solution: Tubing Capacity = 6500 ft × 0.1624 gal (RedBook ) ft = 1055.6 gal Flush Vol = 1055.6 gal − 250 gal = 805.6 gal © 2005, Halliburton 8 • 64 Stimulation I Chemical Stimulation 2 3/8-in. 4.7 Tubing Calculations for Balanced Acid Spot 4 1/2-in. 11.6 Casing Spotting a balanced acid pill may be necessary for acid soaking and perforating applications. The equal height (balanced height) of the acid can be determined with the equation: Height = Gallons of acid to be spotted gal ⎛ gal ⎞ factor(tubing) + factor(annulus) ⎟ ⎜ ft ft ⎝ ⎠ To find the volume of displacement: Feet of Tubing to Flush = Tubing Length - Feet of Acid Spotted Flush Volume = Feet of Tubing to Flush × gal factor(tubing) ft Top of Acid Tubing Depth 6,500 ft Note: The ability to spotting a balance acid pill is based on the assumption that the well fluid and the acid are the same weight. Example: Find the displacement volume necessary to spot a balance acid pill of 250 gal. Figure 8.13 Solution: Acid Height = 250 gal ⎛ gal gal ⎞ ⎜⎜ 0.4227 ⎟ + 0.1624 ft ft ⎟⎠ ⎝ = 427.28 ft Flush Height = 6500 ft - 427.28 ft = 6072.72 ft gal = 986 gal Flush Volume = 6072.7 ft × 0.1624 ft © 2005, Halliburton 8 • 65 Stimulation I Chemical Stimulation Calculations for Flush and OverFlush 2 3/8- in. 4.7 Tubin g 4 1 /2- in. 11 .6 Casing It is a standard practice to flush more than the volume of tubing after pumping acid. This ensures that: • any acid that is not spent can continue to penetrate the formation • there is no live acid in the tubing to cause corrosion • any secondary precipitates that could form from the acid reaction are displaced as far into the formation as possible Acid flush volume calculations are done from the bottom of the perforations or open hole section. So: Vol to Pump = Tubing Volume + Casing Volume to the Bottom Perf + Overflush Volume Example: Calculate the volume needed to overflush an acid job by 1 barrel per foot of perforations. Tubing Depth 6,500 ft Top Perf 6,700 ft Bot tom Perf 6,8 00 f t Figure 8.14 Solution: gal = 1005.60 gal ft gal Casing Vol = 300 ft × 0.6528 = 195.84 gal ft bbl 42 gal Overflush = 1 × × 100 ft ft of perfs bbl = 4200 gal Vol to Pump = 1005.6 gal + 195.84 gal + 4200 gal = 5401.44 gal Tubing Vol = 6500 ft × 0.1624 © 2005, Halliburton 8 • 66 Stimulation I Unit Quiz K: 1. Well Information: Casing – 5.5, 23 lb/ft L-55 to 10,200 ft Tubing – 2-7/8”, 6.5 lb/ft N-80 with a packer set at 9,850 ft Perforations – 10,030 – 10, 050 ft Calculate the displacement necessary to spot 2000 gallons of 10% FE acid to the end of the tubing. 2. Well Information: Casing – 5-1/2”, 15.5 lb/ft N-80 to 9,500 ft Tubing – 2-7/8” 6.5 lb/ft N-80 to 8,500 ft Perforations – 8,500 – 8,550 Assumption: Hole is full of a uniform weight of fluid. Calculate the volume of flush necessary to set a balanced spot of acid at the top of the perforations. © 2005, Halliburton 8 • 67 Stimulation I Chemical Stimulation Self-Check Test for Section 8: Chemical Stimulation Mark the single best answer to the following questions. 1. ______ True ______ False The major acids used in chemical stimulation are HCL and HF. 2. ______ True ______ False Commercially available HCL can be 20 °Be or 22 °Be. 3. ____________________________ acid is the only acid that will not damage chrome. 4. Check what procedures to observe when working with acid. _____a. wear goggles _____b. have sodium bicarbonate available _____c. wash eyes with strong water jet _____d. smoke around acid tanks _____e. add acid to water 5. If you have 22°Be acid, how much acid and water are required for 750 gallons of 7% HCL? __________ gal acid __________ gal water 6. ______ True ______ False Inhibitors decrease the corrosion rate of acid on steel pipe. 7. ______ True ______ False Halliburton corrosion inhibitors will protect metals other than steel, such as aluminum and magnesium. 8. ______ True ______ False Matrix acidizing is done at rates and pressures below fracturing pressure. 9. Emulsion break tests are run with ___________________ ___________________ and ____________________ _______________________. Complete separation of oil and acid in _____________________ to _____________________ minutes is desirable. 10. ______ True ______ False HF Acid is used to dissolve limestone out of a sandstone formation. 11. ______ True HF Acid’s rate of spending is constant; it never changes. ______ False 12. The major retarded HF system Halliburton offers is: _____a. Sandstone Acid _____b. FE _____c. ClaySol _____d. ClayFix _____e. Fines Control Acid 13. ______ True ______ False HF Acid can react with limestone to form an insoluble precipitate. 14. ______ True Spent HF Acid can react with sodium and potassium to form more HF acid. ______ False 15. Damage to a formation results when invasion of which of the following occurs? © 2005, Halliburton 8 • 68 Stimulation I Chemical Stimulation a. ______ Clay b. ______ Whole mud c. ______ Filtrate d. ______ All of the above 16. ______ True ______ False If the formation is limestone, mud damage can be removed with HCL or HF. 17. The cloud point of an oil is __________________________________________________. 18. The pour point of an oil is ___________________________________________________. 19. Paraffin can be removed ____________________, ______________________, and with ____________________. 20. Scales are classified as __________________ _________________ or _______________ ________________. 21. List three methods of removing acid insoluble scales. ________________________________________________ ________________________________________________ ________________________________________________ 22. What are two products used for scale inhibition? ______________________ ______________________ 23. ______ True ______ False Particle size determines how effective TBA agents are. 24. ______ True ______ False TBA products should be insoluble in formation fluids. 25. TBA agents can be placed using a. ______ acids b. ______ emulsions c. ______ gels d. ______ Temblok e. ______ all of the above Now, look up the suggested answers in the Answer Key at the end of this section. © 2005, Halliburton 8 • 69 Stimulation I Chemical Stimulation Answer Key Items from Unit A Quiz 1. hydrochloric, hydrofluoric, organic 2. damage removal / matrix / fracture 3. 20 / 31.45 4. sandstone 5. Formic / acetic 6. acetic Items from Unit B Quiz 1. Goggles 2. sodium bicarbonate 3. skin / eyes 4. hydrogen gas 5. water / acid 6. dust mask Items from Unit C Quiz 1. 1843 2. 2050 / gallons / water / 6620 / carbon dioxide 3. 1020 4. 288 acid / 712 gal water Items from Unit D Quiz 1. temperature, time of contact, type of acid, pressure, type of steel, ratio of volume of acid to exposed steel surface area. 2. Ff.) 3. HII 124 / HHII 500 4. Ff.) 5. 0.05 6. Organic Items from Unit E 1. skin © 2005, Halliburton 8 • 70 Stimulation I Chemical Stimulation 2. fracturing 3. collapse / coning / scaling 4. fracture acidizing 5. preflushes / cool 6. F 7. b 8. c 9. sustained – production acidizing Items from Unit F 1. a, c 2. e 3. physical and chemical composition of the formation, temperature, surface area of rock exposed to a particular volume of acid, concentration of excess hydrochloric acid 4. Clayfix 5. hydrocarbons / invasion / emulsions 6. Fines Removal Acid Items from Unit G Quiz 1. filtrate / clay / whole mud 2. Acid / Mud flush 3. F 4. Oil External Emulsions / True Oil Base 5. N-Ver-Sperse A / N-Ver-Sperse O Items from Unit H Quiz 1. T 2. F 3. temperature / solution 4. temperature / flow 5. The alternate coating of the pipe and draining of the oil, The presence of only a film of oil in contact with the pipe while the well is flowing oil through water zones, Rough pipe surface, Electrical charger on various materials in the crude oil, Temperature drop 6. F 7. Mechanical equipment, Solvents which dissolve the deposits, Heat, which melts the wax and reduces it to a liquid so that it can be easily removed 8. Crystal modifiers 9. Targon II / Tarchek © 2005, Halliburton 8 • 71 Stimulation I Chemical Stimulation Items from Unit I Quiz 1. Flow liner / tubing / perforations / formation face 2. water soluble / acid soluble / acid insoluble 3. Thin sealer or popcorn like laminated deposits crystalline deposits 4. a, b, d, e, g, i 5. GYPSOL, Liquid Scale Disintegrator, BaSo4lvent 6. e Items from Unit J Quiz 1. particle size distribution 2. e.) 3. formation 4. high / low / transport 5. Matriseal OWG / Matriseal O Items from Unit K Quiz 1. 2. gal = 2394.54 gal ft Flush Volume = 2394.54 gal - 2000 gal = 394.54 gal Tubing Capacity = 9850 ft × .2431 gal gal factor for 2 - 7/8" tubing = 0.2431 ft ft gal gal factor for 5 - 7/8" casing = 0.6625 ft ft 500 gal Acid Height = = 552.12 ft gal gal ⎞ ⎛ + 0.6625 ⎜ 0.2431 ⎟ ft ft ⎠ ⎝ gal = 1932.13 gal Flush Vol = (8500 ft - 552.12 ft ) × 0.2431 ft © 2005, Halliburton 8 • 72 Stimulation I Chemical Stimulation Self Check Test 1. T 2. T 3. Acetic 4. a, b, e 5. 175 acid / 825 water 6. T 7. F 8. T 9. produced fluid / treating solution / ten / fifteen 10. F 11. F 12. e 13. T 14. F 15. d 16. F 17. the cloud point is the temperature where paraffin begins to come out of solution. 18. Pour point is the temperature where oil will not flow when tilted to a horizontal position 19. mechanically /, solvents which dissolve paraffin, / heat which melts the way and reduces it to a liquid 20. water soluble /, acid soluble /, acid insoluble 21. GypsolYPSOOL, Liquid Sacle Disintegrator, BaSO4lvent 22. SCP-2 / Scalecheck, LP-55 23. T 24. F 25. e © 2005, Halliburton 8 • 73 Stimulation I
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )