ROUTINE INSPECTION SPECIFICATION – Electrical Safety (including
Portable Electric Power Tools)
1M
Inspection Frequency
3M
6M
12M
Name of Inspector: ______________ Date of Inspection: ____________
Key Information for Inspector
Portable electric power tool register
Sample size
Check all distribution boards
Check 10 tools and 10 leads from a cross section of subcontractors
Check
1.
2.
3.
4.
5.
6.
7.
8.
9.
Clear access is maintained to distribution boards
Earth leakage protection is provided at all distribution boards
Earth leakage devices are regular tested
Distribution boards are protected from the weather and damage from construction activities
Leads from distribution boards are protected from damage by the distribution board cover
Leads are maintained off the ground and are not doubled up.
Leads and power tools are within test dates
Visual examination of the leads is undertaken prior to use (check leads for damage)
Leads do not present a trip hazard
Inspector’s comments / observations
No. Observation / Action
By Who
By When
Date
Completed
Follow up actions
Ensure each non compliance has a corrective action identified
Ensure the corrective actions have been appropriately assigned
Sign off the Routine Inspection Register in the space provided
File this document in the routine inspection folder on top of the last inspection sheet under the Electrical
Safety tab.
Thiess Pty Ltd
Page 1 of 1
AM-CN-HS-FO-1400.13