TKEC TKEC ROCK CRUSHING & SCREENING PROJECT The project study is the consideration of all factors or conditions available to determine the profitability of the venture re: Rock Crushing & Screening of TKEC. The following are incorporated in the project study. 1.0 Summary 1.1 Location and Accessibility The proposed project is located at Barangay Tigkan, Naujan, Oriental Mindoro. The plant location is centred on geographical coordinates 13 deg. 16’ 37.80” N and 121deg. 11’ 08.04” E. Location Map of Naujan and Barangay Tigkan showing Project Site It is accessible from Manila via SLEX and Star Toll Way to Batangas Pier. Regular trip everyday via RORO vessel to Calapan Pier, Calapan, Oriental Mindoro; thence, land trip by private vehicle or public utility van for approximately less than 1 hour to the project site at Barangay Tigkan, Naujan, Oriental Mindoro. TKEC Project site Manila to Batangas Pier to Calapan Pier to Naujan (Project site) Daily Trip of Fast Craft from Batangas Pier to Calapan Pier 1.2 Ores or minerals to be produced The mineral to be processed is unconsolidated rock materials quarried from the riverbed of Naujan River. The quarry source is approximately 2.3 kilometers from the river. There is a vast available riverbed deposit consisting of unconsolidated materials of head size boulders, gravel and sand that is highly favourable as raw materials for crushing plant and in producing standard sizes of rock aggregates. The product sizes and percentage of material per sizes are during 1st and 5th year operational years: TKEC Product Size Range Rate (cu m) /day (5th yr) 61.6 Percentage 0 – 5 mm Rate (cu m) /day (1st yr) 44.8 Sand Gravel – ¾ + 12 – 22 mm 36.8 50.6 23% Gravel –G1 + 22 –40 mm 36.8 50.6 23% Gravel – 3/8 8 – 10 mm 40 55 25% 1.6 2.2 160 cum/day 220 Sludge TOTAL 28% 1% 100% Note: Sludge are supposedly wastes materials and will be treated by decantation in series of settling ponds. But it has economic value and used as garden soil or mixture in base coarse. 1.3 Planned mine and mill capacity The crushing plant has a rated capacity of 80 tons per hour. However, the ideal operating capacity is 80% of the rated capacity which is equivalent to 50 – 69 tons per hour. At an average of eight (8) working hour per day, it can produce 400 - 550 tons of aggregate equivalent to an average of 190 cubic meters per day at 2.5 material specific gravity. However for purposes of estimate, daily production forecast is in the range of 160 to 220 cubic meters and in 1 year with assumed 200 workable days, it can produce about 32,240 – 44,274. For conservative estimate and considering the testing and debugging activities, the planned production capacity for year one (1) shall be 32,240 cubic meters until it reached the maximum objective of 44,274 cubic meters per year. 1.4 Estimated life of mine The crushing plant will be forecasted to have a life of 10 years. However, it is for purposes of this study of obtaining the government regulatory requirement for the Five (5) Year Term of Mineral Processing Permit (MPP), a five (5) year financial forecast will be TKEC used including parameters in deriving payback period and internal rate of return. After the 5-year term of the MPP, the financial forecast will be assumed for succeeding 5 year of operations and will be replicated in the Five-Year Work Program, normal requirement in the renewal of the MPP in the 2nd cycle of the said permit. 1.5 Volume of investment The project is already in the operational stage for almost 1 year but on and off as it is still undergoing debugging and this study is a mandatory requirement for acquiring an MPP. As of the moment, the project is none operational and will wait for the timely approval of the MPP before it will again commence its operation. The volume of investment is PhP 37,168,000.00 which include plant and equipment acquisition cost, materials and supplies and initial operating capital expenditures. 1.6 Market Major market of the company are the family construction business, walk in buyers with existing construction projects and the several hardware stores in the Municipality of Naujan. The company itself is a supplier of aggregate materials to various infrastructure projects of the local and national government. Estimated distribution of the market shares are as follows: 1.7 Family Construction Business …60% Walk-in buyers …………… ……..20% Hardware stores …………………20% Production costs The crushing plant and its support facilities are on top condition and ready to operate once the MPP is approved. The production schedule depends on the issuance of the MPP and other permits. The assumed number of operating days in a year is 200 days, to give TKEC allowance for unworkable days which consist of holidays, bad weather condition due to typhoon, scheduled maintenance and unexpected breakdown of the machine and equipment. The average daily raw material requirement of the plant is 160 to 220 cubic meters. In the next five years of operation, the targeted annual production is within the range of 32,240 to 44,274 cubic meters which equivalent to 80,600 tons to 110,685 tons. The yearly operational activities and the corresponding production capacity and costs summary are as follows: Projected Estimated Total 5-Year Production Routine Operational and Operating Operations Capacity Maintenance Activities Expense (OPEX) + AEPEP, ASHP, ASDMP /Annum Year 1 –The 35,840.00 forecasted cu. m. 1. Daily delivery of P 13,114,049.74 materials by the tonnage for supplier to feed year is hopper, 1 35,840 cu.m and will gradually increase year. the of finish product and loading to dump trucks; to reach 44,274 on retrieval 5th 2. Monthly maintenance of the conveyor belt, cone crusher and jaw crusher 3. Quarterly maintenance of Electric generator 4. Weekly dredging of silt ponds and quarterly dredging of water reservoir. 5. Weekly Hauling of banlik to drying area. TKEC 6. Ten (10) annual days general shutdown for major repairs and maintenance crushing of plant machineries and structures. Year 2 Year 3 Year 4 Year 5 Total 39,424.00 cu. m. 43,366.40 cu. m. 44,274 cu. m. 44,274 cu. m. 207,178.40 Same as above P 13,436,783.47 Same as above P 13,813,082.65 Same as above P 14,101,376.10 Same as above P 14,371,566.62 P 68,836,858.58 cu m. (say 208,000) The company’s economic viability is not only selling finish aggregate products to walk in buyers but to sell materials to contracted projects in government infrastructure projects. The bright future of the construction industry due to bullish forecast thru the build-build program of current administration will surely propel economic activity of TKEC rock crushing project. The company’s forecast is that the increases in diesel fuel, raw materials, and employees’ salary were included to cover the result of inflation in the succeeding years. Please refer to the attached financial forecast matrix in the annexes for detailed information. 1.8 Employment: Number, nationality, positions and pay The persons employed are all Filipinos and majority are locals of the Municipality of Naujan, Oriental Mindoro. However, skilled workers are outsourced from other localities as the required expertise in the project management, plant maintenance and engineering works are not readily available in the host municipality. TKEC List of Positions and Salaries: Head Count Daily Rate Monthly Salary Annual Salary Plant Manager 1 1,150.16 30,000.00 360,000.00 PCO/Safety Officer Personnel Officer/ComRel Officer Cashier Crusher Operator/Foreman Heavy Equipment Operator Plant Tender 1 1 1 1 1 1 368.05 329.71 314.38 805.11 644.09 588.88 9,600.00 8,600.00 8,200.00 21,000.00 16,800.00 15,360.00 115,200.00 103,200.00 98,400.00 252,000.00 201,600.00 184,320.00 DT Driver Welder Security Personnel Laborer Total Basic Salaries 13th Month Pay 1 1 1 1 805.11 402.56 345.05 287.54 21,000.00 10,500.00 9,000.00 7,500.00 252,000.00 126,000.00 108,000.00 90,000.00 1,890,720.00 157,560.00 Position Government Payables (SSS, HDMF, PHIC) Total Salaries, Wages and Benefits 56,721.60 2,105,001.60 For the five years of the financial budget, the salaries and wages will have an approximate cost of about Php 10,957,576.91 which covers provisions for salary increments as mandated by applicable regulatory requirements. 1.9 Profitability The following assumptions are derived based on actual parameters such as prevailing selling cost of the aggregate products, the annual production capacity of the plant and the total operating cost as well as the annual social development expenses. In the financial analysis, the numbers would tell that the project is highly viable. Please refer to the attached financial analysis. 1.10 Sources of Financing The crushing plant has been installed and undergone several testing and debugging. The money used in the acquisition of equipment and machinery, site development and plant installation are all provided by the owner. What is left to be funded is the operating expenditures (OPEX) to start in full swing the plant operations. The source of fund will partially come from company’s money in the bank. TKEC The proof of financial capability is herein attached with the amount of deposit certified by the bank. 1.11 Relation of project to national economy According to reports from Manila Bulletin, “the Build, Build, Build program is the Duterte administration’s medium-term goal to increase infrastructure spending from 5.4 percent of the country’s Gross Domestic Product (GDP) in 2017, to 7.3 percent by the end of President Rodrigo Duterte’s term in 2022. This is higher than the 2.4 percent average recorded by the past six administrations in the last five decades — and the highest budget allocation for infrastructure in Philippine history.” - Anna Mae Lamentillo of Manila Bulletin The remaining years of the Duterte administration will see the completion of big-ticket projects like the Philippine High Standard Highway Network Program, which aims to build and lay the ground work for the 1,049 km of new high-standard highways and expressways in Luzon, Cebu, and Davao. For instance, projects included in the Luzon Spine Expressway Network — a masterplan which aims to connect the northernmost part of Luzon to the southernmost part — will soon be accessible to the public. In 2019 alone, key segments of the Tarlac-Pangasinan-La Union Expressway, Central Luzon Link Expressway, NLEX Harbor Link, Metro Manila Skyway Stage 3, and C5 Southlink will be completed. Sangley Point International Airport should be finished in two years, according to Malacañang. A total of PHP909.7 billion out of the proposed PHP3.757 trillion national budget for 2019 will be allotted for the construction of the flagship projects under the "Build, Build, Build" program. Oriental Mindoro and its adjoining Province will definitely have the share from the budget stated and that will surely need volumes of aggregate materials. TKEC 2.0 Economic Feasibility 2.1 Market Study: 2.1.1 World demand and prices of the ore/mineral for the last ten years. Not Applicable as the materials or products is to be sold to local market. 2.1.2 Local demand and prices of product for the last five years The historical selling price of aggregate materials based on DPWH infra projects for commonly used sizes of materials are as follows: Year Gravel (3/4) Sand (S-1) Gravel (G-1) 2014 570 530 550 2015 590 560 590 2016 610 580 620 2017 650 600 650 2018 680 640 700 Annual Trend in Aggregate Material Cost 800 700 600 500 400 300 200 100 0 2014 2015 2016 2017 Gravel 3/4 Sand Gravel G-1 2018 TKEC Source: DPWH – Oriental Mindoro An average of 16% to 18% increase for five (5) years was noted and this is attributed to the cost of fuel, spare parts and labor. Based on the above figures, the aggregate materials used in the construction industry is increasing at a fast rate due to high demand and the shortage of materials in the market. 2.2 Forecast of future prices It is forecasted that the price of aggregates will further increase in the next five to ten years by 3-5% every five years. The demands will be the driving force of the future increase in prices as the Government and private business sectors are gaining momentum in building infrastructures to fuel the local economy in Mindoro and the decentralization of the national government’s major function to LGUs thus giving more opportunities to build needed infrastructures e.g. roads, bridges, economic centers, etc. 2.3 Availability of raw materials, fuel and power and other service facilities. a. Raw Materials The feed to crushing plant will come from riverbed quarries which consist of sand, gravel and boulders and are widely distributed along the river channel of Naujan River. A supply agreement was entered into by TKEC with following permit holders as follows: TKEC TKCC. (Please refer to annex 2 as attached copy of permit and supply agreement) The raw material deposit is considered part of the alluvial flood plain of nearby mountain, which is overlain by unconsolidated / transported debris consisting of sand, gravel and boulders. These materials when crushed to the desired sizes will produce sizes that are used as material component in the mixtures of masonry, backfilling, road ballast, etc. The average specific gravity of the materials found along riverbed of Naujan River is 2.5. Municipality of Naujan as seen in the Topographic Map of NAMRIA is traversed by several big river systems. The rivers have an abundant deposit of sand/gravel/boulder materials deposited in the river of Naujan. Aggregate material reserves from these rivers will not be discussed in detail since the proponent will engage only in crushing operation. b. Fuel and Power and other Services The crushing plant has an existing source of power, which is an electricity tap from the Oriental Mindoro Electric Cooperative. However, its equipment such as service vehicle, backhoe, loader and dumptrucks have its diesel fuel sourced from nearest gasoline stations. Diesel and oil consumption are as follows: Type Loader Backhoe Dumptruck SV Oils and Lubes Li/day 180 140 30 Year 1 1,152,000.00 896,000.00 192,000.00 15,000.00 10,000.00 2,265,000.00 Year 2 1,163,635.20 905,049.60 193,939.20 15,750.00 10,101.00 2,288,475.00 Year 3 1,175,387.92 914,190.60 195,897.99 16,537.50 10,203.02 2,312,217.02 Year 4 1,187,259.33 923,423.93 197,876.56 17,364.38 10,306.07 2,336,230.26 Year 5 1,199,250.65 932,750.51 199,875.11 18,232.59 10,410.16 2,360,519.02 TKEC Water for domestic and plant’s use is sourced from deep well. The average consumption is 8,500 cubic meter. However, water use in the washing of aggregates is recycled, thus only make up water is pump from deep well every 2nd day. 2.4 Availability of technical and skilled worker. The crushing plant has a manpower consisting of a plant manager, plant operators and tenders, equipment operator, maintenance, etc. Please refer to annex 3 for the list of names of manpower with their corresponding line of expertise. 3.0 Details of Project 3.1 Location and accessibility of crushing plant property. Way to reach the project site from Manila is by taking the route of the South Luzon Expressway and then a road going to Batangas Province. This route will pass the towns of Sto. Tomas to Star Toll Expressway to Batangas Pier where numerous RORO and fastcraft have a daily trip to Calapan, Occidental Mindoro. Upon reaching Calapan Pier, daily commercial trip thru public utility vehicles ply to the Municipality of Naujan. Thence, from the town, the company service vehicles are available going to the project site in Brgy. Tigkan. The crushing plant project is constructed within private land of company situated in Brgy. Tigkan, Naujan, Oriental Mindoro Likewise, the property of TKEC is a company owned with the following sketch of the lot and a technical description: TKEC 3.2 History of mining claims and mining operations, if any. Not applicable 3.3 Geologic setting (petrological environment, type and origin of deposit, persistency of orebody, geologic structures, type and grade of ore, and other geologic features) Not applicable 3.4 Stage of development. (Extent of exploration work and/or development works; the quantity and quality of mineral reserves) The crushing plant machineries and support facilities is in its commissioning and testing stage. TKEC 3.5 Plan of operations. (Planned capacity of the mine and mill; number of shifts per day; number of working days per year; flowsheet of mill; plan of marketing) a. Rated capacity of the rock crushing plant is 80 tons per hour b. Actual capacity is 80% of the rated capacity c. The operation is a single shift, 8 AM to 5 PM d. Number of workable days is only 200 days per year e. Process flowsheet is shown below 3.5.1 Description of the Plant Operation The supplier of raw materials, TH, is responsible for the delivery of raw materials from the riverbed quarry to the crushing plant of the TKEC at the designated stockpile area. From the stockpile, raw materials will be withdrawn and feed to the primary crushing machine or the jaw crusher. There will be two (2) approach in feeding materials, one is directly dumping of trucks to feed hopper while the other approach is the loader will scoop materials from stockpiles and delivered to feed hopper. Crushing Plant Process: From the feed hopper, the raw materials will pass to a reciprocating feeder which in turn conveys them to a double deck scalping screen with 2-3/4” and 1 ½ “ openings. The oversize of + 2-3/4” materials TKEC are crushed by a jaw crusher set at 2-3/4”. The jaw crusher product joins the + 1-1/2 “ to 2-3/4 materials from the double deck screen and are then feed to a Hydro cone crusher set at 1-1/2” undersize from the scalping screen and are all made to pass through a triple deck vibrating screen with ¾”, ½”, and ¼” opening thus effecting size classification or grading. The -1/4” materials are discharged into a hydra sander classifier and washed clean of any silt and clay materials which in turn, the waste water are discharged into settling ponds for containment and decantation. The desired product sizes are conveyed by stacking conveyors to their respective stockpile area, ready for truck loading. Truck loading is done using Payloader. Water requirement for aggregate washing operations are aided by a water pump connected to the water reservoir and being sprayed in the jaw crusher and the vibrating screens. Figure below shows the Schematic Diagram of the Process. TKEC Crushing Plant Process Flow Diagram, 80 TPH rated capacity TKEC 3.6 Environmental Protection and Management Plan TKEC is aware of the consequences if environmental protection is neglected in the process of crushing plant project. Water pollution and domestic wastes generation are major concern and the company will comply with all applicable laws, rules and regulations pertaining to environmental protection and corresponding budget shall be allocated for every activities on the Environmental Protection and Management. Identified environmental impacts and mitigating measures are presented below: a. Dust pollution from used of the access road during passage of cargo trucks. The road connecting the plant and the quarry area is a 2 kilometers all weather road and it shall be sprinkled with water at least twice a day using the company’s water truck with a capacity of 10,000 liters. But during hot summer months, frequency of sprinkling shall be more than twice a day depending on the rate of evaporation; and Speed limit will be imposed on all truck drivers of about 30 to 35 kph. b. Occupational Safety & Environmental Hazard posed by the presence of derelicts or worn out parts or equipment. Industrial wastes and damaged/ long down equipment and trucks will be hauled to scrap yard at the designated area inside the plant premises for future disposal; and A safety signboard and warning signs shall be posted along strategic location to prevent entry of unauthorized personnel in the scrap yard. TKEC c. Deep excavation of settling ponds and water reservoir. A “no entry warning sign or authorized personnel only” shall be posted at the vicinity of the settling ponds or “authorized personnel only” sign shall be posted thereat. Plant personnel shall be educated and informed of the danger of falling and drowning at the settling ponds. d. Exposure of the plant workers from hazard of moving parts of the crushing plant. The plant is equipped with moving parts such as gears, motors and belt drives and these are hazards to workers which if not properly address could be a source of incidents. The following shall be implemented: Open gears and belt drives shall be enclosed with metal screens and painted with light colored paint; Posting of warning signs at designated areas; and All plant workers shall be required to undergo safety training and wear appropriate PPE’s; e. Tree Planting of Plant Perimeter The perimeter of the plant shall be planted with 2 lines of ornamental plants such as a combination of Fire Tree and Mahogany. Spacing of is 2 meters by 2 meters. The perimeter length is about 630 meters but only 500 meters shall be planted as other areas are covered with support facilities. Approximately, the number of trees to be planted 500 seedlings. TKEC f. Establishment of Seedling Nursery TKEC will establish a seedling nursery and the seedlings shall be composed of species such as acacia auriculiformis, narra, mango tree, and Ipil tree. The seedlings shall be utilized in the company initiated tree planting activities and some are to be donated to civic organization, LGUs, etc. for their use in their three planting program. The capacity of the seedling nursery is 30,000 and the corresponding number of seedlings per species are as follows: i. Acacia ……………….. 10,000 Narra ………………… 10,000 Fire Tree ……………. 5,000 Fruit Trees (various) .. 5,000 Maintenance The maintenance activities for the planted trees are the following: - First and Second Year During this period, ring weeding and grass clearing shall be done. Also, application of fertilizer and if necessary, spraying of insecticides will also be conducted. Daily watering shall also be implemented particularly on dry months. - Third and Fourth Year At this period, it is expected that trees have already grown up. However, it is also projected that about 10% maybe the mortality. Therefore, replanting will be done to replace the dead trees and those that are stunted in growth. TKEC Details of the maintenance activity such as grass cutting, ring weeding, replanting, etc. will be reflected in the annual environmental protection and enhancement program. f. Stockpiles / drainage including sedimentation (waste dumps/ spoils and ore) One of the sources of water pollution is the raw material stockpile consisting of sand, gravel and silt wherein during rainy season, this stockpile will be washed out of its silt materials and carried the fines towards the open spaces and canal and possibly to the river. Once a month, cleaning of the plant flooring and structures will be done and it is expected that voluminous amount of silt maybe washed away and may contribute to siltation problem if not be contained or treated in the pond. g. Mine Dewatering Utilization for or Road Pit Drainage Watering, Including Processing, Disposal by Evaporation Excess water is expected during water sprinkling of the road. The excess water contaminated with silt from the road will naturally flow towards the canal and deposited the silt materials in it. The silt may flow towards the creek and accumulated thereat. h. Process water The waste water derived from cleaning of aggregates in the crushing machines and vibrating screen may contain approximately 1-2 % of silt materials. If not treated or contained in a settling pond, this is one of the main sources of pollution problem. TKEC Huge volume of water will be used during 8-hour operation. It is estimated that about 50 cubic meters of water will be pumped daily at a rate of 300 liters per minute and then distributed by means of piping system and water sprinkler system to the different stages of crushing and screening operations. The computed volume of silt produced per day is approximately 1 % of raw material volume. Silt content of the raw materials varies and depends on the quality of the riverbed deposit. i. Settling Pond Slime containment ponds play an important part in the prevention of water pollution. The efficiency of containing the waste water depends on the capability of the ponds to accommodate the daily volume of effluents produced in the operation. Therefore, its sizes and design have a direct effect on the efficiency of treating the waste water. Undersize slime ponds will not serve the purpose as silt containment facilities and eventually, water pollution will occur if the pond is not capable of containing well the effluents. The waste water coming from the crushing plant operation is directed to flow to a series of settling ponds consisting of three (3) compartments. There will be two (2) units of settling ponds which will be used alternately during maintenance and cleaning/desiltng. The sizes of each compartment are the following: Compartment A - 8.10 m x 6.40 x 1.8 m Compartment B - 7.2 m x 6.40 m x 1.8 m Compartment C - 8mx6mx2m TKEC The two settling ponds shall be used alternately in order to maintain the efficiency of the waste water treatment facilities during maintenance activities while the 3rd compartment shall be for clear water pond. The banlik shall be temporarily stockpiled at the drying area located beside the settling ponds. Dried slimes or banlik will be used as mixture to the base coarse materials or to be used as garden soil. To prevent siltation of the adjoining land, the following are measures shall be implemented: Maintenance of drainage canal connecting the silt ponds to prevent silt from scattering and draining out of the pond structures. Posting of warning signs and signboards and prevent entry of unauthorized persons. TKEC Wash bay area for trucks will be provided to contain washed water and directed to flow towards the silt ponds. Frequent desilting at least every week to remove the silt and restore the containment capacity of the settling ponds. k. Infrastructure Plant structures and the office building could be a source of impact if all are not designed in accordance with the National Building Code of the Philippines. The support facilities were constructed in accordance with proper engineering design using standard materials specified by the Bureau of Standards of the DTI. l. Sewerage Source of impact are the wastewater discharge from the use of wash room and toilet facilities. The volume of waste water is minimal since there are only few workers in the plant and only stay in the area during day time or plant operating hours. The plant site is provided with two (2) compartment/chamber septic vault capable of treating the domestic waste produced by the plant workers. TKEC Design of 2-Chamber Septic Tank m. Solid Waste Disposal Waste streams in the plant operation consist of worn out tires, metal scraps, parts of machineries, unserviceable machines and equipment, etc. Additionally, wastes from food leftovers and office consumables are result of human activities. Solid wastes can contaminate water when not properly contained and disposed. Wastes stream observation will determine the types of wastes frequently produce in the project. Based on the observation, volume of biodegradable and nonbiodegradable waste materials will be determined. The company shall strictly follow the regulation on waste collection and disposal. Garbage cans each properly labelled with bio-degradable and non-bio-degradable will be stationed on strategic places. The collection of garbage shall always be coordinated with local government units for proper disposal. Metal junks and sealable scraps shall be collected and sold to junk shops. Material Recovery Facility shall be constructed and operationalized. TKEC n. Product Waste and Consumable Use, Storage and Disposal Water contamination from repair shop wastes and industrial consumables such as used oil, fuel and oil filters, empty oil drums / lubricant drums are main concern in the plant operation. These are considered hazardous wastes that necessitates proper handling, containment and disposal. The crushing plant operation will produce used oil and used batteries which are considered hazardous wastes. Used oil shall be stored in drums. The drum is then stored in a hazardous waste storage area which is enclosed with bundwall and properly labeled as used oil. The same will be done on used batteries and busted mercury bulbs. DENR regulation requires that handler or transporter of hazardous waste such as oil, fuel, grease, used batteries, etc. should secure identification as generator and transporter of such wastes. The company shall TKEC secure an identification as generator of hazardous waste at the DENR Region IV-A. Disposal of the hazardous wastes shall be strictly followed as mandated in the Republic Act 6969. All hazardous wastes shall have its own designated area of storage that is provided with concrete flooring and G.I. roofing with fence and appropriate signboard. Warning sign will also be installed to prevent unauthorized person from entering the storage area. 3.7 Mine Safety and Health Plan. The owner of the company will lead its workforce to promote the culture of safety and health including the customers and its contractors. Its aim is to sustain a practice of safety in the workplace that is free from hazard and workers are supportive and enthusiastic in the implementation of safety and health program within the company premises. The following safety and health plan are of prime importance which is to be supported by the management: To comply and implement the Revised Mine Safety Rules and Regulations and the OSHA 18001 (Occupational Safety and Health Administration) of the Mines and Geosciences Bureau and the Department of Labor and Employment, respectively Aside from the existing government rules and regulations on occupational safety and health, the company shall continue to adopt innovative techniques to improve its safety and health program by way of allowing its safety officer/s and rank and file employees to attend safety and first aid seminars and conferences/conventions on occupational safety and health including emergency awareness training. The management of TKEC is committed to pursue and continue the company's safety policy, and to provide direction and motivation by: TKEC o Maintaining a Safety Personnel who will be responsible to oversee the implementation of SHP. o Implementing company safety goals and objectives. o Improving and implementing a written Safety and Health program. o Ensuring total commitment to the Safety and Health program. o Facilitating employees’ safety training. o Establishing responsibilities for management and employees to follow. o Ensuring that management and employees are held accountable for performance of their safety responsibilities. o Establishing and enforcing disciplinary procedures for employees. o Reviewing the Safety and Health program annually, and revising or updating as needed. All employees are always required to wear their personal protective equipment while inside the work area and/or company premises Proper housekeeping shall be strictly observed at all working areas and plant premises; Wastes shall be segregated and properly disposed of according to the type of wastes such as bio-degradable, nonbiodegradable and hazardous wastes (used oil, battery and mercury bulb. Internal reporting for management consumption shall be done daily by the foreman and supervisors and shall be submitted to the Safety Engineer at the end of the day. The company through its safety engineer shall submit a monthly general accident report to concerned government agencies such as Mines and Geosciences Bureau and Department of Labor and Employment. A Monthly General Accident Report shall be submitted to MGB Region 4B TKEC To conduct monthly meeting of the Central Safety and Health Committee every 2nd Saturday of the month. Central Safety & Health Committee is composed of the following: Company Plant Manager Personnel / Admin Officer Head, Security Safety Engineer All Section Heads The CSC Officers shall meet once a month and has the following responsibilities: Recommends priorities and strategies to promote safety awareness in the plant; Records minutes of meetings and submitted to the top management for comments and fund allocation should it is necessary to procure safety gadgets, instruments, etc. Take up all safety activities, incidents happened and work hazards identified for deliberation and remediation. A monthly report of CSC shall be reported to the management and the MGB Region 4B. Supervisors shall conduct a toolbox meeting at the work place daily or as often as necessary to discuss tips and strategies to prevent accident at the work place. If accident has already occurred, focus of tool box meeting shall be on how to prevent recurrence of such accident and the corrective measures to be implemented. Short duration meetings or pep talks shall be done when the need arises in order to check employee’s compliance with proper work procedures and used of tools and equipment. This activity is an ongoing process to inculcate among the workers the importance of safety at workplace. The company has an open link with the Municipal Risk Reduction and Disaster Management Office, local PNP and the Fire Department of Naujan Municipal Government. The company will coordinate with the LGU of Naujan, TKEC Oriental Mindoro to train its employees in the conduct of Disaster Risk Reduction and Crisis Management Seminar. three (3) employees will be required to undergo said training It is the policy of the company to protect its employees, contractors and customers in times of emergencies, be it natural or cause by man. Hence, awareness thru proper education and information campaign shall be implemented periodically. In dealing with emergencies, the company shall create Emergency Response Team (ERT) who will be headed by the Safety Engineer as Commandant and assisted by the Plant Supervisor and the Unit Head as Responders. Simulation drill for emergency response shall be conducted four times a year. All employees shall be required to attend the drill as part of their training and to be conducted every month of June. This will be done in coordination with the LGU, Fire Dept. and PNP of Naujan. Budget for the Safety and Health Plan is about P 60,000 per annum. 3.8 Community Development Plan TKEC will respond to the need its host and neighboring communities by way of implementing the community and develop a plans and programs embodied in their Five (5)-Year Social Development and Management Program (SDMP) . The SDMP will be patterned in compliance to the Department of Environment and Natural Resources (DENR) Administrative Order No. No. 2010-21 entitled as ‘Providing for a Consolidated Department of Environment and Natural Resources Administrative Order for the Implementing Rules and Regulations of Republic Act No. 7942, Otherwise known as the ‘Philippine Mining Act of 1995’. During the consultation with the Barangay Program/Project/Activities shall constitute the following: Officials the TKEC Access to Education and Educational Support Programs; Access to Health Services, Health Facilities and Health Professionals; and Protection and Respect of Socio-Cultural Values. Livelihood Program to generate income and alleviate living condition of the marginalized and poor families of the community. For the Information, Education and Communication (IEC) campaign the company will regularly conduct meeting/consultation with the community also the following are other IEC programs/activities that the company will implement: Newsletter; Social media through Facebook, Twitter, Instagram; Participation in socio-cultural events to highlight the best practice of CSR/SDMP and environmental protection being implemented, etc.; Sponsoring training/workshop on Value Formation and Capacity Building of Local Stakeholders; and Participating in the Annual Mine Safety and Environment Conference for a better understanding of the mining industry, best practice of other mining companies on progressive rehabilitation as well as community development programs and the participation of the local stakeholders in sustainable development of our mineral resources. For the Development of Mining Technology and Geosciences (DMTG) due to the insufficient fund, the proposed program for this activity would be in support for the scholarship of the student who will take the courses in the field of agriculture and environmental science. The expenditures for the abovementioned programs shall be based on the one and half per cent (1.5%) Total Operating Cost. The estimated total cost for the implementation of the Program is in the range of PhP 13.1 million (Year 1) to PhP 14.4 million (year 5) and the ASDMP budget is therefore is in the range of PhP 193,000 (Year 1) to PhP 212,000 (Year 5) or a total of PhP 1,000,000 for the life of the project. For the implementation Public Awareness on Mining and Geosciences (IEC), the allocation is Php 29,000 (year 1) to P 32,000 (year 5) and for TKEC the Development of Mining Technology and Geosciences is Php 19,000 (year 1) to PhP 21,000 (year 5). The SDMP is a plan for the development of feasible programs/projects/activities for social services, in consultation and in partnership with its host barangay. Its main objective is to facilitate the improvement of the general welfare of the local residents during the operation phase and manage the program to its full effectiveness and efficiency so that the target beneficiaries shall be well prepared to be responsible, self-reliant and resource-based community capable of implementing and managing their own Projects and programs. 3.9 Socio-Economic Impact/s The project will benefit not only the personnel employed but including the LGU of Naujan and the community as well due to the following: Generate income for the employed and those engage in selling goods and services for the project activities Income tax and business tax are also the contribution to the local and national government Multiplier economic impact are expected also for the surrounding communities 3.10 List of equipment needed The following are the existing list of equipment: Mobile and diesel powered equipment Unit Equipment 1 2 2 1 Payloader Backhoe 10 - Wheeler Dump Truck Water Truck List of fixed equipment Unit Equipment 1 Crushing Plant Assembly TKEC 4.0 Financing Requirements 4.1 Investments 4.1.1 Exploration costs (research, experiment, studies, etc.) Not Applicable 4.1.2 Fixed investments - lands, buildings, other improvements, machineries and equipment, transportation equipment and others. The company has the following investment on its plant facilities and equipment: Machinery / Equipment ……………. P 31,928,000.00 Camp Building ……………………....P 2,150,000.00 Water Pollution Control ……………...P 90,000.00 4.1.3 Engineering and administration costs during installation of buildings, machineries and equipment. The cost is included in the above camp building expenses as lump cost covering construction and installation of plant structures, office building and employee bunkhouse. 4.1.4 Interest during installation and construction. Not Applicable 4.1.5 Trial or test runs costs. The plant’s testing and debugging is covered by the installation cost contract which is about P 750,000.00. 4.1.6 Contingencies. Not Applicable 4.1.7 Estimate of Working Capital. The plant is properly installed and ready to fully operationalize after the period of testing and debugging. Working capital needed for the 1st four months in order to commercially produce aggregate products is about P 3,000,000.00. TKEC 4.1.8 Detailed breakdown of fixed investment and working capital in peso and dollar components. The total capital investment is P 34,168,000.00 while the working capital is P 3,000,000.00. Tabulated below are the breakdown of fixed investment: Machine / Equipment Capacity 1 Lot Crushing Plant 80 Tons Per Hour complete with Accessories and Tools 10 – Wheeler Dump 15 cu. M. No. of Acquisition Units Cost 1 lot 12,000,000.00 3 4,550,000.00 2 10,080,0000.00 1 3,300,000.00 Trucks Backhoe Hitachi EX 1.2 Cu. M. 2256 SR Caterpillar Wheel 1.0 Cu m. Loader 950H Pick Service – Ford Isuzu 1 1,998,000.00 Raptor Sub-Total 31,928,000.00 B. Site Development / Admin Bldg. Project Activities Unit of Measure Admin Bldg /Office / Within plant premises Repair / maintenance shop Sub-Total Cost 2,150,000.00 2,150,000.00 C. Environmental CAPEX & Regulatory Permits Project Activities Unit of Measure Cost /Structures/Equipment Settling Ponds Drainage Canals & 3 compartments ponds & 90,000.00 70 line meters Canal Sub-Total TOTAL ………………… 90,000.00 P 34,168,000.00 TKEC The working capital needed to start the operation is minimal as all the plant machineries and equipment are already functional in good condition. It is estimated that the first 4 months of full operation will need only about P 3,000,000.00 which is enough to generate sufficient revenue to roll over in the succeeding months. The initial revenue will ball roll the cash on hand generated on the 1st 4 months to sustain onward the lucrative rock crushing operation. The total fixed investment plus the working capital is about P 37,168,000.00. 4.1.9 Annexes: Copies of machinery, spare parts and equipment listings and specification, itemized freight costs, insurance, customs duties, fees and other taxes; copies of official or pro-forma price quotations; detailed list of personnel required and their technical qualifications; buildings and their distribution on the site; plant layout, other explanations, diagrams and data or possible changes, etc. Attached in the annexes are: a. As-built devt. plan showing the plant and facilities. b. List of Equipment and Machineries/Specifications c. List of Personnel & their technical qualifications 4.2 Details of milling costs. The cost component of milling or crushing cost covers the following: Cost of raw materials Salary and Wages Fuel, Oil and Lubricants Maintenance (spare parts) and Repair Electricity The main source of power is the electricity supplied by the electric cooperative of the Province of Oriental Mindoro. Direct Milling Cost TKEC Миллионы DIRECT MILLING COST 13,80 13,60 13,40 13,20 13,00 12,80 12,60 12,40 12,20 12,00 11,80 For further information as to the raw material cost, fuel and oil, maintenance and electricity cost, please refer to attached annex. 4.3 Details of all-in operating costs. Table below shows the relationship of the production volume and the all-in operating costs which comprise of the direct milling cost and the overhead costs. 14,50 50,00 14,00 40,00 13,50 30,00 13,00 20,00 12,50 10,00 12,00 Production Volume, cu. M 4.4 Тысячи Миллионы COMPARISON: PRODUCTION VOLUME TO ALL-IN OPERATING COST All-in Operating Cost Details of marketing costs. We limit our market to walk in buyers and supply of materials to the government project. The marketing cost is not included in the FS as this activity is to be handled by other company of the proponent. The price of the aggregate products are all on pick up basis. Hence, cost of cost of delivery and incidental expenses are to be shouldered by the walk in buyers. TKEC 4.5 Environmental Protection and Mine Safety and Health Costs. 4.6 Community Development Costs. 4.7 5 - Year EPEP Cost ……………………. Php 1,962,060.15 5 - Year Mine Safety and Health Cost …Php 200,000.00 Five Year SDMP Cost ……………………Php 1,017,293.48 Sources of financing. 4.7.1 Equity capital: amount and origin (nationality). The crushing plant is already existing and ready to operate, hence, no need to source out financing. The working capital shall be financed by the company. 4.7.2 Credits: their sources, terms and conditions and types of credit, form of payment, nature of interest, guarantees, etc. Not Applicable. PMI’s operation will not require credit facilities in any form as the expenses for start-up operating cost is minimal and to be shouldered by the company. 4.7.3 Financing in peso and dollar currency. Not Applicable 4.7.4 Table of sources and uses of funds. Not Applicable 5.0 Employment 5.1 Number, nationality, positions and annual payroll (salaries and allowances). The company employs a total of twenty-one (21) personnel. TKEC The following is the list of positions with corresponding number of employee/s. 5.2 Position Plant Manager Head Count 1 PCO/Safety Officer 1 Personnel Officer/ComRel Officer 1 Cashier 1 Crusher Operator/Foreman 1 Heavy Equipment Operator Plant Tender 1 1 DT Driver 1 Welder 1 Security Personnel 1 Laborer 1 Total 11 Detailed list of key personnel and their qualifications. Name of Personnel Plant Position MILAN CODERAS BELINDA MENDOZA Qualification Plant Manager With 6 Years Experience as Plant Supervisor Personnel Officer With 5 years experience B. /PCO/ in the company COMPLIANCE OFFICER ALLAN MENDOZA Safety Officer RONALD BAGASIN Plant Operator JOAN ORTEGA DT Driver REGINO SISCAR H.E. Operator DAN CRISBAL ALDABA Welder Two years experience as Safety and Security Officer With 3 years experience as Operator 2 years of experience as operator 5 years experience as H.E. operator (Backhoe & Wheel Loader) 8 years experiences The crushing plant project does not need an engineer or a highly skilled technician to have it perfectly run. The above list of personnel are sufficient enough. In case of major component needs to be calibrated, the company will outsource technician. TKEC 5.3 Personnel policies with respect to pay scales and allowances for local and foreign personnel. The salary of the workers shall be within the approved local wage / salary by the national wage board within the Province of Oriental Mindoro. No foreign nationals will be employed as the operation is so simple that can be managed and operated using locally available manpower. 5.4 6.0 Organizational chart. Economic Balance 6.1 Cost analysis Based on the analysis, the project is highly viable and profitable. The payback period is at maximum of 2 and a half years. 6.2 Return on investment Below is a simple expenses and profit estimates for 5 years. For further information please refer to attach annexes showing five (5) TKEC year financial estimate indicating the Revenue and Net Income year on year and the IRR. In the attached financial forecast, the project is highly viable. The expenses and net profit estimates were computed based on the project’s gross income less operating expenses and the annual social development program to arrive at the taxable income. Yearly net cash flow was derived after multiplying the taxable income by the current applicable tax rate of 30%. The annual revenue ranges from Php 26 million to Php 32 million in the fifth year of operations and after deducting tax dues to the government, the annual net income ranges from Php 9 million in the first year to Php 12 million in the fifth year. Shown below is the comparison of the operating cash flow and the projected net income of the project: Миллионы Comparison: Cash Flow to Net Income 25,00 20,00 15,00 10,00 5,00 2019 2020 Operating Cash Flow 2021 2022 2023 Net Income Payback period is 2.4 years or say 2 years with an average yearly cash flow of Php14 million. At the simplest level of analysis and with this financial forecast outlook, there is no doubt that the project will be of beneficial to the project owner, the government and the local stakeholders. TKEC Shown below is the sensitivity analysis for the IRR of the project assuming changes in revenues and operating costs: Revenue IRR %∆ 0% 10% -10% Operating Cost %∆ 30% 36% 30% IRR 0% 10% -10% 7.0 30% 27% 30% Schedule of Project 7.1 Construction. Not Applicable as the plant and its facilities were already constructed and progressively undergoing intermittent testing and debugging stage as operations progresses until the system is able to meet its maximum level of productivity. 7.2 Exploration, development and stoping operations. Not Applicable. The feasibility deals only with Crushing Plant Project and not mining / quarrying. 7.3 Mill test runs. Progressive test runs are being conducted on a monthly basis since plant was installed last year, 2018. The rock crushing operation’s moving parts particularly the clearances of primary and secondary crusher needs to be measured from time to time so adjustment is a critical activity as products relies mainly on the opening of the two machines. 7.4 Start of mill operations. The full-scale operation is expected to be implemented early next year in the month of February, 2020 or after the approval of the Mineral Processing Permit and Mechanical / Electrical Permit to Operate. TKEC 8.0 Name of Project Feasibility Preparer RENATO X. XXXXXXXX, MSc. Mining Engineer PRC License No. PTR No. Issued on Issued at Conforme: EPHRAIM X. XXXXXXX III Owner / General Manager
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )