ICE Demolition Protocol Case Study Upperton Road Viaduct, Leicester This Case Study describes how the ICE Demolition Protocol facilitated Leicester City Council to translate their commitment to the principle of sustainable development into a structured approach to the recovery and specification of reused and recycled materials. This Case Study also examines communication within the project team. Project code: AGG0087 Research date: March 2005 – March 2007 Date: March 2007 Front cover photograph: Upperton Road Viaduct, Leicester – Brick structure scheduled for demolition and replacement with low level bridge. WRAP and Envirocentre believe the content of this report to be correct as at the date of writing. However, factors such as prices, levels of recycled content and regulatory requirements are subject to change and users of the report should check with their suppliers to confirm the current situation. In addition, care should be taken in using any of the cost information provided as it is based upon numerous project-specific assumptions (such as scale, location, tender context, etc.). The report does not claim to be exhaustive, nor does it claim to cover all relevant products and specifications available on the market. While steps have been taken to ensure accuracy, WRAP cannot accept responsibility or be held liable to any person for any loss or damage arising out of or in connection with this information being inaccurate, incomplete or misleading. It is the responsibility of the potential user of a material or product to consult with the supplier or manufacturer and ascertain whether a particular product will satisfy their specific requirements. The listing or featuring of a particular product or company does not constitute an endorsement by WRAP and WRAP cannot guarantee the performance of individual products or materials. For more detail, please refer to WRAP’s Terms & Conditions on its web site: www.wrap.org.uk. Published by Waste & Resources Action Programme The Old Academy 21 Horse Fair Banbury, Oxon OX16 0AH Tel: 01295 819 900 Fax: 01295 819 911 E-mail: info@wrap.org.uk Helpline freephone 0808 100 2040 Executive summary This case study overviews the implementation of the ICE Demolition Protocol during the development of the Upperton Road Viaduct project from the conclusion of the outline design through to the completion of the detailed design and the development of the target cost for the construction works. The Upperton Road Viaduct is situated within the urban conurbation of Leicester. The project involves the demolition of a 12 span viaduct built circa 1890. This structure is to be replaced with a new low level road and bridge over the river. The requirement for the project stems from concerns over the capacity of the existing structure to continue to carry the heavy traffic loading of this key road route within the Leicester conurbation. The construction sequence required the construction of a temporary road and river crossing prior to the demolition of the existing viaduct. Following demolition, the new road will be constructed along the alignment of the existing viaduct Key aspects of the project case study include: Implementation: Outputs (Bills Of Quantities, Recovery Targets etc) Stakeholder Engagement: Issues, Barriers & Opportunities The following conclusions are drawn to the Upperton Road Viaduct case study: The ICE Demolition Protocol provided a structured approach for the client to translate a commitment to the principles of sustainable development into practice through material resource efficiency. The ICE Demolition Protocol methodologies stimulated the early consideration of material resource issues such that potential barriers could be further explored and where possible overcome. Engagement with the team allowed the preliminary pavement design report to include a section discussing recycling opportunities. This allowed the client group to understand how the thinking of the design team was evolving and provided a trigger for the client group to re-engage with the design team - to reiterate the corporate commitment to the use where possible of recycled materials. The client decision to adopt the ICE Demolition Protocol methodologies and the importance placed on sustainable development was not effectively communicated out with the core project team. This meant that, on occasions, there was the potential for agreed approaches to be omitted. A number of influencers in the industry remain to be convinced that recycled aggregates can perform on a like for like basis with primary aggregates in the context of road pavements. A lack of knowledge and technical expertise may represent a barrier to certain clients making an informed decision on the use of recycled aggregates. The following recommendations arise from the Upperton Road Viaduct case study: Clients should give consideration to issuing explicit instructions to their appointed design teams to incorporate appropriate references and information to support the implementation of material resource efficiency. This could in part be achieved through the design team being required to complete as part of the key documentation the Tender & Contract Check List for Recycled & Secondary Aggregates as published by WRAP. A rolling programme of research and Continuing Professional Development should be maintained to address the concerns still held by influencers and designers with regards to the specification and use of recycled aggregates, particularly in higher value applications. The availability of case studies and good practice guidance on the AggRegain and Highway Agency web sites should continue to be publicised within trade journals, targeted mail shots and industry exhibitions. Upperton Road Viaduct, Leicester 1 Contents 1.0 Introduction ............................................................................................................................. 3 1.1 The WRAP ICE Demolition Protocol Case Study Series .............................................................3 2.0 The Upperton Road Viaduct ..................................................................................................... 3 2.1 Viaduct Structure ...................................................................................................................3 3.0 4.0 2.2 Construction Sequence ..........................................................................................................3 2.3 Project Structure ...................................................................................................................3 2.4 Client Aspirations ...................................................................................................................3 Implementation of the ICE Demolition Protocol ...................................................................... 4 3.1 Outputs Required by the ICE Demolition Protocol ....................................................................4 3.2 Demolition & Site Clearance Phase .........................................................................................4 3.3 New Build Phase ....................................................................................................................5 3.4 Site Planning .........................................................................................................................6 Stakeholder Engagement ......................................................................................................... 6 4.1 Project Team Communication .................................................................................................6 4.2 4.1.1 Preliminary Pavement Design Report ..........................................................................7 4.1.2 Demolition Contract Enquiries ....................................................................................7 Highways Agency ..................................................................................................................7 5.0 Impact of Support to the Project Team ................................................................................... 8 6.0 Conclusions .............................................................................................................................. 8 7.0 Recommendations.................................................................................................................... 8 Appendix 1: ICE Demolition Protocol ................................................................................................... 9 Appendix 2: New Build Bill of Quantities ........................................................................................... 10 Upperton Road Viaduct, Leicester 2 1.0 Introduction This case study describes one of a number developed by WRAP across the UK, involving the implementation of the ICE Demolition Protocol on a range of projects. The case study overviews the process followed during the development of the Upperton Road Viaduct project from the conclusion of the outline design through to the completion of the detailed design and the development of the target cost for the construction works. 1.1 The WRAP ICE Demolition Protocol Case Study Series The series of case studies developed by WRAP concentrate on the issues and opportunities resulting from implementation of the ICE Demolition Protocol. The focus of the case studies is the recovery and use of recycled aggregates. Key aspects of the project case studies include: Implementation: Outputs (Bills Of Quantities, Recovery Targets etc) Stakeholder Engagement: Issues, Barriers & Opportunities Background information on the ICE Demolition Protocol is provided in Appendix A. Further information on terminology or other good practice support tools and guidance is available on WRAP’s AggRegain website: www.aggregain.org.uk. 2.0 The Upperton Road Viaduct The Upperton Road Viaduct is situated within the urban conurbation of Leicester. The project involves the demolition of a 12 span viaduct built circa 1890 over the Old River Soar and adjoining former railway yards. This structure is to be replaced with a new low level road and bridge over the river. The requirement for the project stems from concerns over the capacity of the existing structure to continue to carry the heavy traffic loading of this key road route within the Leicester conurbation. The replacement of the viaduct will also facilitate the regeneration of the former railway yard area, currently an area of vacant and derelict land. 2.1 Viaduct Structure The existing Upperton Road Viaduct structure is a combination of arched spans formed by engineering brick and simple supported spans framed in steel. The deck of the viaduct across the steel framed sections was formed by barrel vaulted brick. The linear edge walls forming a barrier either side of the single carriageway road beyond the footpaths were constructed from brick capped with cope stones. Parts of the structure were also formed in concrete including the strip foundations supporting the steel frame columns. 2.2 Construction Sequence The construction sequence required the construction of a temporary road and river crossing prior to the demolition of the existing viaduct. Following demolition, the new road will be constructed along the alignment of the existing viaduct. 2.3 Project Structure The project was structured on the basis of early contractor involvement, the contractor having been appointed to the project team by the conclusion of the preliminary design stage. The project team is set out below: Client: Leicester City Council Designer: Jacobs Contractor: Edmund Nuttall EnviroCentre joined this project team at the conclusion of the preliminary design phase in the capacity of sustainability consultant. 2.4 Client Aspirations Leicester City Council is committed to the principles of sustainable development. This commitment was translated into a practical desire to ensure that material resource efficiency through the recovery and reuse of recycled materials was adopted as a design principle on the Upperton Road Viaduct project. The methodology adopted by the Council to achieve their aspirations was the ICE Demolition Protocol. Upperton Road Viaduct, Leicester 3 3.0 Implementation of the ICE Demolition Protocol The implementation of the ICE Demolition Protocol methodologies helped to inform in a structured approach the material resource opportunities presented by the Upperton Road Viaduct project. 3.1 Outputs Required by the ICE Demolition Protocol The key outputs and requirements derived from the implementation of the ICE Demolition Protocol methodologies are: Demolition & Site Clearance Phase: Pre-demolition audit, identifying quantities and quality of materials likely to be generated during demolition and site clearance works. Demolition Bill of Quantities (D-BOQ) presenting the data from the pre-demolition audit in a transparent and accessible format. Recovery Targets, setting out the percentage and tonnage of material to be recovered during the demolition and site clearance phase, including identifying potential material re-use/recovery options. Demolition tender and contract documentation, explicit reference to the ICE Demolition Protocol requirements and the recovery targets established during the pre-demolition phase. Demolition audit, to verify that the recovery targets have been achieved and reconcile any variation between anticipated and actual material tonnages recovered. Site planning to identify location of material processing plant (on-site or off-site). New Build Phase Material resource assessment, to identifying where recovered materials could substitute for primary materials on the basis of equivalent standards, specifications, cost etc. New Build Bill of Quantities (NB-BOQ), presenting the data from the material resource assessment in a transparent and accessible format that maps onto the tools being used by the project team to quantify and order materials for the new build phase. New Build Recovery Target, setting out the percentage and tonnage of material to be reused or from recycled sources to be incorporated into the new build. New build audit, to verify the design targets have been achieved and reconcile any variation between anticipated and actual recovered material tonnages incorporated into the works. 3.2 Demolition & Site Clearance Phase The quantity and character of the material to arise from the demolition of the existing viaduct structure was determined through undertaking a pre-demolition audit. The audit was informed by a site walkover and a structural condition survey report previously commissioned by the Council. Material quantities were thereafter taken off from as built drawings held by the Council. The output from the pre-demolition audit is presented in Table 1. Table 1: Demolition Bill of Quantities Item Description Recovery Potential Quantity Unit Total Material Weight (tonnes) Demolition Recovery Index % Demolition Recovery Material Potential 1 Brick from existing viaduct RA 4,577 m3 9,154 90.0% 8,239 2 Road construction RA 81.9 m3 164 80.0% 131 3 Stonework Reuse 15.8 m3 38 80.0% 30 4 Granite kerbs Reuse 2.6 m3 7 80.0% 5 5 Paving slabs Reuse 19.8 m3 48 50.0% 24 9,410 89.6% 8,429 TOTAL 4,697 A Steel / wrought iron Recycled Not quantified B Internal unbound fill Recycled Not quantified 90% 50% Upperton Road Viaduct, Leicester 4 The pre-demolition audit highlighted the significant volume of brick to arise from the demolition of the existing viaduct structure. The brick on crushing would produce Recycled Aggregate. Of particular interest was the likely high quality of the engineering brick used to construct the viaduct given the structural loading that the brick was designed to carry. This introduced the possibility that the crushed brick would produce a higher quality Recycled Aggregate than would normally be able to be achieved from crushed brick. At the time of writing the Demolition Recovery Target was the subject of on-going discussions within the project team. The recovery target will be influenced by the method of demolition adopted for the main brick structure over the old River Soar. Consideration is being given to dropping the brick arches into the river and recovering the fallen brick through the subsequent dredging works. As the brick will be recovered with basal sediments of unknown character, this may reduce the percentage recovery and the quality of the recycled aggregate that can be produced (on crushing the brick described above). Whilst this approach is not favoured in terms of material resource efficiency, it is being given active consideration on the grounds of health and safety and potential cost savings. However, the adoption of the ICE Demolition Protocol methodologies allows the project team and, in particular the client, to understand the potential material resource held within the existing viaduct structure and thereby factor the identified recovery opportunities into a decision as to the demolition method to be adopted. Since the Demolition Recovery Index was agreed by the project team, higher rates of recovery have been observed on other demolition projects, with the recovery of hard materials such as brick in above ground structures tending towards 100%. These observations will be factored into the process being followed to agree the Demolition Recovery Target. Opportunities also arise to recycle materials recovered from the temporary road built during the initial phases of the project. The material resource incorporated into the temporary road is set out in the New Build Bill of Quantities set out below. The temporary bridge structure is proposed to be a Bailey bridge, designed for repeated reuse. 3.3 New Build Phase The completion of the preliminary design informed the preparation of an initial bill of quantities for the temporary and permanent works. This bill of quantities formed the platform for developing the New Build Bill of Quantities described by the Demolition Protocol. The output from this process is summarised below and presented in detail within Appendix 2. The New Build Recovered Material Potential is shown in Table 2. Although the methodologies of the ICE Demolition Protocol go beyond the consideration of bulk materials and aggregates in particular, the decision was made to focus on the higher volume materials. Table 2: New Build Bill of Quantities Summary Description Temp bridge Temp road New bridge New road Retaining walls Total Material Weight (tonnes) Coarse Aggregate weight (tonnes) 599 New Build Recovered Material Potential New Build Recovered Material Index % 387 278 46.4% 9,625 9,494 95.6% 7,533 6,816 76.0% 8,830 92.5% Piling platform, capping 9,935 Capping, sub-base 8,973 Piling platform, structural concrete 9,547 8,948 Capping, sub-base, basecourse, topsoil, foundation concrete, brickwork 588 331 208 35.4% Structural concrete, fill material, brickwork The New Build Bill of Quantities summary highlighted the significant opportunities for procuring recovered materials, recycled aggregates in this instance, as part of the temporary and permanent works. With respect to the materials considered the new Build Material Index range lies between 35.4% (retaining wall) and 95.6% (temporary road). Upperton Road Viaduct, Leicester 5 The phasing of the works was such that if recycled aggregate were to be incorporated into the temporary works this would require to be sourced from off-site. Consideration of the potential demand for recovered materials during the construction of the temporary road early in the design process, coupled with early Contractor involvement, allowed the Contractor to make informed enquiries regarding recycled material availability in parallel with their normal pre-construction material enquiries. Recycled aggregate arising from the crushing of brick from the demolition of the existing viaduct would be available for incorporation into the permanent works. The opportunity to directly reuse selected bricks to face concrete retaining walls and structures was also identified at this stage in the process. The issue of being able to break the existing brick bonding without damaging the brick was identified as a potential constraint to the direct reuse of the bricks arising from the demolition. The significance of this issue was to be informed by undertaking a trial on a test panel early in the demolition phase of the works. The New Build Recovered Material Potential assumed the specification of 20% Recycled Concrete Aggregate (RCA) in the structural concrete associated with the new bridge sub-structure including pile caps and abutment walls. It is recognised that that this approach is not consistent with the limitations placed on the use of RCA in areas potentially becoming exposed to de-icing salts. However, the followed methodology to compile the New Build Bill of Quantities has allowed this to be highlighted as a future opportunity to be explored if and when a wider research base becomes available with regard to the interaction of RCA and de-icing salts. At the time of writing the New Build Recovered Material Target was the subject of on-going discussions within the project team and the Highways Agency. These discussions are reviewed in the Section 4 below, which examines the interaction between members of the project team and other stakeholders. The opportunity for the temporary road construction to further test the performance of recycled materials incorporated within the construction at a relatively low risk was recognised. 3.4 Site Planning In addition to highlighting the recycling opportunities, the pre-demolition bill of quantities informed the quantity of recycled aggregate capable of being produced from the brick arising from the demolition of the existing structure. This allowed consideration to be given at an early stage to site planning and the identification of areas within the site for crushing and stockpiling materials. Early consideration of these issues was particularly important at the Upperton Road Viaduct site as the temporary road was also required to be routed through the site, therefore space was limited necessitating good site planning. This opportunity to consider site planning issues in advance was facilitated by the early contractor involvement of Edmund Nuttall. 4.0 Stakeholder Engagement The opportunities to maximise material resource efficiency on the Upperton Road Viaduct project were enhanced through early consideration of these issues in the design and construction process. Early contractor involvement and the structured approach established by the ICE Demolition Protocol facilitated this process. Material resource efficiency was integrated to the development of the design and project planning through discussion at selected project team meetings. The importance of material resource efficiency to the Council was emphasised to the core members of the project team through the attendance at these meetings of the Council’s Sustainability Officer. Whilst the outputs from the pre-demolition audit were generally accepted by the project team, the new build material bill of quantities provoked more discussion. This is considered to have arisen as the use of recycled materials in higher value construction products is a market that is continuing to develop. This discussion added value to the process through identifying potential barriers early in the process and highlighting additional opportunities to incorporate recycled materials into the temporary and permanent works. 4.1 Project Team Communication As members of the wider project team outwith the core group (that met at project team meetings) became more involved in the project, the clear client message relating to sustainability and the importance of material resource efficiency was perceived to be diluted. Further pressure was exerted on the lines of communication through members of the core team changing during the planning stages of the project. This dilution of the client message relating to material resource efficiency was observed through the preliminary pavement design report and the demolition enquiries described below. Upperton Road Viaduct, Leicester 6 4.1.1 Preliminary Pavement Design Report The preliminary pavement design report included a section discussing the opportunities for the use of recycled materials in both the temporary and permanent works. The inclusion of such a section in a technical design report was beneficial as the proposed use and specification of recycled materials in the works was transparent. This also demonstrated that the use of recycled materials had been considered at the outset of the detailed design process rather than after as an after thought. However, the pavement design report stated that although the Specification for Highway Works allowed the use of recycled aggregates in the unbound layers, the use of primary aggregates was recommended. This recommendation was offered without an explanation as to why the detailed design had drawn such a conclusion or why the crushed engineering brick was considered to be unlikely to be suitable for incorporation into the unbound layers, either as the primary constituent or part of a blended primary / recycled aggregate material. It is also interesting to note that the pavement design report failed to make reference to the ICE Demolition Protocol. This is considered in part to have arisen from the fact that the author of the pavement design report was not a member of the core project team and had not attended any of the meetings where the approach to material resource efficiency and the adoption of the ICE Demolition Protocol methodologies had been discussed. 4.1.2 Demolition Contract Enquiries The enquiries issued to potential demolition contractors to inform the target cost for the site works appeared to make no reference to the ICE Demolition Protocol or cross reference the outputs from the pre-demolition bill of quantities. Other issues that were not explicitly described within the enquiry document related to the: Percentage target in terms of material recovery from the demolition works; Material grading to which the materials were to be crushed in support of fulfilling the requirements of the WRAP Quality Protocol; Ownership of the material arising from the demolition works; and Client aspiration to achieve material resource efficiency. Whilst it is recognised that these issues could be picked up later prior to works starting on-site, the risk is that the opportunity will be lost to take the necessary decisions and set in place the appropriate mechanisms necessary to optimise material resource efficiency. Again, this is considered in part to have arisen from the fact that the author of the demolition enquiries was not a member of the core project team and had not attended any of the earlier meetings where the approach to material resource efficiency and the adoption of the ICE Demolition Protocol methodologies had been discussed. 4.2 Highways Agency A meeting was convened with selected members of the project team and a representative from the Highways Agency to further explore the opportunities to use recycled aggregates in the temporary and permanent works. This meeting sought to build upon the discussion triggered by the preliminary pavement design report and in particular to better understand where the design team and the Highways Agency, in their regulatory role viewed recycled aggregates on a par with primary aggregates. The case for the wider consideration of the use of recycled aggregates was presented to the design team and the Highways Agency. This was supported through reference to comparable case studies on the AggRegain website where the use of recycled aggregates in the pavement construction for trunk roads was referenced including examples where no adverse feedback had been recorded on the performance of the recycled aggregates over extended periods of time of heavy traffic loading. Despite this body of evidence and the Specification for Highway Works allowing the use of recycled aggregates, reservations were still held by the design team and the Highways Agency. These reservations in part were associated with: Past experience / rumour of recycled aggregates performing poorly; Recycled aggregates failing to meet specification requirements; Limited data on the long term performance of recycled aggregates in pavements; and Appropriateness of current test methods to determine the quality of recycled aggregates. Upperton Road Viaduct, Leicester 7 The technical content of the above discussion was a potential barrier to clients without a pavement design knowledge base to fully engage with the process. Where the decision to incorporate recycled aggregates into the temporary or permanent works is influenced by technical issues highlighted by the design team or regulator, this may be reflected in the client adopting a more conservative approach through accepting a presumption in favour of primary aggregates. The market development of recycled aggregates in Leicestershire may also have been stifled as a result of the numerous primary aggregate quarries in the local area depressing the price of primary aggregate such that the cost incentive to develop confidence in recycled aggregates observed in other geographic areas has been absent. The overall outcome from the meeting attended by the Highways Agency was positive, with a commitment from the design team and the Agency to reassess the wider potential to incorporate recycled aggregates into temporary and permanent works. The opportunity to gain local confidence in the performance of recycled aggregates was also recognised through the construction and operation of the temporary road over a period of time. This operational period would be prior to when final material selection decisions were required to be made for the permanent pavement. 5.0 Impact of Support to the Project Team The support to the project team funded by WRAP through the case study enabled direct support to be given to the client to keep the wider project team focused on sustainable construction outputs in terms of the recovery and reuse of recycled materials. This support is considered to of been particular benefit when potential barriers to the use of recycled aggregates were identified by stakeholders. A higher proportion of the time allocated for the case study was committed to supporting the stakeholder engagement process than envisaged at the out set of the case study. Support to this process was considered to be important to achieve the successful outcomes described above. A reduced level of time was committed to supplier development (e.g. structural concrete suppliers who have the ability to incorporate Recycled Concrete Aggregate into their supplied mixes) and increasing awareness of the opportunities offered by the Upperton Road Viaduct project with local material recycling and recovery companies. However, it is considered that the agreement of a challenging New Build Recovered Material Target will serve as a driver for Edmund Nuttall to take forward these discussions. 6.0 Conclusions The following conclusions are drawn to the Upperton Road Viaduct case study: The ICE Demolition Protocol provided a structured approach for the client to translate a commitment to the principles of sustainable development into practice through material resource efficiency. The ICE Demolition Protocol methodologies stimulated the early consideration of material resource issues such that potential barriers could be further explored and where possible overcome. Engagement with the team allowed the preliminary pavement design report to include a section discussing recycling opportunities. This allowed the client group to understand how the thinking of the design team was evolving and provided a trigger for the client group to re-engage with the design team - to reiterate the corporate commitment to the use where possible of recycled materials. The client decision to adopt the ICE Demolition Protocol methodologies and the importance placed on sustainable development was not effectively communicated out with the core project team. This meant that, on occasions, there was the potential for agreed approaches to be omitted. A number of influencers in the industry remain to be convinced that recycled aggregates can perform on a like for like basis with primary aggregates in the context of road pavements. A lack of knowledge and technical expertise may represent a barrier to certain clients making an informed decision on the use of recycled aggregates. 7.0 Recommendations The following recommendations arise from the Upperton Road Viaduct case study: Clients should give consideration to issuing explicit instructions to their appointed design teams to incorporate appropriate references and information to support the implementation of material resource efficiency. This could in part be achieved through the design team being required to complete as part of the key documentation the Tender & Contract Check List for Recycled & Secondary Aggregates as published by WRAP. A rolling programme of research and Continuing Professional Development should be maintained to address the concerns still held by influencers and designers with regards to the specification and use of recycled aggregates, particularly in higher value applications. The availability of case studies and good practice guidance on the AggRegain and Highway Agency web sites should continue to be publicised within trade journals, targeted mail shots and industry exhibitions. Upperton Road Viaduct, Leicester 8 Appendix 1: ICE Demolition Protocol The ICE Demolition Protocol was launched at the Institution of Civil Engineers in November 2003. Since then, the Protocol has been implemented on a range of projects and has been supported by WRAP (the Waste and Resources Action Programme) at different levels, including implementation support, the development of targeted guides and through its inclusion in the development of AggRegain’s on-line Demolition Module. The Protocol is applied as a project management tool which ensures that the potential to recover resources from demolition (and refurbishment) has been considered and implemented effectively. A key driver is the demand for procuring recovered (recycled/reclaimed) materials in the new build. Figure A2 below indicates how the supply and demand mechanisms work for both the new build and demolition. Figure A1. The ICE Demolition Protocol – launched in Nov 2003 Figure A2. The Supply & Demand Mechanisms Of Protocol Implementation The mechanisms described above are a key part of the resource efficiency process, and are driven by the Protocol methodologies. The specification of recovered materials related to new build projects is key, without which there will be little demand/incentive for recovering material effectively from demolition, refurbishment or excavation projects. Another vital part of its implementation is that it should be applied on the basis of options being identified which are either cost neutral or lower cost. Upperton Road Viaduct, Leicester 9 Appendix 2: New Build Bill of Quantities The Bill of Quantities data was extracted from the bespoke contract pricing package operated by Edmund Nuttall into Microsoft Excel to allow manipulation to calculate the New Build Bill of Quantities. During this data transfer process item descriptions were truncated and therefore have not been documented in full below. Item descriptions highlighted in GREEN represent existing opportunities to utilise recycled materials in the new build. Item descriptions highlighted in YELLOW represent emerging opportunities at the time of writing. TEMPORARY DIVERSION ROAD Item Description Total Material Weight (tonnes) Coarse Aggregate weight (tonnes) Recycled Material Allowed % New Build Recovered Material Potential New Build Recovered Material Index % 350 m 6 no 15 no 29.1 6.2 0.2 11.62 2.49 0.07 20.0% 20.0% 20.0% 2.32 0.50 0.01 8% 8% 8% 90 m 2 no 5 no 1.0 0.40 20.0% 0.08 8% 550.8 550.80 100.0% 550.80 100% Quantity Unit 6/1 Ch 0m - 50m Series 400--Site Clearance Site cleanace to temporary 0 ha 6/2 Series 300--Fencing(Tempary Site Hoarding 260 m 6/3 Series 400--Road Restraint Barrier 160 m 6/7 6/8 6/9 Series 500--Temporary drainage Western side 300mm diameter pipe Manholes 1350dia Gullies complete incl Eastern side 300mm diameter pipe Manholes 1350dia Gullies complete incl 6/10 6/11 6/12 6/13 6/14 Series 600-Earthworks Excavation (40*15.3*.9*0.5) Dispose of material U2 Compaction of Formation Capping material Compaction of cappping layer 276 m3 276 m3 612 m2 367.2 m3 612 m2 6/15 6/16 6/17 6/18 6/19 Series 700--Pavements Sub -base 150mm thick Pavement details ditto ditto Tack Coat to above 91.8 m3 612 m2 612 m2 612 m2 612 m2 137.7 137.70 100.0% 137.70 100% 6/20 6/21 Series 1100--Kerbs, footways 10*5 Kerbs Edgings 140 m 140 m 10.8 5.4 4.34 2.17 100.0% 100.0% 4.34 2.17 40% 40% 6/22 6/23 Footpaths Fill to footpths (Re-cycled Footpath Surfacing (two 52.5 m3 420 m2 78.8 100.8 78.75 45.36 100.0% 33.0% 78.75 14.97 100% 15% 6/24 Ch50-180m Site cleanace 0.33 ha 6/25 Series 400--Site Clearance Site cleanace 0.33 ha 6/26 Series 300--Fencing(Tempary Site Hoarding 310 m 6/27 Series 400--Road Restraint Barrier 260 m 6/28 Series 500--Temporary drainage Included 6/4 6/5 6/6 0 Upperton Road Viaduct, Leicester 10 6/29 6/30 6/31 6/32 6/33 6/34 6/35 Series 600-Earthworks Excavation (95*15.3*.9) Dispose of material U2 Compaction of Formation Filling (13m*15.3m*.95m) Compaction of fill area Capping material Compaction of cappping layer 1380 m3 1380 m3 1453.5 m2 188.96 m3 198.9 m2 872.1 m3 1453.5 m2 6/36 6/37 6/38 6/39 6/40 Series 700--Pavements Sub -base 150mm thick Pavement details ditto ditto Tack Coat to above 6/41 6/42 Series 1100--Kerbs, footways 10*5 Kerbs Edgings 6/43 6/44 283.4 283.44 100.0% 283.44 100% 1308.2 1,308.15 100.0% 1,308.15 100% 218.03 m3 693.5 m2 693.5 m2 693.5 m2 693.5 m2 327.0 327.05 100.0% 327.05 100% 210 m 210 m 16.3 8.1 6.50 3.25 100.0% 100.0% 6.50 3.25 40% 40% Footpaths Fill to footpths (Re-cycled Footpath Surfacing (two 78.75 m3 630 m2 118.1 151.2 118.13 68.04 100.0% 33.0% 118.13 22.45 100% 15% 6/45 Ch 200m - 240m Series 400--Site Clearance Site clearance 0.08 ha 6/46 Series 300--Fencing(Tempary Site Hoarding 170 m 6/47 Series 400--Road Restraint Barrier 80 m 6/48 Series 500--Temporary drainage Included 0 6/49 6/50 6/51 6/52 6/53 Series 600-Earthworks Excavation (48*15.3*.95) Dispose of material U2 Compaction of Formation Capping material Compaction of cappping layer 698 m3 698 m3 734.4 m2 440.64 m3 734.4 m2 661.0 660.96 100.0% 660.96 100% 6/54 6/55 6/56 6/57 6/58 Series 700--Pavements Sub -base 150mm thick Pavement details ditto ditto Tack Coat to above 218.03 m3 350.4 m2 350.4 m2 350.4 m2 350.4 m2 327.0 327.05 100.0% 327.05 100% 6/59 6/60 Series 1100--Kerbs, footways 10*5 Kerbs Edgings 96 m 96 m 7.4 3.7 2.97 1.49 100.0% 100.0% 2.97 1.49 40% 40% 6/61 6/62 Footpaths Fill to footpths (Re-cycled Footpath Surfacing (two 36 m3 96 m2 54.0 23.0 54.00 10.37 100.0% 33.0% 54.00 3.42 100% 15% 6/63 Ch 265m- 378m Series 400--Site Clearance Site clearance (17.65*167*.95) 0.28 ha Upperton Road Viaduct, Leicester 11 6/64 Series 300--Fencing(Tempary Site Hoarding 419 m 6/65 Series 400--Road Restraint Barrier 334 m 6/66 Series 500--Temporary drainage Included 0 6/67 6/68 6/69 6/70 6/71 6/72 6/73 Series 600-Earthworks Excavation (125*1765*.9) Dispose of material U2 Compaction of Formation Excavation of embankment Disposal of material (clean) Capping material Compaction of cappping layer 1986 m3 1986 m3 2207 m2 288 m3 288 m3 1325 m3 2207 m2 6/74 6/75 6/76 6/77 6/78 6/79 Series 700--Pavements Sub -base 150mm thick Pavement details ditto ditto Anti-skid surfacing at Tack Coat to above 6/80 6/81 Series 1100--Kerbs, footways 10*5 Kerbs Edgings 6/82 6/83 Footpaths Fill to footpths (Re-cycled Footpath Surfacing (two 6/84 Ch180m - 200m (under viaduct) Series 400--Site Clearance Site cleanace (60*17m) 0 ha 6/85 Series 300--Fencing(Tempary Site Hoarding 230 m 6/86 Series 400--Road Restraint Barrier 140 m 6/87 Series 500--Temporary drainage Included 0 6/88 6/89 6/90 6/91 6/92 Series 600-Earthworks (Allow Excavation (60*15.3*.9) Dispose of material U2 Compaction of Formation Capping material Compaction of cappping layer 1239.3 m3 1239.3 m3 1377 m2 826.2 m3 1377 m2 6/93 6/94 6/95 6/96 6/97 Series 700--Pavements Sub -base 150mm thick Pavement details ditto ditto Tack Coat to above 826.2 m3 657 m2 657 m2 657 m2 657 m2 1987.5 1,987.50 100.0% 1,987.50 100% 218.03 m3 1163 m2 1163 m2 1163 m2 350 m2 1163 m2 327.0 327.05 100.0% 327.05 100% 250 m 250 m 19.4 9.7 7.74 3.87 100.0% 100.0% 7.74 3.87 40% 40% 93.75 m3 750 m2 140.6 140.63 100.0% 140.63 100% 1239.3 1,239.30 100.0% 1,239.30 100% 1239.3 1,239.30 100.0% 1,239.30 100% Upperton Road Viaduct, Leicester 12 6/98 6/99 Series 1100--Kerbs, footways 10*5 Kerbs Edgings Footpaths 6/100 Fill to footpths (Re-cycled 6/101 Footpath Surfacing (two 263 m 150 m 20.4 5.8 8.14 2.32 100.0% 100.0% 8.14 2.32 40% 40% 18.75 m3 450 m2 28.1 108.0 28.13 48.60 100.0% 33.0% 28.13 16.04 100% 15% 196.2 196.20 100.0% 196.20 100% Connection to CHP Series 300--Fencing(Tempary 6/102 Site Hoarding 110 m Series 400--Road Restraint 6/103 Barrier 40 m Series 500--Temporary drainage 6/104 Included 0 Series 600-Earthworks 6/106 6/107 6/108 6/109 Dispose of material U2 Compaction of Formation Capping material Compaction of cappping layer 196.2 m3 218 m2 130.8 m3 218 m2 6/110 6/111 6/112 6/113 6/114 Series 700--Pavements Sub -base 150mm thick Pavement details ditto ditto Tack Coat to above 21.9 m3 146 m2 146 m2 146 m2 146 m2 32.9 32.85 100.0% 32.85 100% Series 1100--Kerbs, footways 6/115 10*5 Kerbs 6/116 Edgings 47 m 40 m 3.6 1.5 1.46 0.62 100.0% 100.0% 1.46 0.62 40% 40% Footpaths 6/117 Fill to footpths (Re-cycled 6/118 Footpath Surfacing (two 9 m3 72 m2 Connection to Contractors Series 300--Fencing(Tempary 6/119 Site Hoarding 60 m Series 400--Road Restraint 6/120 Barrier 60 m Series 500--Temporary drainage 6/121 Included 0 270.0 270.00 100.0% 270.00 100% 6/122 6/123 6/124 6/125 6/126 Series 600-Earthworks Excavation (30*10*.9) Dispose of material U2 Compaction of Formatiom Capping material Compaction of cappping layer 270 m3 270 m3 300 m2 180 m3 1453.5 m2 Upperton Road Viaduct, Leicester 13 6/127 6/128 6/129 6/130 6/131 Series 700--Pavements Sub -base 150mm thick Pavement details ditto ditto Tack Coat to above Series 1100--Kerbs, footways 6/132 10*5 Kerbs 6/133 Edgings Footpaths 6/134 Fill to footpths (Re-cycled 6/135 Footpath Surfacing (two 45 m3 219 m2 219 m2 219 m2 219 m2 67.5 67.50 100.0% 67.50 100% 60 m 30 m 4.6 1.2 1.86 0.46 100.0% 100.0% 1.86 0.46 40% 40% 6.75 m3 54 m2 10.1 13.0 10.13 5.83 100.0% 33.0% 10.13 1.92 100% 15% 9,935.02 9,624.56 9,493.50 96% FOR ALL AREAS ABOVE Series 1200 Road Markings and 6/136 Road Markings 6/137 Traffic Signs including 1 item 10 no Series 1200 6/138 Toucan Crossing 6/139 Anti-skid to crossing 1 item 80 m2 Series 1300 Street lighting 6/140 Supply and install lighting 21 no Drainage attenuation to temp West Side 6/141 say Attenuation Volume 125 m3 Tactile paving 6/142 Tactile paving 57 m2 Noise Fencing TOTAL AGGREGATES Upperton Road Viaduct, Leicester 14 TEMPORARY BRIDGE CONSTRUCTION Item Description Quantity Unit 7/1 7/2 7/3 7/4 7/5 7/6 7/7 7/8 7/9 7/10 7/11 7/12 7/13 7/14 Foundations for temp bridge-Excavate for foundations Disposal of material Piling platform 300mm thick Mobilise piling contractor Piling to bases 900mm dia Break down tops of piles Blinding to base Concrete to base Rebar to base @ 130Kg/cum Formwork to bases Finishing to bearing shelf Filling with capping material Run-on slabs 5m*14m*.4m-Re-bar @150kg/cum 7/15 Supply and erect bridge Temporary Bridge 45m span Ha & 1 item 7/16 Remove Steel Bridge Credit for sale of bridge 1 item 7/17 Remove Bridge foundations Break up, remove off site old 7/18 Drainage Gully at end of bridge 4 no 7/19 Parapets to bridge Supply and fit parapets 1 incl 7/20 Surfacing to bridge Anti-skid surfacing on steel 1 incl 7/21 Lighting to bridge Lighting in Road Items Page 6- 1 incl TOTAL 288 m3 250 m3 96 m3 1 item 28 no 28 no 4.5 m3 142 m3 18.46 tonnes 42 sqm 56 m2 68 m3 56 m3 8.4 tonnes Total Material Weight (tonnes) Coarse Aggregate Weight (tonnes) Recycled Material Allowed % New Build Recovered Material Potential New Build Recovered Material Index % 144.0 144.00 100.0% 144.00 100.0% 10.8 340.8 4.32 136.32 100.0% 20.0% 4.32 27.264 40.0% 8.0% 102.0 102.00 100.0% 102.00 100.0% 0.8 0.32 20.0% 0.06 8.0% 598.4 386.96 277.648 46.4% 198 m3 Upperton Road Viaduct, Leicester 15 NEW ROAD Item Description Quantity Unit Total Material Weight (tonnes) Coarse Aggregate weight (tonnes) Recovered Material Allowed % New Build Recovered Material Potential New Build Recovered Material Index % 8/1 8/2 8/3 Series 500 Drainage Western Side 300mm diameter pipe Manholes 1350dia Gullies complete incl 300 m 5 no 15 no 24.9 5.2 0.2 9.96 2.07 0.07 20.0% 20.0% 20.0% 1.99 0.41 0.01 8.0% 8.0% 8.0% 8/4 8/5 8/6 Eastern side 300mm diameter pipe Manholes 1350dia Gullies complete incl 50 m 2 no 5 no 4.2 2.1 0.1 1.66 0.83 0.02 20.0% 20.0% 20.0% 0.33 0.17 0.00 8.0% 8.0% 8.0% 2430.0 2,430.00 100.0% 2,430.00 100.0% Series 600 Excavation 8/9 Fill Fill to west area 1620 m3 8/10 Disposal off site Cart to tip non-hazardous 6680 m3 8/11 Prepare formation Prepare formation and compact 7400 m2 8/12 Capping Capping to new road 350mm 1190 m3 1785.0 1,785.00 100.0% 1,785.00 100.0% 8/13 Series 700 Sub-base to road 150mm thick 2400 m2 3600.0 3,600.00 100.0% 3,600.00 100.0% 8/14 8/15 8/16 8/17 Surfacing to new road 35mm TSCS 60mm DBMBinderC 175mm DBMBC Additional cost for higher PSV 2400 m2 2400 m2 2400 m2 2400 m2 20.2 34.6 100.8 9.07 15.55 45.36 33.0% 33.0% 33.0% 2.99 5.13 14.97 14.9% 14.9% 14.9% 8/18 8/19 8/20 8/21 Cold Milling to tie-ins Cold milling to western side Cold Milling to Eastern side Additional wearing course to Anti-skid surfacing 1 day 2 day 620 m2 150 m2 8/22 Series 1100 Kerbs 250*125 kebs 654 m 49 19.62 100.0% 19.62 40.0% 8/23 Surfacing to footpaths Sub base 100mm 1000 m2 150 150.00 100.0% 150.00 100.0% 8/24 8/25 8/26 8/27 Surfacing slabs @ say £20sqm Marshalls Courdroy slabs Channel drainage Seperation kerbs Tactile paving 1000 m2 540 m 450 m 57 m2 240 81 96.00 81.00 100.0% 100.0% 96 81 40.0% 100.0% 8/28 8/29 Series 1200 Traffic Signs and Large signs say Road markings 6 no 1 item Upperton Road Viaduct, Leicester 16 8/30 8/31 Traffic Signals Remove and reinstall tempoary New traffic signals to 1 item 1 item 8/32 Series 1300 Road Lighting Street lighting 10m posts 1 item 8/33 8/34 8/35 Series 1400 Ducting and Ducts 100mm say 4 way each Ducts 150mm say 2 way each Chambers for above 8/36 Series 1700--Concrete See Section 10 0 8/37 8/38 8/39 8/40 8/41 Series 2400--brickwork Excavation to footings Disposal of material Foundation Concrete in Mesh in footings Formwork to footings F1 150 m3 150 m3 77 m3 201 m2 192 m2 8/42 8/43 8/44 8/45 8/46 8/47 Brickwork Brickwork 440mm thick in Brickwork 440mm thick in Brickwork 440mm thick faced Brickwork 440mm thick faced Brickwork 440mm thick faced Anti- grafitti coating 8/48 8/49 173 173 69.12 69.12 100.0% 100.0% 69.12 69.12 40.0% 40.0% 185 73.92 20.0% 14.784 8.0% 73 m2 17 m2 13 m2 94 m2 21 m2 128 m2 77 18 14 99 22 77.09 17.95 13.73 99.26 22.18 100.0% 100.0% 100.0% 100.0% 100.0% 77.088 17.952 13.728 99.264 22.176 100.0% 100.0% 100.0% 100.0% 100.0% Copings Copings in reconstituted stone Copings in reconstituted stone 273 m 57 m 41 9 40.95 8.55 100.0% 100.0% 40.95 8.55 100.0% 100.0% 8/50 8/51 8/52 8/53 8/54 Railings Railings as drawings 600mm Railings as drawings 600mm Railings as drawings 1200mm Concrete footings to 1200mmm E.O. forArchitectual features 200 m 21 m 38 m 38 m 16 no 9/1 9/2 9/3 9/4 9/5 9/6 9/7 9/8 9/9 9/10 Series 3000 Landscaping Topsoil Ground Preparation and Seeding and Turfing Planting of Trees -- Acer Grasscrete surfacing Pedestrian cycleways off Removalble bollards Fixed Bollards Construct steps to footpaths load and spread railway 1050 m3 7000 m2 7000 m2 48 no 72 m2 300 m 9 no 16 no 3 no 500 m3 210 210.00 100.0% 210.00 100.0% 9,547 8,948 8,830 92.5% TOTAL 720 m 720 m 16 Upperton Road Viaduct, Leicester 17 NEW BRIDGE Item Description 10/1 10/2 10/3 10/4 10/5 10/6 10/7 10/8 10/9 10/10 10/11 10/12 10/13 10/14 10/15 10/16 10/17 10/18 10/19 10/20 10/21 10/22 10/23 10/24 Abutments--size 26m*5.4m*1m Excavation for abutment in old Piling plantform 300mm thick Piles to base 900mm dia 8m Mobilise Pile to wing walls 900mm dia Break off pile tops Blinding to bases 75mm thick concrete to pile caps Rebar to pile caps @ 100Kg/cum Formwork to pile caps Concrete to walls to abutment Rebar to abutment walls Formwork to abutment walls Concrete to wing walls --66m Rebar for walls @150Kg/cum Formwork for wing walls Concrete to capping beam Rebar to capping beam @150Kg/ Formwork to capping beamFormwork soffit Finishing to bearing shelves Works to ballast wall Anti-graffitti coating to Silane treatment 5000 m3 84 m3 28 no 1 no 12 no 40 no 25.92 m3 280.8 m3 28.1 tonnes 125.6 m2 286 m3 37.18 tonne 297 m2 146 m3 21.9 tonnes 363 m2 124 m3 18.6 tonnes 248 m2 25 m2 26 m2 1 item 197 m2 394.5 m2 10/25 Infilling to abutments Filling of material to 4300 m3 10/26 10/27 10/28 10/29 10/30 10/31 10/32 10/33 10/34 10/35 10/36 10/37 10/38 10/39 10/40 10/41 Steel Bridge Steeelwork to bridge Bearings Omnia formwork to soffit Soffit shutter and support to Rebar to deck (150Kg/cum) Concrete to deck incl upstands Formwork for upstand Wateproofing to deck Expansion joint Hot poured joint -fixed end Parapet P2 Red sand asphalt 25mm -Machine Kerb drainage Drainage sliding joint Fill to footpaths--lightweight Surfacing-road--2 course 252 tonnes 12 no 638 m2 58 m 15.3 tonnes 101.5 m3 70 m 638 m2 23 m 23 m 58 m 630 m2 58 m 1 item 26 m3 377 m2 10/42 10/43 10/44 Surfacing -footpaths Marshalls Courdroy slabs Channel drainage Seperation kerbs TOTAL Quantity Unit 174 m2 58 m 58 m Total Material Weight (tonnes) Coarse Aggregate weight (tonnes) Recovered Material Allowed % New Build Recovered Material Potential New Build Recovered Material Index % 126.0 126.00 100.00% 126.00 100.00% 62.208 673.92 24.8832 269.568 100.0% 20.0% 24.8832 53.9136 40.0% 8.0% 686.4 274.56 20.0% 54.912 8.0% 350.4 140.16 20.0% 28.032 8.0% 298 119 20.00% 23.808 8.00% 6450.0 6,450.00 100.00% 6,450.00 100.00% 244 110 33.00% 36.28 14.85% 42 16.70 100.00% 16.704 40.00% 4 2 100.00% 1.74 40.00% 8,937 7,533 6,816 76.27% Upperton Road Viaduct, Leicester 18 RETAINING WALLS Unit Coarse Aggregate weight (tonnes) Recovered Material Allowed % New Build Recovered Material Potential New Build Recovered Material Index % Item Description 11/1 11/2 11/3 Excavation Excavation in hard material Temporary supports to 342 m3 16 m3 174 m2 11/4 11/5 11/6 11/7 11/8 11/9 11/10 11/11 11/12 11/13 11/14 11/15 Concrete Works Blinding Concrete Base concrete 40N Rebar to base Concrete to walls Rebar to walls Formwork F1 Formwork F3 Finishes to concrete Joints Waterproofing to walls and Waterproofing to walls-vert Finish to steps--ant-slip 18 m3 96 m3 14.4 tonnes 64 m3 9.6 tonnes 340 m2 64 m2 159 m2 150 m 272 m2 145 m2 1 item 43.2 230.4 17.28 92.16 100.0% 20.0% 17.28 18.432 40.0% 8.0% 153.6 61.44 20.0% 12.288 8.0% 11/16 11/17 11/18 11/19 Brickwork Brickwork single skin 1/2 Brickwork 440mm faced both Copings Anti Grafitti 106 m2 27 m2 13 m 133 m2 25 29 25.44 28.51 100.0% 100.0% 25.44 28.512 100.0% 100.0% 11/20 Filling Filling 6N material 71 m3 106.5 106.50 100.00% 106.50 100.00% 11/21 11/22 11/23 Railings Railings 1200mm high straight Railings 1200mm inclined down Handrail 106 m 6 m 15 m 588 331 208 35.47% TOTAL Quantity Total Material Weight (tonnes) Upperton Road Viaduct, Leicester 19 Written by: David Hay & Brian Menzies Published by Waste & Resources Action Programme The Old Academy 21 Horse Fair Banbury, Oxon OX16 0AH Tel: 01295 819 900 Fax: 01295 819 911 E-mail: info@wrap.org.uk Helpline freephone 0808 100 2040 www.wrap.org.uk
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )