BRIEFINGS Multi Engine (+memory checklists)
Memorize the After-take-off Memory Items and Finals B4 Landing (Shorts) Check List
Note;
Items within “ ” are to be enunciated out loud when executing the procedure.
Where …. is shown. Insert LEFT or RIGHT.
Before Take-off Briefing
Threats
Normal Take Off Briefing; RWY Vmc, Vr, Vy(se)
Emergency Briefing; RTO, B4/After lift-off, Engine Failure Procedures, Terrain, First turn.
Departure Briefing.
VFR Departure Briefings may be limited to the Departure HDG and Intentions after the First turn
Emergency Briefing is divided into 4 Parts.
(It may be done in Portuguese)
1. On the Ground I will reject for ANYTHING.
Manoeuvre will be “Reject” Throttles Close, Maintain Directional Control and Stop. Contact ATC.
2. Engine failure Airborne with Gear still selected Down
“Reject” Throttles Close, PITCH & FLAPS as Required, Land straight ahead Contact ATC.
In case of over-run Fuel Selectors OFF, Ignitions OFF
(NB The Selection of Gear-up is the GO Decision)
3. Airborne Gear selected UP;
“Continue” Pitch for Blue line, Maintain Directional Control,
“All Forward, Gear-up, Flaps-up, Identify failed…. Confirm…. Feather….” Continue Strait Ahead
Highest terrain is …. First Turn is ….
4. Any other Emergency as per Checklist
Take off Review (Lining up on RWY)
Runway designation and condition.
First HDG,
First Turn ….
First Altitude ….
In case of Engine Failure as briefed
After Take-off Check List Memory Items.
Gear up
Flaps up
Lights off
Pumps Off (One at a time)
Power Set
The hard copy check list should only be read at least 1000´AGL and when it poses no risk of
distraction
Approach Briefing; Instrument Flight
Generalities; Acft Stat, Wx, Notam, Fuel, Alternate, Threats etc.
Arrival
Approach
The pilot flying should brief the Arrival/Approach and physically indicating Frequencies, CRSs QNH
SET, Legs and Altitudes to be flown etc, in a clear, concise and fluid manner without interruptions so
that the Pilot Not Flying can accompany him.
i.e. "Nav 1, PRT 114.4 SET and IDENT" "HSI Final Approach CRS xxxº SET"
VOR2, CRS xxxº SET "ADF xxx SET and IDENT" "Next Altitude xxxx' QNHxxxx SET”
In the case of GPS, "Legs SET, CRS’s & DISTANCES Checked"
Taxi-in
“Descent Check List”
Approach Briefing; Visual Flight
After the Generalities; Acft Stat, Wx, Notam, Fuel, Alternate, Threats etc.
Intentions, Taxi-in
“Descent Check List”
Before Landing Check List Memory Items
“Fuel (selectors/pumps) Gear Down, Three Greens, Flaps xxº, Prop’s FFWD,
AFM / QRH
Take Time to Re-read the Procedures and Emergencies in the AFM and the QRH aboard the aircraft.
Be familiar with which QRH pages are most relevant.
Have your feet firmly planted on the ground and KNOW the procedures and UNDERSTAND them, it
will stand you in good stead during your career in any aircraft.
Single Pilot Operations, means there is no one to read a checklist for you. Use the Auto pilot when
possible
Emergencies must be dealt with on a Memory Item basis.
Hard Copy Checklists should only be used in Non Critical situations when Flight Safety will not be
compromised
Not only the Engine Failure and Engine Fire recall items may be performed by memory but also the
Securing Dead Engine. As with any emergency
Control of Flight Path is ALWAYS Paramount
In the case of Engine Failure, Pitch & the Application of appropriate power,
checking configuration,
Identification & Confirmation of the INOP engine
and Feather*
Should follow in close sequence but without rush, practice at home.
*Feather immediately. Unless, making troubleshooting steps in order to restore power.
This should only be undertaken if at a safe altitude and if you are comfortable with the situation
Securing the Dead Engine Procedure should only be made at a safe altitude when flight path is not
compromised and free of distraction. Eg in Cruise or in a Holding Pattern
After it is completed consideration should be given to the following and announced out loud;
“Services Lost;
1 Engine
1 Alternator (reduce load)
1 Bus – Cross Tie
Fuel Consideration;
Fuel available, time and distance to DEST or ALT. Cross-feed.
Performance;
SE ceiling
AFTER COMPLTION READ THE QRH TO CHECK THE FULL PROCEDURE HAS BEEN COMPLETED