3. Project Management Plan 3.1 Work Breakdown Structure (WBS) 3.1.1 Overview and Purpose The Work Breakdown Structure (WBS) is a foundational project management tool that hierarchically decomposes the entire scope of the AIDriven Smart Waste Management System into discrete, manageable units of work known as work packages. In accordance with the Project Management Institute's PMBOK Guide (7th ed., 2021), the WBS serves as the definitive scope baseline — establishing a structured framework from which all other project management artefacts, including the project schedule, resource plan, budget, and risk register, are derived. For this project, the WBS applies the 100% Rule, which mandates that the sum of all work at each level completely represents the work of its parent element, with no omissions and no overlaps (PMI, 2021). This ensures that every activity required to deliver the smart waste management system — from initial sensor procurement through to formal project closure — is accounted for, assigned an owner, estimated for duration, and linked to a specific budget allocation. 3.1.2 Structure and Design Principles The WBS for this project is organised into three hierarchical levels. Level 1 represents the project as a whole — the AI-Driven Smart Waste Management System for University Campuses. Level 2 comprises seven major phases that reflect the project lifecycle from initiation through to closure. Level 3 contains 37 individual work packages, each representing a distinct deliverable that is assignable to a named role, estimable in duration, and independently trackable for completion. The WBS adopts a deliverable-oriented decomposition approach, meaning that each work package is expressed as a noun — a product or outcome to be produced — rather than a task or action. This approach, recommended by Haugan (2002) and aligned with PMI best practice, reduces ambiguity, supports clearer accountability, and facilitates more accurate cost and time estimation. For example, rather than listing 'train the AI model' as a task, the work package is defined as 'Waste Prediction ML Model' — the trained, validated, and documented model ready for integration. Key design principles applied to this WBS 100% Rule: all seven phases collectively capture 100% of the project scope — nothing is excluded or double-counted. Mutual exclusivity: no work package overlaps with another; each deliverable has a single, clearly defined owner. AI-Driven Smart Waste Management System — University Campus Work Breakdown Structure (WBS) 8/80 Rule: each work package is sized between 8 and 80 hours (approximately 1–10 working days), ensuring tasks are trackable without being over-granular. Traceability: every work package ID (e.g. WP 1.4.3) is cross-referenced in the project schedule (Gantt chart), resource plan, budget, and risk register. Deliverable-oriented: all work packages are expressed as nouns representing outputs, not verbs representing activities. 3.1.3 Phase Summary The seven phases of the WBS reflect the natural lifecycle of a technology deployment project involving both hardware (IoT sensors) and software (AI platform) components. The rationale for separating Phase 1.3 (IoT Hardware Deployment) from Phase 1.4 (AI and Software Development) is deliberate: these two workstreams have distinct resource requirements, different risk profiles, and can proceed in parallel once the design phase is complete. This parallel execution strategy, discussed further in Section 3.2 (Project Schedule), reduces the overall project timeline from an estimated 16 months to 12 months. • • • • • • • Phase 1.1 — Project Initiation (5 WPs): establishes the governance foundation including the project charter, stakeholder register, campus site survey, funding application, and procurement plan. Phase 1.2 — Requirements and Design (6 WPs): defines all functional, technical, and architectural specifications for the IoT network, AI models, cloud platform, and user interfaces prior to any development or procurement. Phase 1.3 — IoT Hardware Deployment (5 WPs): covers sensor procurement, LoRaWAN network installation, physical bin sensor fitting, connectivity verification, and maintenance procedure documentation. Phase 1.4 — AI and Software Development (7 WPs): the most resource-intensive phase, encompassing cloud pipeline construction, training data collection, ML model development, route optimisation engine, dashboard and mobile app build, and reporting module. Phase 1.5 — Integration and Testing (5 WPs): validates end-to-end system performance including AI prediction accuracy (≥85% target), route optimisation benchmarking, user acceptance testing, and independent security audit. Phase 1.6 — Pilot and Deployment (5 WPs): executes a controlled 4-week live pilot in two campus zones before full campus rollout, with formal evaluation against defined KPIs. Phase 1.7 — Project Closure (4 WPs): ensures formal handover, funder reporting, lessons learned documentation, and sponsor sign-off, consistent with PMBOK closure process group requirements. 3.1.4 WBS Table AI-Driven Smart Waste Management System — University Campus Work Breakdown Structure (WBS) Table 3.1 below presents the complete Work Breakdown Structure for the AI-Driven Smart Waste Management System, organised by phase and work package. For each work package, the table specifies the assigned owner, estimated duration, and allocated budget. The total project budget across all 37 work packages is S$462,000, which remains within the S$1,000,000 funding ceiling established by the funding agency. Table 3.1: Work Breakdown Structure — AI-Driven Smart Waste Management System (University Campus) WP ID Work Package Deliverable / Output Owner Duration Budget (S$) 1.1 Phase 1.1 — Project Initiation 1.1.1 Project charter Approved charter documenting scope, objectives, success criteria, and sponsor sign-off Project Manager 5 days 2,000 1.1.2 Stakeholder register Documented register of all stakeholders: Facilities Mgmt, IT, campus admin, and cleaning staff Project Manager 3 days 1,000 1.1.3 Campus site survey Mapped inventory of all bin locations, waste volumes, waste types, and existing collection routes Operations Lead 7 days 3,500 1.1.4 Funding grant application Completed and submitted funding proposal to university / external funding agency PM + Finance 10 days 2,000 1.1.5 Procurement plan Vendor shortlist and procurement strategy for IoT sensors, cloud platform, and AI development Procurement 5 days 1,500 1.2 Phase 1.2 — Requirements and Design 1.2.1 Functional requirements document Business Analyst 8 days 4,000 Specifications for bin fill alerts, route optimisation, analytics AI-Driven Smart Waste Management System — University Campus Work Breakdown Structure (WBS) WP ID Work Package Deliverable / Output Owner Duration Budget (S$) dashboard, and reporting module 1.2.2 IoT sensor specification Technical specification for ultrasonic fill-level sensors, LoRaWAN connectivity, and power supply Hardware Engineer 6 days 3,000 1.2.3 AI model architecture design Designed ML pipeline: prediction model (LSTM/XGBoost), VRP route optimiser, and training data plan Data Scientist 8 days 5,000 1.2.4 Cloud platform architecture Architecture blueprint: sensor ingestion → cloud storage → ML inference → dashboard (AWS/Azure) Cloud Architect 7 days 5,500 1.2.5 Dashboard UI/UX wireframes Interactive wireframes for facilities operations dashboard and cleaner mobile app interface UI Designer 7 days 4,000 1.2.6 Data privacy and ethics review PDPA compliance report confirming sensors capture no personal data; ethics clearance document Legal / DPO 4 days 2,000 1.3 Phase 1.3 — IoT Hardware Deployment 1.3.1 Sensor procurement Purchased and delivered ultrasonic filllevel sensors, weatherproof enclosures, and LoRaWAN gateways Procurement 14 days 120,000 1.3.2 LoRaWAN gateway installation Campus-wide LoRaWAN network installed and configured Hardware Engineer 10 days 35,000 AI-Driven Smart Waste Management System — University Campus Work Breakdown Structure (WBS) WP ID Work Package Deliverable / Output Owner Duration Budget (S$) to achieve full bin zone signal coverage 1.3.3 Smart bin sensor installation Ultrasonic sensors fitted into all campus bins; device IDs and transmission intervals configured Technicians 12 days 18,000 1.3.4 Sensor connectivity testing Verified data transmission from all sensors; dead zones identified and resolved Hardware Engineer 7 days 5,000 1.3.5 Hardware maintenance SOP Standard operating procedure for battery replacement, fault detection, and vendor SLA management Operations Lead 4 days 2,000 1.4 Phase 1.4 — AI and Software Development 1.4.1 Cloud data pipeline build Real-time ingestion pipeline: LoRaWAN → AWS IoT Core → cloud time-series storage Cloud Developer 20 days 28,000 1.4.2 Historical data collection and labelling 4–6 weeks of baseline sensor data collected, cleaned, and labelled by bin type and location Data Scientist 30 days 8,000 1.4.3 Waste prediction ML model Trained and validated LSTM/XGBoost model predicting bin fill levels by location and time of day Data Scientist 25 days 18,000 1.4.4 Route optimisation engine VRP algorithm dynamically prioritising bins above 80% fill threshold; tested on simulated routes AI Developer 20 days 16,000 AI-Driven Smart Waste Management System — University Campus Work Breakdown Structure (WBS) WP ID Work Package Deliverable / Output Owner Duration Budget (S$) 1.4.5 Operations dashboard development Live web dashboard: campus bin heat map, fill-level alerts, AI route suggestions, collection log Frontend Developer 22 days 15,000 1.4.6 Mobile alert app for cleaners Android/iOS app for collection staff: optimised route map, bin alerts, and task completion logging App Developer 18 days 14,000 1.4.7 Reporting and analytics module Automated weekly/monthly reports: waste volume trends, fuel savings, and CO₂ reduction metrics Backend Developer 12 days 9,000 1.5 Phase 1.5 — Integration and Testing 1.5.1 End-to-end system integration Full system connected: sensors → cloud pipeline → ML model → dashboard → mobile app Tech Lead 10 days 8,000 1.5.2 AI model accuracy testing Validated prediction accuracy ≥85%; model retrained if accuracy falls below acceptance threshold Data Scientist 10 days 7,000 1.5.3 Route optimisation validation AI routes compared against fixed schedule; distance and time reduction quantified AI Dev + Ops 7 days 5,000 1.5.4 User acceptance testing (UAT) Facilities staff and cleaners complete UAT; all critical issues resolved before pilot launch QA + PM 8 days 4,000 AI-Driven Smart Waste Management System — University Campus Work Breakdown Structure (WBS) WP ID Work Package Deliverable / Output Owner Duration Budget (S$) External Vendor 7 days 12,000 1.5.5 Security and penetration test 1.6 Phase 1.6 — Pilot and Deployment 1.6.1 Pilot zone selection Documented selection of 2 high-traffic pilot zones (canteen block and library precinct) PM + Facilities 3 days 1,000 1.6.2 Staff training programme Facilities supervisors trained on dashboard; cleaners trained on mobile app and AIguided routes Operations Lead 5 days 5,000 1.6.3 4-week live pilot run System operating in pilot zones; log of actual vs predicted fill levels, route times, and overflows Ops Lead + PM 28 days 8,000 1.6.4 Pilot evaluation report KPI report: fuel saved, collection trips reduced, overflow incidents, and user satisfaction score PM + Data Scientist 5 days 3,000 1.6.5 Full campus rollout System expanded to all campus bin locations; full AI route optimisation activated campus-wide Ops + Tech Lead 14 days 10,000 1.7 Phase 1.7 — Project Closure 1.7.1 Lessons learned report Documented analysis of successes, failures, and recommendations for future smart campus systems Project Manager 4 days 1,500 1.7.2 Final funder report Financial acquittal and impact report submitted PM + Finance 5 days 2,000 Third-party security audit report; all critical and high vulnerabilities resolved AI-Driven Smart Waste Management System — University Campus Work Breakdown Structure (WBS) WP ID Work Package Deliverable / Output Owner Duration Budget (S$) to funding agency with full KPI evidence 1.7.3 System documentation handover Technical documentation, admin credentials, and maintenance SOPs handed to university IT and Facilities Tech Lead 4 days 2,000 1.7.4 Formal project signoff Written acceptance from project sponsor and university; all project records archived Sponsor + PM 2 days 500 WBS summary Total work packages: 37 across 7 phases Total estimated duration: approximately 252 working days (12 months) Total estimated budget: S$462,000 (46.2% of the S$1,000,000 funding ceiling) Remaining budget reserve: S$538,000 — allocated to contingency (S$92,400 / 20%) and project management overhead (S$46,200 / 10%), with S$399,400 available for scope changes or scope growth All work package IDs are cross-referenced in Table 3.2 (Project Schedule) and Table 3.3 (Risk Register) References (WBS section) Haugan, G. T. (2002). Effective Work Breakdown Structures. Management Concepts Press. Project Management Institute (PMI). (2021). A Guide to the Project Management Body of Knowledge (PMBOK Guide) (7th ed.). PMI. PMI Practice Standard for Work Breakdown Structures. (2006). Practice Standard for Work Breakdown Structures (2nd ed.). Project Management Institute. AI-Driven Smart Waste Management System — University Campus Work Breakdown Structure (WBS)
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )