Assignment #1 – WBS and Job Logic
Question 1 (3 points): Suppose that you are a project manager of a one-story commercial
building project. The drawings for the building are shown below.
Figure 1 Draft Building Plan
Develop a preliminary 3-level WBS for the building. This is an open-ended problem so I am not
looking for a specific answer. Please add extra work packages as needed.
A detailed scope specifies the following items to be included (in addition to other desirable
items and actions);
i)
ii)
iii)
iv)
v)
vi)
vii)
Concrete block exterior and interior walls
Bar joists roof covered with a steel roof deck
Rigid insulation
Built-up roofing
Suspended acoustical tile ceiling
Concrete slab floor on grade with an asphalt tile finish
All interior wall finished with paint
Consider following items as major sub-deliverables (i.e. Level 2 entries for WBS);
i)
ii)
iii)
iv)
v)
vi)
Site Preparation
Floor Slab Construction
Concrete Wall Construction
Roof Construction
Electrical Systems (no sub-elements needed)
Mechanical Systems (no sub-elements needed)
CE502
Question 2 (10 points): The work breakdown structure (WBS) for a single-family home is
shown below. There are 6 sub-deliverables (orange) and 20 work packages (grey) identified in
the WBS. Please develop a job logic table for this project. The table should clearly identify
predecessors, successors, and concurrent activities for each individual work package (grey
items).
CE502
Question 3 (7 points): A WBS of the storage building is shown in a table format (Table 1).
Based on the given information, a draft job logic (sequence of activities) is identified as
summarized in Table 2. Draw the Job Logic diagram using information provided in Table 2.
Table 1 WBS for a Storage Building
SB
Level 1
Storage
Building
Level 2
EW Earth and Site
Work
33 46 16
33 22 19
32 31 13
32 94 19
Level 3
Drainage
Grading
Fencing
Landscaping
ST
Structure
32 12 16
03 41 16
04 28 23
05 21 19
Paving
Slab-on-grade
CMU Block Walls
Bar Joists to Roof
FI
Finish
07 41 13
09 51 26
10 20 00
Roofing
Ceiling
Interior Finish
ME Mechanical and 08 33 23
26 06 00
Electrical
26 55 53
Roll-up Doors
Electrical
Security lights
Table 2 Sequence of Activities
No.
Activity Description
Predecessor
Successor
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Drainage
Grading
Slab-on-grade
Paving
CMU Block Walls
Fencing
Bar Joists
Roofing
Security Lights
Electrical
Ceiling
Interior Finish
Roll-up Doors
Landscaping
1
2
3
3
4
5
7
6,8
7
8
11
8
6
2
3
4,5
6
7
9,14
8,10
9,11,13
12
-