TENDERING METHODS IN CONSTRUCTION There are three types of tendering methods in construction – by open tendering, selective tendering, or by negotiation. Open Tendering Methods in Construction: Under open tendering the employer advertises his proposed project, and permits as many contractors as are interested to apply for tender documents. Sometimes he calls for a deposit from applicants, the deposit being returned ‘on receipt of a bona fide tender’. However, this method can be said to be wasteful of contractors’ resources since many may spend time preparing tenders to no effect. Also, knowing their chances of gaining the contract are small, contractors may not study the contract in detail to work out their minimum price, but simply quote a price that will be certain to bring them a profit if they win the contract. Thus the employer may be offered only ‘a lottery of prices’ and not necessarily the lowest price for which his project could be constructed. If he chooses the lowest tender he runs the risk the tenderer has not studied the contract sufficiently to appraise the risks involved; or the tenderer might not have the technical or financial resources to undertake the work successfully. It is true that the employer can check the resources and experience of the lowest bidder and reject his tender if the enquiry proves unsatisfactory; but several bids may be below the estimated cost of the job and, if such tenderers appear satisfactory and their bids are not far apart in value, it is difficult for the employer to choose other than the lowest. The engineer advising the employer may think there is a risk that all such low bids could prove unsatisfactory, but he cannot advise the employer what other bid to accept because he has no certainty of information. Selective Tendering Methods in Construction: Under selective tendering the employer advertises his project and invites contractors to apply to be placed on a selected list of contractors who will be invited to bid for the project. Contractors applying are given a list of information they should supply about themselves in order to ‘prequalify’. The advantage to the employer is that he can select only those contractors, who have adequate experience, are financially sound, and have the resources and skills to do the work. Also, since only half a dozen or so contractors are selected, each contractor knows he has a reasonable chance of gaining the contract and therefore has an incentive to study the tender documents thoroughly and put forward his keenest price. However, since contractors have all pre-qualified it is difficult to reject the lowest bid, even if it appears dubiously low – unless that is due to some obvious mistake. A problem with both open and selective tendering is that a contractor’s circumstances can change after he has submitted his tender. He can make losses on other contracts which affect his financial stability; or may be so successful at tendering that he does not have enough skilled staff or men to deal with all the work he wins. Neither method of tendering nor any other means of procuring works can therefore guarantee avoidance of troubles. Negotiated Tendering Methods in Construction: Negotiated tenders are obtained by the employer inviting a contractor of his choice to submit prices for a project. Usually this is for specialized work or when particular equipment is needed as an extension of existing works, or for further work following a previous contract. Sometimes negotiated tenders can be used when there is a very tight deadline, or emergency works are necessary. A negotiated tender has a good chance of being satisfactory because, more often than not, it is based on previous satisfactory working together by the employer and the contractor. When invited to tender the contractor submits his prices, and if there are any queries these are discussed and usually settled without difficulty. Thus mistakes in pricing can be reduced, so that both the engineer advising the employer and the contractor are confident that the job should be completed to budget if no unforeseen troubles arise. However, negotiated tenders for public works are rare because the standing rules of public authorities do not normally permit them. But a private employer or company not subject to restraints such as those mentioned in the next section can always negotiate a contract, and many do so, particularly for small jobs. Even when a negotiated tender is adopted it is usual to prepare full contract documents so that the contract is on a sound basis. Production of the documents also means they are available for open or selective tendering should a negotiated tender fail, or should the chosen contractor be unable to undertake the work. Open tender Open tendering is the main tendering procedures employed by both the government and private sector. The client advertises the tender offer in the local newspaper giving detail and key information of the proposed works and inviting interested contractor to tender. In the legal sense such tender notices constitute invitation to treat, a mere request by the employer for suitable contractor to submit their bids or offers. If the pre-requisite to tendering on the form of possession of the necessary registration has been identified in the tender notice, then the advertisement is directed to only that particular class of the public having the said qualifications. In order to reduce number of enquiries, earnest money is deposited (for private project). Until the receipt of a bone fide tender selected then it will be returned. Although price is very important in the decision on which tender or bid to accept, it is not the only factor taken into account. Client does not bind to accept the lowest or any offer. The advantages and disadvantages of open tender are stated below: Advantages Disadvantages It allows any interested contractor to tender. Therefore it gives opportunity for an unknown contractor to compete for the work. The tender list can be long as too many contractors tendering for one job. Allowing the tender list to be made without bias. Client will obtain the bargain possible. No favouritism in selecting contractors. Uneconomic use of source. Ensuring good competition not obliged to accept any offers. Public accountability may be questioned if the lowest offer is not accepted. Traditional method of tendering, familiar to all sector of the engineering and construction industry. Does not attract reputable and established contractor unless they are forced to, due to lack of work. Selective tender Selective tendering is the one alternatives developed to address the limitations of the open tendering procedure. In this method, a short list of contractor is drawn up and they are invited to submit tenders. The purpose of the elective tendering are to improve the quality of the bids received, to ensure that contractors with the necessary experience and competence are given the opportunity to submit the necessary bids, due to urgency work involved, for specific reasons of the employer, eg security reasons in government projects. etc. and to make the tendering procedure more manageable and less a burden on the parties involved. Such list may be prepared through recommendation from the Client's professional adviser whom have knowledge of the Contractors undertaking the work in the past or advertisement through the newspaper (prequalification). The advantages and disadvantages of the selective tendering are stated below. Advantages Disadvantages Only the competent contactors were invited to tender, then the lowest can be accepted. Reduces the availability of work for other contractors especially new contractors. It reduced the cost of tendering (economic use of resources, reduced tender documentation, shorter tender periods, better management of the tender process, etc.) Tender Price may invariably higher than would have been in open tendering. Greater chance of collusion. Tendering period longer because it involved two distinct stages. Favoritisms may occur in the short listing. Two Stage Selective Tender Two stage selective tendering combined elements of competition and negotiation into a formula where the employer could utilize the contractor's expertise at an early stage of the project cycle so as to maximize innovation, ingenuity and quality and simultaneously optimize cost, time and resource input. A contractor is selected competitively early in the design process. The tender documents contain approximately quantities of the major value items. As design and planning proceed, the final tender is developed from cost and priced data supplied with the initial tender. Two stage selective tendering was very popular in developed countries. It was different from selective tendering because has two (2) distinct stages namely: Selection of suitable contractor This involves the selection of a suitable contractor and the establishment of a level of pricing for subsequent negotiations. The objective is to select suitable contractor as early as possible is to work together with the professional team and to establish a level of pricing for subsequent negotiation. The criteria for short listing is normally confined to items such as technical and financial capability, experience in similar works and extent of resources (manpower, plant and equipment). The pricing document should be flexible enough to cater for adjustment of price fluctuation for the period between two stages and the pricing of the second stage. In selecting a suitable candidate, a basis for pricing the subsequent second stage should be established accordingly. Determination of Contract Price Once a suitable contractor is selected, he will work together with the project team start contributing to the pre contract process in his capacity as unbiased but independent construction expert. This contractor will contribute the following: Contribution as a Technical Advisor to the Design Process Practical Skills and Buildability Minimization of Project Delay During this stage, a negotiation to reach an agreement on the final contract price is undertaken and the pre contract process is perfected. If no agreement being reached, the employer has an option to abandon the tendering exercise and re-tender the works using any other tendering procedure. The application of two stage selective tendering might be appropriate where the works are a very complicated nature, where at the time of selection of the contractor, the magnitude of the work may not be known with sufficient certainty and where it is an essential pre-requisite for works to be finished by an early completion date. Table below are some advantages and disadvantage of two stages selective tendering. Advantages Disadvantages Benefit of the contractor's expertise in buildability, specialist knowledge in proprietry systems, project scheduling, etc resulting in value for money. Its application requires a high level of familiarity and commitment on the part of employers and contractors. Early commencement of work at site even when the magnitude of the works is not known with sufficient certainty at the time of site possession. Owing to a relatively smaller element of competition, but on the other hand higher negotiations content, the tender process is relatively more expensive and longer than other common procedures. Savings of time due to the overlap of the design and tendering stage. Should the second stage be deadlocked or result in no acceptable agreement being reached, the tender process has to be initiated all over again, albeit, through a different route. This incurs a time and cost penalty to the project as a whole. The procedure utilizes the best aspects of both competition and negotiation to arrive at the most favourable arrangement at an optimum firm price before work commences. This procedures requires a high level of commitment, integrity and good faith on the part of both sides which sadly is usually lacking, hence the apparent failures encountered to date. Since the contractor is part of the project team at a very stage of the project, this results in better communication and information flow. Generally there will be fewer claims and disputes in the post contract award stage due to the contractor's involvement at the design / pre contract stage. Experience has shows that the contractor has a clearer understanding of the requirements and a better appreciation of the intricacies of the design and contract documentations. Negotiation Tender Negotiation tendering is extensively used in the engineering and construction industry commencing from tendering till dispute resolutions, i.e. under the styles of pre-contract negotiations and post contract negotiations. Usually with single contractor but may be up to three contractors. Negotiation process involves are as follows: Identification by the employer of a suitable contractor to negotiate with. The contractor can be selected either from the employer's own list of preferences or on the advice of the professional team. The contractor being apprised of the workscope. The selected contractor is issued with details such as the scope of work involved, relevant drawings, design and /or information to enable him to appreciate the extents of obligations and the employer's actual needs. Some employers prepare and issue to the contractor proper tender documents inclusive of a nominated bills of quantities to assist contractor in pricing the works for the forthcoming negotiations. Negotiations can be applied to the following type of contract: In Partnering type of contracts under the so called win-win formula. Where the employer has a long term business relationship with the contractor. In situations where the parties are in a relationships of holding and subsidiary companies. Where the contractor is involved in the financing of the project. In situations where the employer finds it advantages to employ the same contractor to continue an initial or existing contract for the new works Where there is a pressing need to have a very early start of work on the site and to complete the works on a fast tract basis. In special circumstances e.g. Security reasons, emergencies etc where it is expedient to secure the services of a particular contractor only. Where there is only a single contractor who is the only one available or with ether the special skill or resources to carry out the particular works. The employer's resources are either limited or constrained thereby making the use of the other tendering impractical. Advantages Disadvantages Only reputable contractor are invited for negotiation. The cost work is likely higher than competitive tender. The Contractor can contribute his expertise during design stage. Reduces the availability of work for other contractors. Early Commencement of work on site. It shortens the period involved in appointing the contractor. Should the negotiations be deadlock or prove eventually unsuccessful, this causes wastage of valuable resources on both sides and loss of time for the employer, thereby delaying the overall selection of suitable contractor. Reduce risk of failure Best alternatives for the employer to adopt is special circumstances such as emergencies, security reasons and etc. Experience has shows that contracts let out this basis result in fewer disputes and claims during the construction stage. Term Tender Term tendering normally used on major maintenance projects. It may be awarded to a contractor to cover a range of different buildings in different locations. It is often limited to a fixed time scale, although the needs of the client may often require this to be extended. It is like a standing offer to undertake a loosely defined extends of work usually within a fixed time period. The type of work is usually specified and priced in a schedule of rates. The contractor will initially be offered the work to cover a number of different trades usually on the basis of prices contained in a schedule prepared by the client.Where the client supplies the rates for the work, the contractors are given the option of quoting a percentage addition or deduction from these rates depending upon their desire to win the project. The contractor offering the most advantageous percentage to the client will then be awarded the contract. An indication of the amount of work expected over the specified period of time will assist the contractors in the consideration of the percentage to be quoted. 2.3 Conventional Tendering Process As the researcher mentioned before, this chapter will focus on conventional tender while the next chapter will focus on electronic tendering. Therefore readers will see clearly background on conventional tendering and electronic tendering. Conventional tendering process will involve pre-tender stage, tender advertisement stage, closing of tender, tender opening process, tender evaluation process and finally tender award. 2.3.1 Pre-tender Stage At pre-tender stage, when the clients have an idea, client will appoint consultant to discuss further about the project. Consultant will do their job, advising, managing the tender and contract, and also transfer the idea into the drawing. At this stage client and consultants will brainstorming about the scope, time to complete and budget that client willing to allocate. Researcher believes that pre-tender stage is most crucial matter because it will initiate the next step of a project. If the pre-tender stage is failed, the project will not successfully complete. 2.3.2 Tender Advertisement Tender advertisement also called tender notice. The conventional tender notice will advertise in local newspaper. In tender notice, basic requirement should be appearing are: Title of the project. Class of contractor, head and subhead needed. Location, date, and time to obtain the tender document. Fees for tender document. Location, date and time for submission of tender doc. 2.3.3 Closing of Tender In tender notice will mention the time and date of tender closing process. If the contractors fail to submit their bids within specific time and date, it considers the contractors refuse to bid for the tender. At that time also tender validity period is started. At this period, contractors can withdraw back their bids if they are no more interested to fight for the tender. Consultant use this period to make assessment and evaluation each of the offers. 2.3.4 Tender Opening and Evaluation Process Quantity surveyors usually will handle tender opening process. In order to preserve the integrity of the competitive process, it is imperative that the evaluation of proposals is undertaken objectively, consistently and without bias towards particular suppliers. Tenders are usually evaluated against a pre-determined set of criteria. The evaluation of the tenders shall be prepared the soonest possible after the tender opening. A report prepared by the Quantity Surveyor will describe the findings of the said evaluation and it will be supported by tables and graphs. In the end, the Quantity Surveyor will recommend which tenderer, who in his opinion, is the most suitable to undertake to execute the project. 2.3.5 Tender Award An evaluation team will examine each tender received and make recommendations as to which tender represents best value for money. Once the contract has been awarded, both the successful and unsuccessful tenderers will be notified. Once the final decision has been made on the tender award, the tender administrator creates the tender results notification which is in letter form, and then sent to all participating contractors. Tender documentation for construction projects A tender is a submission made by a prospective supplier in response to an invitation to tender. It makes an offer for the supply of goods or services. Tender documents are prepared to seek tenders (offers). Generally, tendering refers to the construction works, rather than consultancy services which is referred to as appointing. Tender documents may be prepared for a range of contracts such as; equipment supply, the main construction contract (including design by the contractor), demolition, enabling works etc. Ideally, tender documents should be broken down into a series of packages (even if there will only be one main contract) each with its own design drawings and specifications suitable to be issued by the main contractor to potential sub-contractors. This makes the tender easier to price for the contractor and easier to compare with other tenderers for the client. It is important when this is done to ensure that the interfaces between packages are properly identified and clearly allocated to one package or another. Having too many packages increases the number of interfaces and so the potential problems. The cost plan (pre-tender estimate) should also be reassembled package by package to allow easy appraisal of tenders received. Tenders documents may include: A letter of invitation to tender. The form of tender. Preliminaries: including pre-construction information and site waste management plan. The form of contract, contract conditions and amendments. This might include a model enabling amendment for building information modelling (BIM), making a BIM protocol a contractual document. A tender pricing document (or contract sum analysis on design and build projects). Employer's information requirements for BIM. Design drawings, and perhaps an existing building information model. Specifications. Copies of the tender documentation should be kept for records. It is good practise to send relevant documents direct to sub-contractors named in bills of quantities and to tell tendering contractors that this has been done, so they know they do not have to. NB. On construction management contracts, tender documentation for trade contracts might include the construction manager's master programme.
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )