CHAPTER 1+2: Intro + Terminology Concept / Model Cost Planning & Control Cost & Cost Object Cost accumulation and cost assignment Direct vs. Indirect costs (+cost allocation) Which costs to allocate? Product vs. Period costs Cost behavior: Variable vs. fixed costs Operating Leverage Asymmetric cost behavior: Cost stickiness Cost classification Consumption tracking methods + LIFO Liquidation Definition / Explanation Planning: Deciding on orga. Goals, predicting results under alternatives of achieving, and then deciding. → Budgeting: Quantitative plan of action by management for the future, and aid to coordination and implementation of plan Control: Deciding and taking actions that implement plans → Performance report: Actual vs. Budgeted amounts Cost: Resource sacrificed to achieve an objective (i.e. monetary amount to acquire goods and services) Cost object: Anything which subjectively requires a separate measurement of costs Cost accumulation: Collection of cost data following an accounting system Cost assignment: Tracing accumulated costs to a cost object, and allocating accumulated costs to a cost object DC: Related to a given cost object (e.g. product) and feasibly traceable. IC: Related to cost object but not feasibly traceable → Cost allocation: Assigning of IC to (desired) cost object. There are cost allocation methods to make systematic assumptions about allocation – use of a cost allocation base (e.g. space usage, employees) Product: Attributable to individual product units. When incurred, they are capitalized (on BS). Enter IS when product generates rev. (e.g. depreciation of machinery) Period: Recorded as expenses when incurred. Relate to rev. of period rather than a product (e.g. wages in HR) VC: Change in total in proportion to changes in related level of total activity or volume. FC: Don’t change in total for given period despite changes in total activity or volume Measures relationship between a company’s variable and fixed cost, hence risk-return trade-off in the cost structure choice (higher when FC high and low p.u. VC. With higher operating leverage, profit responds more strongly to volume changes. OL = Contribution Margin / Operating Profit CM (Income change as number of units change) = Sales rev. – VC; OP = Sales rev. – VC - FC Sticky costs: Costs that “fall less in response to concurrent sales decreases than they rise for equivalent sales increase” → Main drivers: Adjustment costs, past resource levels, expectations reg. sales dev. Classification of costs based on their type of input (e.g. materials, depreciation) or by their business function (e.g. production) FIFO: Oldest items leave inventory first. Costs become COGS, whereas cost of the most recently purchased inventory is on the inventory account on the BS. LIFO: Most recently purchased leaves inventory first. Analogically to FIFO for COGS/BS → Periodic: Cost of latest inventory assigned at very end of period → Permanent: Each sale matched during period with cost of inventory that was most recently purchased from the perspective of the transactions Weighted Avg: Avg. cost calculated using total inventory. Applied to units sold during the year and the units of inventory at the end of the year. (Also, period vs. permanent) LIFO Liquidation: The liquidation of old Balance Sheet LIFO-layers in previous accounting periods. π·πππππππ πππππ ππππ π ππππππππ−πππππ πππ πππππ πΌπππππ ππππ π·πππππππ πππππ ππππ π ππππππππ−πππππ πππ πππππ Usage-based (cost/unit) = π»ππππ ππππππππ (π.π. πππππ ππππ ππππ ) Straight-line (cost / year) = Depreciation Methods (Measuring costs requires Judgment) Declining balance (cost / year) = Book value * declining rate (%) → Declining rate = π − Sum-of-the-years-digits (cost/year) = πΉππππππππ ππππππ ππππ πΊππ ππ πππ πππππ ππππππ ππππ πππππ πππ πππππ √ππππππππ πππππ ππππ π ππππππππ ∗ (π·πππππππ πππππ ππππ π ππππππππ − πππππ πππ πππππ) CHAPTER 3 + 4 + 5: COSTING SYSTEMS (JOB, PROCESS, JOINT, ABC) Costing System (Job Costing and Process Costing) Timeliness of costing systems under/over-allocation Budgeted indirect costs and end-of-period adjustments Joint Costing Approaches to allocate Joint Costs Cost Smoothing (Problems solved by ABC) ABC Procedure Time-driven ABC Costing System = systematic procedure of how to deal with allocation of the indirect costs to the “right” cost objects. It helps to choose what the most useful cost object is. Job Costing = The cost object is unit(s) of a distinct product or service. → Schedule: (1) Identify chosen cost object (2) DC of job (3) Selection of cost-allocation bases (4) IC associated with each CAB (5) Rate per unit of each CAB and allocate IC (6) TC of job (DC+IC) → Cost allocation rates = ? Process Costing = Cost object is a mass of identical units of a product or service → Schedule: (1) Summarize flow of physical units of output (2) Output in terms of equivalent units (3) Equivalent unit costs (4) TC to account for (5) Assign TC to units completed and units in process → Equivalent units = Derived amount of output units (quantity of each input in units completed or work in progress and converts into amount of completed output units that could be made with that quantity of input) → Multi-stage process costing = ? ? 1. Adjusted allocation rate approach: Recalculation with actual IC rate (Calculation of actual IC rate and recalculation of every job cost record) 2. Proration approach: Reallocation of deviation amount to COGS and closing stocks → Based on total amount of IC allocated (before proration) and on total closing balances 3. Write-off approach: Year-end write-off to COGS (Entire difference directly written off to COGS) → Least complex but least precise Joint Costs = Costs of a single production process that yields multiple products simultaneously = IC that a company incurs up to the point where the initial raw materials are split off. (i.e. Start: Joint Object later split into different products) → Split-Off-point: Juncture in the production process where one or more products in a joint-costing setting become identifiable → Separable costs: All costs incurred after the split-off-point that are assignable to each individual product → Classification of products: Based on the sales value MARKET-BASED DATA Sales value at split-off: Allocates JC to JP based on the relative sales value at the split-off of the total production of these products during ACC-period. Estimated net realizable value (NRV): Expected sales value (in ordinary course of business) – expected separable costs of total production. Constant gross-margin percentage: Allocates JC to JP in a manner that overall gross-margin is identical for each individual product. (Final Sales – Overall gross margin = TC → TC – Expected separable costs to obtain JC-allocation) PHYSICAL MEASURE-BASED DATA Allocates JC to JP based on a physical measure (e.g. relative weight, volume) at the split-off-point of the products’ TP during ACC.p Cost smoothing leads to… Product undercosting: Product consumes many resources but reports low TC – losses from product, as wrongly assuming that sales are profitable. Product overcosting: Product consume little resources but reports high TC – losing market share, as product cost is wrongly assumed to be higher (1)Direct cost tracing (classifying as many costs as feasible to DC), (2) Indirect cost pools: Homogenous cost pool of all costs with same cause-and-effect relationship (=activity) with the allocation base (3) CAB: Use cause-and-effect rs between cost driver (cause) and indirect cost pool (effect) (4) Compute product costs based on activities. (1) Determine time it takes to carry out one unit of each kind of activity πΆππ π‘ ππ π π’ππππ¦πππ πππππππ‘π¦ (2) Cost per time of supplying capacity = → PC estimated and COSC allocated (overheads) πππππ‘ππππ πππππππ‘π¦ (3) (4) Cost Center & Cost Pool Allocating costs from support to operating dept. Should FC incurred by supdept be allocated to opdept? Allocation of FC: Single-rate vs. dual-rate Budgeted cost allocation vs. actual cost allocation Cost-driver rates (Cost per time * Time per unit) Cost per activity to be calculated with cost-driver rates (Sum of all) CHAPTER 6: Cost Centers Cost Center: Smallest unit of a company at which (1) costs are accumulated, monitored, and planned (2) a manager bears responsibility (also for investments or revenues) → CC design: Is divided into two dimensions: (1) business functions (e.g. HR, material supply), and (2) Support (Primary CC) – cost accumulation but no direct allocation to final cost object but to other CC or Operating Departments (Final CC) – Cost accumulation and cost allocation from support dep. (Direct allocation to final cost object). → Principles: No ambiguity, completeness, homogeneity, clear responsibilities, and cost benefit Cost Pool: Grouping of individual cost items, which can be very broad or very narrow Cost-based transfer prices: Cost of the product or service being transferred // actual vs. budgeted cost 1. Direct allocation method: Costs to support dep. directly to operating dep. (exact transfer prices if supdept and opdept do not provide services to each other). 2. Step-down allocation method: Costs to supdept to other supdept and opdept (exact TP if only one-sided rs between supdep). Which supdept should be allocated first? A1) Greatest percentage of support to other supdept or A2) Greatest support to other supdept in terms of costs 3. Reciprocal allocation method: Costs by including mutual services provided among supdepts. (Always exact TP) → Equation system 4. Budgeted rates: Mgtm. sets prices in advance (budgeted costs and expected interactions) → Normal costing with potential re-allocation at end of period on actual data. → Allocating costs of opdep: All IC have been allocated to operating dep., so now we can compute actual allocation rates for product costing based on the chosen allocation bases. Most companies do so, as (1) Supdept provide services that maintain other internal dep.; (2) Accurate product and service costs require the full inclusion of all supdept costs as well as opdept costs, (3) more accurate for supdept cost allocations result in more accurate product and service costs. BUT FC will be incurred anyways, FC don’t vary as much, and FC are less decision relevant. Single rate cost allocation: Pools all costs in a cost pool and allocates them to cost objects using the same rate per unit of the single allocation base. No distinction between costs in the terms of cost behavior (FC vs. VC). ππͺ ππ πππππππ π πππ = #πππππ ππ ππππ πππ ∗ πΊπππ πππ ππππππππ(=πππππ πππππ ππ πππ π ππππππππππ → budgeted vs. actual rates can be decided (+) Low implementation costs (-) Treats VC and FC identically, may incentivize managers to take actions in their own interest --Dual-rate allocation method: Classifies costs in each cost pool into two cost pools – FC-pool and VC-pool, which use different allocation bases. Equation is split into FC and VC component… (actual vs. budgeted choice is independent) πΌππππ ππ πππππππππ π ππ πΏ FC component → πππππ πͺπππ ∗ π»ππππ πππππ ππ πππ πππππππππ π ππ + VC component // (Use budgeted usage avoid incentive issues) VC component → π½πππππππ ππππ ππππ ∗ πΌππππ ππ πππππππππ π ππ. (Better to use actual usage to hold managers responsible for actual resource consumption) (+) Different behavior between VC and FC, guides managers to take decision that benefit the organization (-) Requires categorization of costs into VC and FC (more time-consuming) Budgeted cost allocation: Dept. will know their allocated cost rate in advance, which helps user dept. for short-long-term planning; User dept. doesn’t pay for any costs that exceeded the budgeted amounts; Motivation of supplier dept. to improve efficiency due to supplier dept. risks of unfavorable cost variance. Actual cost allocation: User dept. doesn’t know how much is allocated until end of period, variations in usage in another dept. will affect FC allocated to other dept.; most precise allocation. → Efficiency-precision trade-off: FC budgeted and VC actual CHAPTER 7: Performance Management How to get a stand-alone price if product not sold separately Alternative profit definitions (not legally binding) Total cost method vs. cost of sales method How to value changes in inventory? Variable vs. Absorption Adjusted market assessment approach: Starting point = prices from the firm’s competitors Expected cost plus a margin approach: SP = Cost plus avg. profit margin Residual approach: SP = Price of other components Net Income: Operating rev. – operating costs + non-operating rev. – non-operating costs + financial result – income taxes Comprehensive income: Net Income + other comprehensive income (Changes in BS-assets (securities) and liabilities (pension liabilities) that don’t go through to the IS) EBIT: Net income + net interest expense + income taxes EBITDA: Net income + net interest expense + income taxes + depreciation / amortization expense NOPAT: Operating rev. – operating costs – income taxes This differentiation only affects presentation of income statements, it doesn’t affect the bottom line (gross margin) TCM: Rev. – total costs of all manufactured products (classified by cost types) + increase in inventory – decrease in inventory = GM CSM: Rev. – total costs of all sold products (classified by product types) = GM Fixed manufacturing costs (FCM) part of product costs (COGS) reducing Gross Margin or period costs? If product costs, changes in inventory include FMC; if period costs, it doesn’t include FCM Inventory costing methods and profit Variable: FCM aren’t inventoried, no production volume Absorption: FCM inventoried, PVV (β Budgeted fixed overhead variance (PVV), other variances treated as AC, and and allocated fixed overhead), other variances as VC, classifications between VC and FC are routinely made. classifications between VC/FC not always. (1)Managers can increase operating profit in a specific period by increasing production schedule, even without additional demand; (2) Switch production to items that absorb highest amounts of FCM, disregarding customer demand; (3) Increase of production even though other plants are better suited; (4) Deferring maintenance beyond current ACC period Constant inventory levels /Increase / decrease in inventory: AC profit = VC profit / ACP > VCP / ACP < VCP Balanced Scorecard Reflects cause-and-effect rs based on company’s strategy - four perspectives: financial, customer, process, and learning/growth. It defines objectives, measures, targets, and initiatives. Shortcomings of absorption costing CHAPTER 8: KPIs and Ratio Analysis
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )