Tannery Industry Waste
Management
• To address environmental concerns,
the Bangladesh Govt. initiated the
relocation of tanneries from
Dhaka’s Hazaribagh area to the
Savar Tannery Industrial Estate
(STIE).
• So the project main focus will be
the waste management.
• *Objective:
• 1.To design and implement a
efficient tannery waste management
system.
• 2.Reduce pollution, improve water
quality, and promote sustainable
practices in tanneries.
https://www.tbsnews.net/thoughts/potential-andrisks-solid-waste-produced-tanneries-749794
Tannery Industry Waste
Management
Waste from tannery industry
• Leather Trimmings & Shavings
• Fleshing & Hair
• Sludge from Effluent Treatment
• Buffing Dust
• Soaking
• Dyeing & Fatliquoring
• Finishing & Washing Stage
https://www.indiamart.com/proddet
ail/leather-shaving-dust6281101730.html
Tannery Industry Waste
Management
Potential Solution for Waste Management
• Leather Board Production(Solid)
• Biogas Production (Solid)
• Three-Stage like primary , secondary , tertiary
waste water Treatment System.(Liquid)
• Composting(Solid)
Cost Estimation for the Project will be
calculated but most likely it will be 6000080000