Uploaded by Humberto Sierra

Boeing 777 Container Loading Instructions

advertisement
BOEING 777
AKE/PLA LOADING
Forward HOLD
1)
The position which has the Latch System can be loaded individually.
2)
If you load 13L/R and 14L/R
3)
Latch system
11L
11R
Latch system
12L
12R
13L
13R
14L
14R
21L
21R
22L
22R
23L
23R
24L
24R
25L
25R
26L
26R
27L
27R
Latch system
28L
28R
Latch system
31L
31R
32L
32R
33L
33R
34L
34R
35L
31R
36L
36R
Latch system
41L
41R
Latch system
42L
42R
43L
43R
44L
44R
Latch system
21L/R must be occupied.
If you load 22L/R, 23L/R, 24L/R, 25L/R, 26L/R and 27L/R
must be occupied.
28L/R
Aft HOLD
4)
If you load 43L/R
44L/R must be occupied.
5)
If you load 32L/R, 33L/R, 34L/R, 35L/R and 36L/R
occupied.
31L/R must be
Latch system
BOEING 777
PMC-PAG LOADING
Forward HOLD
1)
Latch system
11P
Latch system
12P
13P
The position which has the Latch System can be loaded individually.
Latch system
2)
If you load 13P
3)
If you load 22P, 23P, 24P
21P must be occupied.
21P
22P
25P must be occupied.
23P
24P
Latch system
25P
Latch system
31P
Aft HOLD
4)
If you load 32P, 33P, 34P
31P must be occupied.
Additional Notes:
32P
**If you load one or more pallet starting from 31P, the first container must start
with 41L/R position.
33P
**If you load one or more pallet starting from 25P, the first container must start
with 21L/R position.
**If 31P, 32P, 33P and 34P are occupied by PAG, 41L/R can be used. OR even one
or more PMC loaded at aft hold starting from 31P, Container loading must start
with 42L/R position because of the dimension of PMC.
34P
Latch system
41P
Latch system
42P
Download