CONSTRUCTION NOTES:
1.
2.
3.
4.
201mm
5.
COLLAR BAND
LIGHT GREEN
76mm
- AUGER THE APPROPRIATE SIZE HOLE
- SET POLE IN HOLE AND PLUMB STRAIGHT
- BACKFILL WITH SPECIFIC MATERIAL
GENERALLY THE NATIVE MATERIAL CAN BE USED
FOR BACKFILL.
POLE CLAMP
refer to POLE CLAMP
drawing for details
40mm
SECURE ALL THE NECESSARY PERMITS AT ALL
CONCERNED AGENCY.
WORKS SHALL CONFORM WITH
TELECOMMUNICATION STANDARDS AND BUILDING /
OWNER REQUIREMENTS.
ALL WORKS SHALL FOLLOW THE STANDARDS,
UNLESS OTHERWISE SPECIFIED.
SITE INSTRUCTION WILL BE ENGINEER AT SITE
DISCRETION AND APPROVAL.
SUPPLY AND INSTALL 7.5 CONVERGE CONCRETE
POLE AS SHOWN ON ATTACHED FIGURES INCLUDING
POLE HARDWARE AND ACCESSORIES
DEPENDING ON SITE CONDITIONS, ALTERNATIVE
MATERIALS MAY BE REQUIRED
E
C
O
N
V
E
R
G
E
LETTER DETAIL
(LIGHT GREEN)
POLE TAG
203mm X 50mm
refer to POLE TAG
drawing for details
7500mm
3000mm
PROJECT TITLE
CONVERGE POLE 7.5
LIFTING MARK
Revision
Date
2.0
08/22/18
GL
OWNER/PROPONENT:
CONVERGE
1200mm
I C T
"GL" STRIP IN
RED PAINT
12mm X 150mm
S O L U T I O N S
I N C.
# 99 Reliance Center E. Rodriguez Jr. Ave. (C-5)
Barangay Ugong, Pasig City Philippines
OWNER/PROPONENT:
METRO WORKS
ICT CONSTRUCTION INC.
#99 Reliance Center E. Rodriguez Jr. Ave., (C-5)
Barangay Ugong, Pasig City Philippines
Surveyed/Designed by :
292mm
Date:
RONALD N. RIMPULA
AutoCAD Operator
Checked by :
Date:
ALPHA T.MAMANSAG
NCR Design Engr. Head
Noted by :
ELEVATION
Date:
ALLAN Q. GO
Access Network Head
Recommended by :
NTS
Date:
EDWIN C. MABITAZAN
Planning & Engineering Head
Work Order No.