CONSTRUCTION NOTES: 1. 2. 3. 4. 201mm 5. COLLAR BAND LIGHT GREEN 76mm - AUGER THE APPROPRIATE SIZE HOLE - SET POLE IN HOLE AND PLUMB STRAIGHT - BACKFILL WITH SPECIFIC MATERIAL GENERALLY THE NATIVE MATERIAL CAN BE USED FOR BACKFILL. POLE CLAMP refer to POLE CLAMP drawing for details 40mm SECURE ALL THE NECESSARY PERMITS AT ALL CONCERNED AGENCY. WORKS SHALL CONFORM WITH TELECOMMUNICATION STANDARDS AND BUILDING / OWNER REQUIREMENTS. ALL WORKS SHALL FOLLOW THE STANDARDS, UNLESS OTHERWISE SPECIFIED. SITE INSTRUCTION WILL BE ENGINEER AT SITE DISCRETION AND APPROVAL. SUPPLY AND INSTALL 7.5 CONVERGE CONCRETE POLE AS SHOWN ON ATTACHED FIGURES INCLUDING POLE HARDWARE AND ACCESSORIES DEPENDING ON SITE CONDITIONS, ALTERNATIVE MATERIALS MAY BE REQUIRED E C O N V E R G E LETTER DETAIL (LIGHT GREEN) POLE TAG 203mm X 50mm refer to POLE TAG drawing for details 7500mm 3000mm PROJECT TITLE CONVERGE POLE 7.5 LIFTING MARK Revision Date 2.0 08/22/18 GL OWNER/PROPONENT: CONVERGE 1200mm I C T "GL" STRIP IN RED PAINT 12mm X 150mm S O L U T I O N S I N C. # 99 Reliance Center E. Rodriguez Jr. Ave. (C-5) Barangay Ugong, Pasig City Philippines OWNER/PROPONENT: METRO WORKS ICT CONSTRUCTION INC. #99 Reliance Center E. Rodriguez Jr. Ave., (C-5) Barangay Ugong, Pasig City Philippines Surveyed/Designed by : 292mm Date: RONALD N. RIMPULA AutoCAD Operator Checked by : Date: ALPHA T.MAMANSAG NCR Design Engr. Head Noted by : ELEVATION Date: ALLAN Q. GO Access Network Head Recommended by : NTS Date: EDWIN C. MABITAZAN Planning & Engineering Head Work Order No. Sheet No. 1 OF 1