UNIT OF COMPETENCY : Prepare estimation of materials for multiple plumbing units MODULE TITLE : Preparing estimation of materials for multiple plumbing units MODULE DESCRIPTOR : This unit covers the knowledge, skills and attitudes in estimating required materials for multiple plumbing units. works, mixing/tinting of paints, and re-painting and/or re-touching work; and estimating painting requirements. NOMINAL DURATION : 32 Hrs. CERTIFICATE LEVEL : PREREQUISITE : NC II SUMMARY OF LEARNING OUTCOMES: Upon completion of the module the trainees/students should be able to: LO 1. Study approved plumbing plan safe handling of LO 2. Estimate and finalize materials take- off LO 1. Study approved plumbing plan ASSESSMENT CRITERIA: 1. All measurements are in accordance with the piping lay-out/plans and specifications. 2. Plumbing Legends, Symbols and abbreviations are identified and interpreted in accordance with job requirements. 3. Specification of materials are identified in the plan according to the job requirements. 4. Plumbing layout is determined/ visualized based on isometric drawing, schematic diagram and details. 5. When necessary, cost of materials are estimated based on the current market price. CONTENTS: 1. Blue print reading 2. ARITHMETIC 3. Trade Theory 4. 5S 5. Environmental- conservation procedures, e.g. 3R (reduce, reuse, recycle) 6. DOLE Department Order No. 13 s. 1998 Guidelines Governing Occupational Safety and Health in the Construction Industry IITACI ENHANCED CBC 1 CONDITIONS: The students/ trainees must be provided with the following: 1. Tools and equipment Pencils Spirit level Calculator Steel Tape Smartphone/ laptop Internet connection 2. Supplies and Materials Chalk stone Bond paper Notebook 3. PPE Gloves (leather) Safety shoes Goggles Methodology - Modular/Self learning - Demonstration - Film Viewing - e-Learning Assessment Method - Interview (oral questionnaire) - Demonstration - Written Test LO 2. Estimate and finalize materials take- off Assessment Criteria: 1. 2. Materials are estimated in accordance with the job requirements. Materials and consumables are quantified and listed in accordance with the job requirements. 3. All results are gathered and summarized for submission in accordance with job requirements. 4. Bill of materials and cost estimate is presented to client / supervisor for approval. CONTENTS: 1. Blue print reading Electrical, mechanical plan, symbols and abbreviation 2. ARITHMETIC Linear measurement Dimension Unit conversion 3. Trade Theory Basic technical plan Various type of drawing Note and specification IITACI ENHANCED CBC 2 4. 5S 5. Environmental conservation(3R) 6. DOLE Department Order No. 13 s. 1998 Guidelines Governing Occupational Safety and Health in the Construction Industry CONDITIONS: 1. Tools and equipment Blue print paper Smartphone / laptop Internet connection 2. Supplies and materials Bond paper Notebook Chalk stone 3. PPE Goggles Methodology - Modular/Self learning Demonstration Film Viewing e-Learning/online Assessment Method - Interview (oral questionnaire) Demonstration Written Test e-assessment IITACI ENHANCED CBC 3 UNIT OF COMPETENCY : PERFORM MULTIPLE PLUMBING UNITS INSTALLATION AND ASSEMBLIES MODULE TITLE PERFORMING MULTIPLE PLUMBING UNITS INSTALLATION AND ASSEMBLIES : MODULE DESCRIPTOR : This unit covers the knowledge, skills and attitudes in installing/assembling multiple units of plumbing in all types of building occupancy. . tools, materials & ipment, painting surfaces; performing works, mixing/tinting of paints, and re-and/or reuching work; and estimating painting uirement NOMINAL DURATION : 80 Hrs. CERTIFICATE LEVEL : PREREQUISITE : NC II SUMMARY OF LEARNING OUTCOMES: Upon completion of the module the trainees/students should be able to: L O 1. Prepare materials for drainage, sanitary, vent and waterline layout work L O 2. Install pipes and fittings for drainage, sanitary, vent and waterline layout L O 3. Install cold water system and multi-point water heater for hot-water supply lines L O 4. Install building drains, sewer and ventilation L O 5. Mount and lay out plumbing fixtures and accessories IITACI ENHANCED CBC 4 L O 1. Prepare materials for drainage, sanitary, vent and waterline layout work Assessment Criteria: 1. Work instructions/ plans are read and interpreted in accordance with the job requirements. 2. Materials tools and equipment are selected and prepared according to job requirements 3. Appropriate PPE are selected according to job requirements. CONTENTS: 1. Blue print reading 2. Plumbing tools and piping materials 3. PPE CONDITIONS: The students / trainees must be provided with the following: 1. Tools and equipment - Pipe threader - Pipe reamer - Pipe wrench - Pipe cutter - Hacksaw - Pull-push rule - Pipe vise - Tri square - Spirit level - Oil can 2. Supplies and materials - Sanitary pipes and fittings - Plastic pipes and fittings - Plumbing fixtures and fittings 3. PPE - Gloves - Goggles - Safety shoes Methodology - Modular/Self learning - Demonstration - Film Viewing - e-Learning/online Assessment Method - Interview (oral questionnaire) - Demonstration - Written Test IITACI ENHANCED CBC 5 L O2. Install pipes and fittings for drainage, sanitary, vent and waterline layout Assessment Criteria: 1. Pipes and fittings are installed as indicated in the approved working plan 2. Supports and braces are installed in accordance with the approved working plan 3. Appropriate PPE is used in accordance with the job requirements. CONTENTS: 1. Mensuration 2. Blue print reading 3. Materials specification 4. 5S 5. Environmental conservation procedures e.g 3R 6. DOLE Department Order No. 13 s. 1998 Guidelines Governing Occupational Safety and Health in the Construction Industry 7. Proper use of tools 8. PPE CONDITIONS: 1. Tools and equipments - Plumbing mock up - Hacksaw - Pull-push rule - Working steel table with pipe vise - Pipe cutter for PVC 2. Supplies and materials - Plastic pipes and fittings - Sandpaper - Solvent cement 3. PPE - Gloves - Goggles - Safety shoes Methodology - Modular/Self learning Demonstration Film Viewing e-learning/online Assessment Method - Interview (oral questionnaire) - Demonstration - Written Test IITACI ENHANCED CBC 6 L O 3. Install cold water system and multi-point water heater for hot-water supply lines. Assessment Criteria: 1. Correct specification of pipes and joint are used in accordance with the job requirements /specifications. 2. Hot and cold water supplies are installed according to the approved working plan and materials specifications. 3. Water supply is assembled leak free & free from contamination and aligned with drainage, vents and waste piping. 4. Proper use of tools and equipment is observed in accordance with manufacturer's instruction manual. CONTENTS: 1. Blue print reading 2. Installation hot and cold water supply 3. Water test 4. Safety measures CONDITIONS: 1. Tools and equipments - Pipe threader - Pipe reamer - Pipe cutter - Plumbing mock up - Pull-push rule - Pipe wrench - Oil can - Steel working table with pipe vise - Steel brush - Fusion machine - Grooving machine 2. Supplies and materials - GI pipes and fittings - Teflon tape - Hot and cold telephone shower - Three-valve shower diverter 3. PPE - Gloves - Goggles - Safety shoes Methodology - Modular/Self learning - Demonstration - Film Viewing - e-learning/online Assessment Method - Interview (oral questionnaire) - Demonstration - Written Test - e-assessment IITACI ENHANCED CBC 7 LO 4. Install building drains, sewer and ventilation Assessment Criteria: - Building drains/sewer and ventilation are installed in accordance to the approved plan. - Materials, tools and equipment are selected and prepared according to job requirements. - Appropriate PPE are selected and used according to job requirements. CONTENTS: 1. Mensuration 2. Blue print reading 3. Materials specification 4. 5S 5. Environmental conservation procedures e.g 3R 6. DOLE Department Order No. 13 s. 1998 Guidelines Governing Occupational Safety and Health in the Construction Industry 7. Proper use of tools 8. PPE CONDITIONS: 1. Tools and Equipments. - Steel Tape Ball-peen Hammer Hacksaw with Blade Blow Torch Pointed Steel Chisel Caulked Steel Chisel Kettle Manual Pipe Threader (1/4”-2”) Pipe Wrench (10”, 12” & 14”, 18”, 24”) Pipe Vise (Chain or Yoke) Bar or Hose level Plumb bob Pipe Cutter Pipe Reamer Threading Machine Welding Machine Test Pump (Manual or Power Driven) Electric Drill Cutting outfit set with oxygen/acetylene tank Electric Grinder Fusion Machine Grooving machine Pliers Wrenches (open, box, combination, adjustable, socket, allen wrench) SUPPLIES AND MATERIALS: - PVC Pipes and Fittings (DWV) PPR Pipes and fittings G.I. Pipes and Fittings C. I Pipes and Fittings PVC Blue Pressure Pipes and Fittings Copper Pipes and fittings HDPE Pipes and fittings Water closet (flush tank/valve) Angle valve and Supply pipe Lavatory with faucet, P-Trap, Angle Valve and supply pipe Bath Tub including waste and overflow assembly Shower head and valve assembly Flushometer Valve IITACI ENHANCED CBC 8 - Electric Flushing devices (sensor) Grease Trap Instantaneous water heater Bidet Kitchen sink with faucet, P-Trap, Angle valve and supply pipe Slop sink Grab bar Urinal Toilet paper holder Soap holder Towel rack Floor drain strainer Faucet Cleanout cover PPE - Gloves - Goggles - Safety shoes Methodology - Modular/Self learning - Demonstration - Film Viewing - e-learning/online Assessment Method - Interview (oral questionnaire) - Demonstration - Written Test - e-assessment LO 5. Mount and lay out plumbing fixtures and accessories Assessment Criteria: - - Specifications of plumbing fixtures are used in accordance with the job requirements. Plumbing fixtures and accessories are installed according to specified roughing-in measurements and/or manufacturer's instruction manual. - Plumbing fixtures and accessories are rigidly secured with strict adherence to perpendicularity and levelness - Usage of tools and equipment is observed in accordance with manufacturer's specifications - Appropriate PPE are used in accordance with the job requirements - Work site is cleaned and kept in safe state and in accordance with Occupational Safety and Health Standards (OSHS). CONTENTS: Mensuration Blue print reading IITACI ENHANCED CBC 9 5S Use of plumbing materials, tools and equipment Environmental- conservation procedures, e.g. 3R (reduce, reuse, recycle) DOLE Department Order No. 13 s. 1998 Guidelines Governing Occupational Safety and Health in the Construction Industry CONDITONS: 1. Tools and Equipment Blue print plan Spirit level Level hose Steel tape Plumb bob SUPPLIES AND MATERIALS: Plastic fittings Sanitary fittings PPE - Gloves Goggles Safety shoes Methodologies: Discussion Demonstration e-learning/ online Assessment Method: Observation Written and Oral Examination Demonstration e-assessment IITACI ENHANCED CBC 10 UNIT OF COMPETENCY: Conduct pipe leak testing MODULE TITLE : Conducting pipe leak testing MODULE DESCRIPTOR : This unit covers the knowledge, skills and attitudes in conducting pipe leak testing. & eainting surfaces; performing painting works, tinting of paints, and repainting and/or re-touching work; and mating painting requirements NOMINAL DURATION : 40 Hrs. CERTIFICATE LEVEL : PREREQUISITE : NC II SUMMARY OF LEARNING OUTCOMES: Upon completion of the module the trainees/students should be able to: L O 1. Prepare for conducting pipe leak testing L O 2. Perform pipe leak testing. Assessment Criteria: All openings in the pipe system are tightly closed except the highest opening prior to leak testing Leak testing is applied after completion of roughing-ins and complete installation of pipe supports. Testing apparatus is set to specified pressure rating according to testing standards. Gravity or flood testing are applied to sanitary, waste, vent and storm drainage piping Pressure testing are applied to hot and cold water piping. Correct usage of tools and equipment isobserved in accordance with manufacturer's specifications Appropriate PPE are used in accordance with job requirements Work site is cleaned and kept in safe state and in accordance with OSHS CONTENTS: Blue print reading 5S Use of plumbing materials, tools and equipment Environmental- conservation procedures, e.g. 3R (reduce, reuse, recycle) DOLE Department Order No. 13 s. 1998 Guidelines Governing Occupational Safety and Health in the Construction Industry CONDITONS: Tools and Equipment IITACI ENHANCED CBC 11 Pipe wrench Pipe threader Pipe cutter Manual / Electric test pump Blow torch Steel tape Adjustable Wrench Ballpeen hammer Cold chisel Hacksaw with blade Set of Allen wrench Screw Driver (Philips and Flat) Mechanical Plier Vise Grip Ladder / scaffolding Flashlight / trouble light Pressure Gauge SUPPLIES AND MATERIALS: Drum / Pail Water Plugs Pipe system drawing Rags Water Hose Teflon tape Personal protective equipment (PPE) Gloves Hard hat Safety Shoe Safety harness/ belt Methodologies: Discussion Demonstration e-learning/ online video presentation Methods of Assessment Direct observation on application of tasks Questions related to underpinning knowledge e-assessment IITACI ENHANCED CBC 12 UNIT OF COMPETENCY : PERFORM PLUMBING REPAIR AND MAINTENANCE WORKS MODULE TITLE Performing plumbing maintenance : MODULE DESCRIPTOR : NOMINAL DURATION This module covers the knowledge, skills and attitudes in maintaining plumbing works.; performing painting works, mixing/tinting of paints, and repainting and/or re-touching work; and estimating painting requirements. : 20 Hrs. CERTIFICATE LEVEL : PREREQUISITE : NC II SUMMARY OF LEARNING OUTCOMES: Upon completion of the module the trainees/students should be able to: L O 1. Repair defective pipes, fittings and plumbing fixtures L O 2. Clear clogged pipes and drains L O 1. Repair defective pipes, fittings and plumbing fixtures Assessment Criteria: • Defective pipes, fittings and plumbing fixtures are identified, disconnected and replaced with the same model and in line with its original working condition Replacements are checked and re-tested to ensure they are free from defects and in accordance with standard specification or as required Joints are tightly secured and leak free in accordance with the job requirements Damaged areas are restored or repaired in line with its original working condition Correct usage of tools , equipment and consumables are observed in accordance with job requirements Appropriate PPE are used in accordance with job requirements CONTENTS: Mensuration Blueprint reading 5S Use of tools and equipment Environmental- conservation procedures e.g. 3R (reduce, reuse, recycle) DOLE Department Order No. 13 s. 1998 (Guidelines Governing Occupational Safety and Health in the Construction Industry) CONDITIONS: The students/ trainees must be provided with the following: IITACI ENHANCED CBC 13 1. Tools and equipments Pipe wrench Pipe threader Pipe cutter Manual / Electric test pump Hand drain cleaner Blow torch Steel tape Adjustable Wrench Ballpeen hammer Cold chisel Hacksaw with blade Basin wrench Strap wrench Set of Allen wrench Screw Driver (Philips and Flat) Mechanical Plier Vise Grip Teflon Tapes Rags Solvent Cement Video presentation Smartphone/laptop/internet connection 2. Supplies and materials - Water closet with accessories - Lavatory with accessories - Urinal - Slop sink - Floor drain - Three-valve shower diverter - Telephone shower - Teflon tape 3. PPE - Gloves - Goggles - Safety shoes Methodology - Modular/Self learning - Demonstration - Film Viewing - e-learning/ online Assessment Method - Interview (oral questionnaire) - Demonstration - Written Test - e-assessment IITACI ENHANCED CBC 14 L O 2. Clear clogged pipes and drains Assessment Criteria: Clogged pipes and drains are precisely identified in reference with the asbuilt plan. Clogged pipes and drains are cleared using appropriate tools, equipment and methodology Pipes and drain are cleared and provided with screen in line with original working condition Appropriate PPE are used in accordance with the job requirements • CONTENTS: Mensuration Blueprint reading 5S Use of tools and equipment Environmental- conservation procedures e.g. 3R (reduce, reuse, recycle) DOLE Department Order No. 13 s. 1998 (Guidelines Governing Occupational Safety and Health in the Construction Industry) CONDITIONS: The students/ trainees must be provided with the following: 4. Tools and equipments Pipe wrench Pipe threader Pipe cutter Manual / Electric test pump Hand drain cleaner Blow torch Steel tape Adjustable Wrench Ballpeen hammer Cold chisel Hacksaw with blade Basin wrench Strap wrench Set of Allen wrench Screw Driver (Philips and Flat) Mechanical Plier Vise Grip Teflon Tapes Rags Solvent Cement 5. Supplies and materials Pipes and fittings PVC/PE Pipe and fittings PPR pipes and fittings G.I. pipes and fittings C.I. pipes and fittings B.I. pipes and fittings Tank fittings for water closet Flush tank fittings for water closet Sewer and drainage line Water supply and distribution line Riser and downfeed Copper pipes and fittings IITACI ENHANCED CBC 15 Plumbing fixtures Lavatory with faucet, p-trap, angle valve and supply pipe Bathtub with waste and overflow assembly Shower valve Flushometer valve Shower heads Electronic flushing devices (urinal, closet, faucet) Water closet ( flush tank/valve) , angle valve and supply pipe Kitchen Sink Bidet Urinal Grease Trap Floor Drain Strainer Clean-out cover Water hammer arrester 6. PPE - Gloves - Goggles - Safety shoes - Ear muff - Hard hat - Goggles - Face shields - Safety harness belt - Dust mask Methodology - Modular/Self learning - Demonstration - Film Viewing - e-learning/online Assessment Method - Interview (oral questionnaire) - Demonstration - Written Test - e-assessment/online IITACI ENHANCED CBC 16