LOCATION & KEY PLAN: 1 3 SECTION 4 E D C PUMP ROOM - 2 24 ER ERS EPP EPP 2nd BASEMENT SW1 B2 2nd BASEMENT WT / CORE WALL C RAFT SLAB 40cm. THK. WATER TANK-2 3rd BASEMENT A1 GENERAL NOTES:- 3rd BASEMENT LEGEND, ABBREVIATIONS AND SYMBOLS:PLUMBING 4th BASEMENT RAFT SLAB 40cm. THK. WATER TANK-1 C O RE W AL L 4th BASEMENT 5th BASEMENT D 5th BASEMENT E 4 B1 3 WATER TANK FLANGES SECTION-1 SCALE : NTS 2 1 1 MECH WATER TANK FLANGES LAYOUT @ B5 SCALE : NTS 0 15 September 2024 FOR CONSULTANT`S APPROVAL JLG REV. DATE DESCRIPTION REVISED BY LOCATION: OLAYA - RIYADH OWNER: PROJECT TITLE: Al Ajlan Tower Office Building - King fahed Road Plot No. 162-163-164-165 DESIGNER : CONSULTANT : Zuhair Fayez Partnership Consultants Architecture, Engineering and Information Systems MAIN CONTRACTOR: AYAR INTERNATIONAL CONTRACTING COMPANY P.O. BOX 4310, RIYADH 11491, SAUDI ARABIA TEL.: +966 11 4776700 FAX: +966 11 4774737 www.ayarstructures.com SHEET TITLE: WATERTANK FLANGES LAYOUT ( BASEMENT-05 ) AUTOCAD BY NAME CHECK BY ARCH ENG. CHECK BY STRUCTURAL ENG. CHECK BY MECHANICAL ENG. CHECK BY ELECTRICAL ENG. JLG SIGNED DATE 15 Sept. 2024 DISCIPLINE: SCALE: NTS Dwg. No. AT-AICC-MECH-SD-WS-204 Rev. 00