Shoring Evaluation Matrix No. 1 2 3 4 5 Shoring Type Section in Drawing Configuration Importance Scale: 1 = Low, 2 = Medium, 3 = High Contiguous piles with tie‐back Section A‐A, About 60 – 70 cm contiguous piles separated 5cm at their anchors Approach‐ edges. The piles are 01 embedded into the soil below the excavation level and supported by one line of tie‐ back anchors. Contiguous piles without tie‐ Section A‐A, About 70 – 80 cm contiguous piles separated 5cm at their back anchors – Cantilever type Approach‐ edges. The piles are 02 embedded in the soil below the excavation level and acting as cantilever. Solider piles Section A‐A, Steel H sections at 2.0 – 2.5 m with tie‐back‐anchor at the Approach‐ top of the piles to support RC 03 panels. Soil nails Braced system Advantages ‐ Less pile diameter and embedded length into the soil than type No. 2. ‐ No work outside the property limit. ‐ Temporary shoring could be reused Section A‐A, Approach‐ 04 Soil nails are inserted into an inclined surface of the retained soil. Shotcrete and wire mesh are applied to the surface of the slope for protection. ‐ Relatively low cost Section B‐B Internal bracing is used rather than the tie‐back‐anchors to provide lateral support for the shoring. ‐ Less pile diameter and embedded length in the soil than type No. 2. ‐ No work outside the property limit Note: Lowest: Mark = 1, Highest: Mark = 10 Total Mark = Σ Importance scale * Mark ‐The figures set forth on the above Table shall be checked and confirmed by the shoring contractor. Disadvantages ‐ Needs authority approval for the extension of tie‐back anchors outside the property limit. ‐ Relatively long time of construction ‐ More material cost ‐ Needs authority approval for the extension of tie‐back anchors outside the property limit ‐ Takes long construction time. ‐ Needs authority approval for the extension of the nails. ‐ Takes long construction time ‐ Not extensively used in the market ‐ Adjacent structure should be flexible. ‐ Bracing Impede somewhat the excavation. ‐ Needs 2 sides (parallel or inclined) facing each other to provide the stability Special conditions 2 Issuing approval from authority 3 6 6 4 9 105 9 8 8 10 9 130 9 5 7 4 4 5 93 9 5 3 4 4 4 78 9 7 8 7 10 10 139 Mater ial cost Construc tability Extensive use in the market Construc tion time 3 2 3 8 6 5 Total Marks 3