ReSet Data Saudi Aramco 7904 (08/06) Page 1 of 3 eMail Data... NONMATERIAL REQUIREMENTS FOR METAL-CLAD SWITCH GEAR – HIGH VOLTAGE ITEM/TAG NUMBERS:_________________________________________________________________ ___________________________________________________________________________________ Save Data... REV. ______________________ DATE: ______________________ DEVELOPMENT NO. REQUISITION/PURCHASE ORDER NO. COPIES AS INDICATED IN COLUMN 1 MUST BE FURNISHED WITH BIDDER'S QUOTATION. COPIES AS INDICATED IN COLUMN 2 MUST BE FURNISHED ON DATES AS INDICATED. (DATES CALCULATED BY BUYER AS PART OF WRITTEN PURCHASE ORDER ARE BASED ON SUCCESSFUL BIDDER'S QUOTE AND INCLUDE PROVISIONS FOR MAILING TIME.) BIDDER PROMISES THAT IN THE EVENT A PURCHASE ORDER IS AWARDED TO HIM, HE WILL SUBMIT REQUESTED COPIES AS STATED IN COLUMN 2 WITHIN NUMBER OF CALENDAR WEEKS AS INDICATED IN COLUMN 5 AFTER HIS RECEIPT OF PURCHASE ORDER. SEE THE ATTACHMENT TO THIS SHEET FOR EXPLANATION OF PRIORITY CODES. 3 HARD COPIES NOTE: 4 DESCRIPTION 601. 602. PRELIMINARY DRAWINGS FOR REVIEW AND APPROVAL BY BUYER 1. COMPOSITE ENGINEERING – SUB-VENDOR MATERIAL PROCUREMENT/ MANUFACTURING/TESTING SCHEDULE 2. FOUNDATION LOADING, ANCHOR BOLT LOCATION AND/OR BASE TIE DOWN DIMENSIONS AND DETAILS AS APPLICABLE 3. DIMENSIONED DRAWING OF BUS DUCT CONNECTION TO BUYER'S TRANSFORMER (AS APPLICABLE) 4. PLAN ELEVATION AND SECTION GENERAL ARRANGEMENT DRAWINGS 5. COMPOSITE AND OUTLINE COMPONENT ARRANGEMENT DRAWING, INCLUDING BUS DUCT AND/OR CABLE ENTRY ARRANGEMENTS AS APPLICABLE 6. SPECIFICATION AND DATA SHEETS 7. POWER AND/OR CONTROL SCHEMATIC DIAGRAMS 8. CONTROL PANEL AND/OR GAS MANIFOLD ARRANGEMENT AND DETAIL DRAWINGS AS APPLICABLE CERTIFIED DRAWINGS, LITERATURE, PHOTOGRAPHS, ETC. 1. FOUNDATION LOADING, ANCHOR BOLT LOCATION AND/OR BASE TIE DOWN DIMENSIONS AND DETAILS AS APPLICABLE 2. PLAN ELEVATION AND SECTIONAL GENERAL ARRANGEMENT DRAWINGS 3. COMPOSITE OUTLINE AND COMPONENT ARRANGEMENT DRAWING INCLUDING BUS DUCT AND/OR CABLE ENTRY ARRANGEMENT AS APPLICABLE 4. SPECIFICATION AND DATA SHEETS 5. POWER AND/OR CONTROL SCHEMATIC DIAGRAMS 6. CONTROL PANEL AND/OR GAS MANIFOLD ARRANGEMENT AND DETAIL DRAWINGS AS APPLICABLE 7. CURRENT TRANSFORMER, POTENTIAL TRANSFORMER, PROTECTIVE RELAY SPECIFICATIONS, CHARACTERISTIC CURVE, ACCURACY CLASSIFICATION, ETC. 8. BILL OF MATERIALS 9. NAMEPLATE DATA NOTES: (A) PURCHASE ORDER NUMBER AND ITEM/TAG NUMBER MUST BE NOTED ON ALL DATA SUBMITTED. (B) IDENTICAL ITEMS MAY BE REPRESENTED ON A COMMON DRAWING PROVIDED ITEM/TAG IDENTIFICATION OF THOSE ITEMS ARE CLEARLY SHOWN. (C) WHEN DRAWINGS ARE RETURNED "APPROVED" OR "APPROVED EXCEPT AS NOTED," THE VENDOR MAY START FABRICATION. WHEN DRAWINGS ARE RETURNED "DISAPPROVED," THE VENDOR SHOULD NOT START FABRICATION. THE VENDOR MUST RESUBMIT CORRECTED DRAWINGS FOR APPROVAL WITHIN TWO (2) WEEKS. (D) THE NOTES ON THE ATTACHMENT TO THIS SHEET ARE A PART OF NONMATERIAL REQUIREMENTS AND CONSEQUENTLY OF THE PURCHASE ORDER. (E) NORMALLY ONLY THREE HARD COPIES AND ONE SOFT COPY ARE REQUIRED. 5 6 SUBMITTAL OF REQUIRED DRAWINGS, MANUALS, ETC. BIDDER TO COMPLETE COLUMN 5 AND RETURN COMPLETED FORM WITH HIS QUOTATION. PRIORITY 2 SOFT COPY COPIES REQUIRED 1 NO. OF CALENDAR WEEKS DUE DATES 1 1 2 1 1 1 1 1 2 2 2 2 2 2 2 3 BIDDER'S SIGNATURE: COMPANY:_______________________________________ BIDDER'S REF. NO.:_________________________________ DATE:_____________________________________________ Saudi Aramco 7904 (08/06) Page 2 of 3 NONMATERIAL REQUIREMENTS FOR METAL-CLAD SWITCH GEAR – HIGH VOLTAGE ITEM/TAG NUMBERS:_________________________________________________________________ ___________________________________________________________________________________ REV. ______________________ DATE: ______________________ DEVELOPMENT NO. REQUISITION/PURCHASE ORDER NO. COPIES AS INDICATED IN COLUMN 1 MUST BE FURNISHED WITH BIDDER'S QUOTATION. COPIES AS INDICATED IN COLUMN 2 MUST BE FURNISHED ON DATES AS INDICATED. (DATES CALCULATED BY BUYER AS PART OF WRITTEN PURCHASE ORDER ARE BASED ON SUCCESSFUL BIDDER'S QUOTE AND INCLUDE PROVISIONS FOR MAILING TIME.) BIDDER PROMISES THAT IN THE EVENT A PURCHASE ORDER IS AWARDED TO HIM, HE WILL SUBMIT REQUESTED COPIES AS STATED IN COLUMN 2 WITHIN NUMBER OF CALENDAR WEEKS AS INDICATED IN COLUMN 5 AFTER HIS RECEIPT OF PURCHASE ORDER. SEE THE ATTACHMENT TO THIS SHEET FOR EXPLANATION OF PRIORITY CODES. 3 NOTE: 4 DESCRIPTION 602. CONTINUED 10. CONNECTION AND INTERCONNECTION DIAGRAMS WITH TERMINAL IDENTIFICATION 11. CABLE AND/OR BUS DUCT TERMINATION DETAILS (AS APPLICABLE) 12. PRICE LIST OF SPECIAL TOOLS AND DEVICES REQUIRED FOR INSTALLATION OR MAINTENANCE 603. OPERATIONS/MAINTENANCE MANUALS, INSTALLATION INSTRUCTIONS, TEST CERTIFICATES, ETC. 1. INSTALLATION AND ERECTION INSTRUCTIONS 2. CERTIFIED TEST REPORTS, CERTIFICATES, DATA AND CURVES 3. OPERATING INSTRUCTIONS 4. MAINTENANCE MANUAL OR INSTRUCTIONS NOTES: (A) PURCHASE ORDER NUMBER AND ITEM/TAG NUMBER MUST BE NOTED ON ALL DATA SUBMITTED. (B) IDENTICAL ITEMS MAY BE REPRESENTED ON A COMMON DRAWING PROVIDED ITEM/TAG IDENTIFICATION OF THOSE ITEMS ARE CLEARLY SHOWN. (C) WHEN DRAWINGS ARE RETURNED "APPROVED" OR "APPROVED EXCEPT AS NOTED," THE VENDOR MAY START FABRICATION. WHEN DRAWINGS ARE RETURNED "DISAPPROVED," THE VENDOR SHOULD NOT START FABRICATION. THE VENDOR MUST RESUBMIT CORRECTED DRAWINGS FOR APPROVAL WITHIN TWO (2) WEEKS. (D) THE NOTES ON THE ATTACHMENT TO THIS SHEET ARE A PART OF NONMATERIAL REQUIREMENTS AND CONSEQUENTLY OF THE PURCHASE ORDER. (E) NORMALLY ONLY THREE HARD COPIES AND ONE SOFT COPY ARE REQUIRED. 5 6 SUBMITTAL OF REQUIRED DRAWINGS, MANUALS, ETC. BIDDER TO COMPLETE COLUMN 5 AND RETURN COMPLETED FORM WITH HIS QUOTATION. PRIORITY HARD COPIES 2 SOFT COPY COPIES REQUIRED 1 NO. OF CALENDAR WEEKS DUE DATES 2 2 2 3 3 3 3 BIDDER'S SIGNATURE: COMPANY:_______________________________________ BIDDER'S REF. NO.:_________________________________ DATE:_____________________________________________ Saudi Aramco 7904 (08/06) Page 3 of 3 CERTIFIED DRAWINGS, LITERATURE AND PHOTOGRAPHS: NOTES GENERAL: 1. The applicable nonmaterial requirement form reference number 601.1 (etc.) must be shown on each document. 2. All drawings and manuals (etc.) must be written in the English language. Unless stated otherwise in the material description or specification of this Quotation Request/Purchase Order, it is preferred that all dimensions and weights must be in the "Le System Internationale D'Unites" (S.I.) metric systems of units. The pound, foot, and second system may be used as an alternative for equipment designed to a nonmetric specification. 3. The drawings and literature (etc.) should not be bound in books or hard covers since they will be incorporated in Plant Record Books. 601 PRELIMINARY DRAWINGS AND DATA FOR REVIEW AND APPROVAL BY BUYER In the event that a purchase order is awarded, Buyer's approval of these drawings is required prior to fabrication of the units covered by such order. 602 CERTIFIED DRAWINGS, LITERATURE, PHOTOGRAPHS, ETC. ALL PRINTS OF FINAL DRAWINGS must be marked or certified to indicate: a. That the drawings are final and that all dimensions and material specifications are identical to those of the material or equipment being supplied by Vendor; b. That no further changes must be made either by Vendor or by Buyer; c. That all revisions requested previously by buyer are included. 603 OPERATIONS, MAINTENANCE MANUALS, INSTALLATION INSTRUCTIONS, TEST CERTIFICATES, ETC. All drawings, documents, manuals, lists or other literature must be clearly marked with Buyer's Purchase Order Number and item number, and manufacturer's serial numbers pertaining to the material or equipment being furnished. SHOPS OR MAINTENANCE MANUALS must include: a. Dimensions of mating surfaces; b. Tolerances applied to dimensions; c. Clearance between moving surfaces; d. Instructions for maintenance, disassembly, repair, overhaul and assembly; e. System of trouble detection and remedy. PRIORITY CODES 1. Required as soon as possible after receipt of purchase order. 2. Required as soon as possible after receipt of buyer's comments on preliminary drawings and specifications (etc.) catalog information, detailed drawings of sub-vendors and parts data. 3. Required as soon as possible after receipt of all non-material requirements covered by item 602 and after final inspection and testing.