REPUBLIC OF THE PHILIPPINES OFFICE OF THE CITY MAYOR QUEZON CITY (BUILDING OFFICIAL) DO NOT FILL UP (NSO USE ONLY) APPLICATION NO. PERMIT NO. BUILDING PERMIT DATE OF APPLICATION DATE ISSUED ORIGINAL RENEWAL BOX 1 (TO BE ACCOMPLISHED BY DESIGNING ARCHITECT / CIVIL ENGINEER IN PRINT) OWNER LASTNAME FIRSTNAME FOR CONSTRUCTION OWNED BY AN ENTERPRISE FORM OF OWNERSHIP M.I. TAX ACCT. NO. MAIN ECONOMIC ACTIVITY OF BUSINESS ADDRESS TEL. NO. LOCATION OF CONSTRUCTION SCOPE OF WORK: OTHERS (SPECIFY) 1. NEW CONSTRUCTION 2. ADDITION OF _____________________ 3. REPAIR OF ________________________ 4. RENOVATION OF __________________ 5. DEMOLITION OF ___________________ USE OR TYPE OF OCCUPANCY RESIDENTIAL 11 SINGLE 12 DUPLEX 13 ROWHOUSE / ACCESSORIA 10 OTHERS (SPECIFY)____________________ 6. __________OF______________ 7. __________OF______________ INDUSTRIAL 31 FACTORY (PLANT) 32 REPAIR SHOP, MACHINE SHOP 33 REFINERY 34 PRINTING PRESS 35 WAREHOUSE 30 OTHERS (SPECIFY)____________________ COMMERCIAL 21 BANK 22 STORE 23 HOTEL / MOTEL, ETC. 24 OFFICE CONDOMINIUM / BUSINESS OFFICE BUILDING. INSTITUTIONAL 26 SHOP (e.g. DRESS SHOP, TAILORING SHOP, BARBER SHOP, ETC. 41 SCHOOL 42 CHURCH OR OTHER RELIGIOUS STRUCTURES 43 HOSPITAL OR SIMILAR STRUCTURES 27 GASOLINE STATION 44 WELFARE & CHARITABLE STRUCTURES 28 MARKET 45 THEATER, AUDITORIUM. GYMNASIUM, COURT 29 DORMITORY OR OTHER LODGING HOUSE 40 OTHERS (SPECIFY)____________________ 25 RESTAURANT, ETC.. 30 OTHERS (SPECIFY)____________________ OTHER CONSTRUCTION 60 (SPECIFY)____________________ AGRICULTURAL 41 BRAN(S), POULTRY HOUSE(S), ETC. 42 GRAIN MILL 40 OTHERS (SPECIFY)____________________ www.quezoncity.gov.ph OFFICE OF THE BUILDING OFFICIAL STREET FURNITURE, LANDSCAPING & SIGNBOARDS 71 PARK, PLAZA’S, MONUMENT, POOLS, PLANT BOXES, ETC. 72 SIDEWALKS, PREMONADES, TERRACES, LAMPPOSTS, ELECTRIC POLES, TELEPHONE POLES, ETC. 73 OUTDOOR ADS, SIGNBOARDS, ETC. 74 FENCE ENCLOSURE BOX 2 (TO BE ACCOMPLISHED BY RECEIVING & RECORDING SECTION) BUILDING DOCUMENTS (FIVE SETS EACH) SITE DEVELOPMENT & LOCATION PLAN ARCHITECTURAL PLAN & SPECIFICATIONS STRUCTURAL DESIGN & COMPUTATIONS SANITARY/PLUMBING PLANS & SPECIFICATIONS MECHANICAL PLANS & SPECIFICATIONS LOGBOOK (1COPY) OTHERS (SPECIFY) ELECTRICAL PLANS & SPECIFICATION BOX 3 (TO BE ACCOMPLISHED BY THE BUILDING OFFICIAL) ACTION TO BE TAKEN: PERMIT IS HEREBY GRANTED SUBJECT TO THE FOLLOWING CONDITIONS 1. THAT THE PROPOSED CONSTRUCTION/ADDITION/REPAIR/RENOVATION/ DEMOLITION/INSTALLATION ETC SHALL BE IN CONFORMITY WITH THE NATIONAL BUILDING CODE (PD 1096) AND ITS CORRESPONDING IMPLEMENTING RULES AND REGULATIONS 2. THAT A DULY LICENSED ARCHITECT/CIVIL ENGINEER HAS BEEN ENGAGED TO PLANS AND SPECIFICATIONS AND TO UNDERTAKE THE SUPERVISION/INSPECTION OF THE CONSTRUCTION OF THE PROJECT ENGR. ISAGANI R. VERZOSA JR. LOCAL BUILDING OFFICIAL 3. THAT A CERTIFICATE OF COMPLETION DULY SIGNED AND SEALED BY THE DESIGNING ARCHITECT / ENGINEER IN-CHARGE OF CONSTRUCTION SHALL BE SUBMITTED NOT LATER THAN SEVEN (7) DAYS AFTER COMPLETION OF THE CONSTRUCTION OF THE PROJECT 4. THAT A CERTIFICATE OF OCCUPANCY “SHALL BE SECURED PRIOR TO ACTUAL OCCUPANCY OF THE BUILDING. NOTE: THIS PERMIT MAY BE CANCELLED OR REVOKED PURSUANT TO SECTIONS 305 & 306 OF THE “NATIONAL BUILDING CODE”. DATE BOX 3A (TO BE ACCOMPLISHED BY THE DESIGNING ARCHITECT/CIVIL ENGINEER IN PRINT BUILDING P_____________ COST OF EQUIPMENT INSTALLED ELECTRICAL P_____________ P____________ MECHANICAL P_____________ PROPOSED DATE OF CONSTRUCTION _____________ P____________ PLUMBING P_____________ EXPECTED DATE OF COMPLETION _______________ OTHERS P_____________ TOTAL COST P_____________ TOTAL ESTIMATED COST P____________ DO NOT FILL (NSO USE ONLY) NUMBER OF STOREYS___________ TOTAL FLOOR AREA____________ MATERIAL OF CONST. ____________ (WOOD, CONC, STEEL, MIXED) BOX 4 (TO BE ACCOMPLISHED BY THE DIVISION CONCERNED ASSESED FEES AMOUNT DUE ASSESSED BY O.R. NUMBER DATE PAID LAND USE / ZONING LINE and GRADE BUILDING PLUMBING ELECTRICAL MECHANICAL OTHERS REVIEWED: TOTAL CHIEF, PROCESSING DIVISION SECTION BOX 5 (TO BE ACCOMPLISHED BY THE DIVISION CONCERNED PROGRESS FLOW NOTED: IN CHIEF, PROCESSING DIVISION TIME OUT DATE TIME ACTION / REMARKS DATE PROCESSED BY: RECEIVING and RECORDING LAND USE and ZONING GEODETIC (LINE and GRADE) ARCHITECTURAL STRUCTURAL SANITARY ELECTRICAL MECHANICAL WE HEREBY AFFIX OUR HANDS SIGNIFYING OUR CONFORMITY TO THE INFORMATION HEREIN ABOVE SETFORTH BOX 8 www.quezoncity.gov.ph SIGNATURE OFFICE OF THE BUILDING OFFICIAL BOX 6 ARCHITECT / CIVIL ENGINEER PRC REG. NO. SIGNED AND SEALED PLANS & SPECIFICATIONS PRINT NAME ADDRESS COMMUNITY TAX CERT. PTR NO. PTR NO. PTR NO. PLACE ISSUED PLACE ISSUED SIGNATURE WITH MY CONSENT: BOX 9 (TO BE ACCOMPLISHED BY LOT OWNER) BOX 7 ARCHITECT / CIVIL ENGINEER IN CHARGE OF CONSTRUCTION PRC REG. NO. TCT / OCT NO. PRINT NAME PRINT NAME OF LOT OWNER ADDRESS ADDRESS PTR NO. SIGNATURE PTR NO. PLACE ISSUED COMMUNITY TAX RECEIPT DATE ISSUED SIGNATURE PLACE ISSUED