Republic of the Philippines OFFICE OF THE CITY BUILDING OFFICIAL BAGUIO CITY APPLICATION NO. APPENDIX B DO NOT FILL UP (NSO USE ONLY) PERMIT NO. BUILDING PERMIT Date of Application ORIGINAL Date Issued RENEWAL BOX 1(TO BE ACCOMPLISHED BY DESIGNING ARCHITECT /CIVIL ENGINEER IN PRINT) OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN USE OR TYPE OF OCCUPANCY RESIDENTIAL INDUSTRIAL 11 SINGLE 31 FACTORY/PLANT FOR CONSTRUCTION OWNED FORM OF OWNERSHIP MAIN ECONOMIC ACTIVITY/KIND OF BUSINESS 12AN DUPLEX 32 REPAIR SHOP/MACHINE SHOP BY ENTERPISE 13 ROWHOUSE/ACCESORIA 33 REFINERY ADDRESS: 10 OTHER (SPECIFY ) 34 PRINTING SHOPTELEPHONE NO. 35 WAREHOUSE LOCATION OF CONSTRUCTION: 30 OTHER ( SPECIFY) COMMERCIAL INSTITUTIONAL SCOPE OF WORK 21 BANK 41 SCHOOL 1. NEW CONSTRUCTION OTHER ( SPECIFY) 22 STORE 42 CHURCH AND OTHER RELIGIOUS STRUCTURE 2. ADDITION 6. _____________________ OF STRUCTURES __________________ 23 HOTEL/MOTEL,ETC. 42 HOSPITAL OR SIMILAR 3. REPAIR OFFICE OF 7. _____________________ OF __________________ 24 OFFICE/CONDOMINIUM BUILDING 44 WELFARE AND CHARITABLE STRUCTURES 4.RENOVATION OF 25 RESTAURANT,ETC 45 THEATER, AUDITORIUM, GYMNASIUM, COURT 5. DEMOLITION OF NUMBER OF(SPECIFY) UNITS ______________________ 26 SHOP (e.g. DRESS SHOP, TAILORING,BARBER SHOP, etc. 40 OTHER 27 GASOLINE STATION 28 MARKET AGRICULTURAL 29 DORMITORY OR OTHER LODGING HOUSE 51 BARN(S), POULTRY HOUSE(S), ETC. 20 OTHERS (SPECIFY) 52 GRAIN MILL 50 OTHER (SPECIFY) OTHER TYPE OF OCCUPANCY 60 SPECIFY STREET FURNITURE, LANDSCAPING & SIGNBOARDS 71 PARKS, PLAZAS, MONUMENT, POOLS, PLANT BOXES,ETC 72 SIDEWALKS, PROMENADES, TERRACES, LAMPOST, ELECTRIC POLES, TELEPHONE POLES,ETC. 73 OUTDOOR ADS, SIGNBOARDS, ETC. 74 FENCE ENCLOSURE BOX 2 (TO BE ASSESSED BY THE RECEIVING AND RECORDING SECTION) BUILDING DOCUMENT (FIVE SETS EACH) SITE DEVELOPMENT AND LOCATION PLAN MECHANICAL PLANS & SPECIFICATION ARCHITECTURE PLAN AND SPECIFICATIONS LOGBOOK ( 1 COPY) STRUCTURAL DESIGN & COMPUTATIONS OTHERS (SPECIFY) ______________________________________ SANITARY/PLUMBING & SPECIFICATIONS ____________________________________________________________ ELECTRICAL PLAN & SPECIFICATIONS BOX (TO BE ACCOMPLSHED BY THE BUILDING OFFICIAL) ACTION TAKEN PERMIT IS HEREBY GRANTED SUBJECT OF THE FOLLOWING CONDITIONS: 1 THAT THE PROPOSED CONSTRUCTION/ADDITION/REPAIR/ RENOVATION/DEMOLITION /INSTALLATION, ETC. SHALL BE IN CONFORMITY WITH THE NATIONAL BUILDING CODE (P.D. 1096) AND ITS CORRESPONDING IMPLEMENTING RULES AND REGULATIONS 2 THAT A DULY LICENSED ARCHITECTURE/CIVIL ENGINEER HAS BEEN ENGAGED TO PREPARE PLANS AND SPECIFICATION AND TO UNDERTAKE THE SUPERVISION/INSPECTION OF THE CONSTRUCTION OF THE PROJECT. 3 THAT A CERTIFICATION OF COMPLETION DULY SIGNED AND SEALED BY THE DESIGNING ARCHITECT/ENGINEER AND THE ARCHITECT/ ENGINEER IN-CHARGEOF CONTRUCTION SHALL BE SUMBITTED NOT LATER THAT SEVEN (7) DAYS AFTER COMPLETION OF THE CONSTRUCTION OF THE PROJECT. 4 THAT A “CERTIFICATE OF OCCUPANCY” SHALL BE SECURED PRIOR TO ACTUAL OCCUPANCY OF THE BUILDING. ______________________________ Building Official Date: ______________ NOTE: THIS PERMIT MAY BE CANCELLED OR REVOKED PURSUANT TO SECTION 305 & 306 OF THE “NATIONAL BUILDING CODE”. To be accomplished in five (5) copies, one each for: applicant (original), Assessor, National Statistics Office, Building Official, Fire Department BOX 3A (TO BE ACCOMPLISHED BY DESIGNING ARCHITECT/CIVIL ENGINEER IN PRINT TOTAL ESTIMATED COST COST OF NO. OF STOREYS EQUIPMENT TOTAL FLOOR BUILDING P INSTALLED AREA ELECTRICAL P P PROPOSED DATE MECHANICAL P P OF CONSTRUCTION PLUMBING P P MATERIALS OF CONST. OTHER P (WOOD ,CONC,STEEL,MIXED) TOTAL COST P BOX 4 (TO ACCOMPLISHED BY THE DIVISION/SECTION CONCERNED) This study source was downloaded by 100000858959215 from CourseHero.com on 12-16-2022 07:31:16 GMT -06:00 ASSESSED FEES AMOUNT DUE ASSESSED BY O.R NUMBER https://www.coursehero.com/file/65644538/Building-Permit-Application-Formdocx/ DATE PAID DO NOT FILL (NSO USE ONLY) LINE & GRADE BUILDING PLUMBING ELECTRICAL MECHANICAL ELECTRONICS SIGN FENCING DEMOLITION EXCAVATION Inspection Fee Admin Fine Surcharge REVIEWED BY: CHIEF, PROCESSING DIVISION/SECTION TOTAL WE HEREBY AFFIX OUR HANDS SIGNIFYING OUR CONFORMITY TO THE INFORMATION HEREIN ABOVE SETFORTH. BOX 8 BOX 6 BOX 5 (TO BE ACCOMPLISHED BY THE DIVISION/SECTION CONCERNED) PROGRESS FLOW NOTED: IN OUT CHIEF ,PROCESSING DIVISION TIME DATE TIME DATE ACTION/ REMARKS PROCESSED BY RECEIVING and RECORDING LAND USE and ZONING GEODETIC (LINE &GRADE) ARCHITECTURAL STRUCTURAL SANITARY/PLUMBING ELECTRICAL MECHANICAL ARCHITECT/CIVIL ENGINEER SIGNED AND SEALED PLANS & SPECIFICATION PRC REG. NO. PRINT NAME ADDRESS SIGNATURE BOX 7 ARCHITECT/CIVIL ENGINEER IN-CHARGE OF CONSTRUCTION PRC REG.NO. TCT/OCT NO. PRINT NAME SIGNATURE PRINT NAME OF LOT OWNER ADDRESS ADDRESS APPLICANT PTR NO. DATE ISSUED WITH MY CONSENT SINATURE PALCE ISSUED TIN COMMUNITY TAX CERT. COMMUNITY TAX CERT SIGNATURE BOX 9 (TO BE ACCOMPLISHED BY LOT OWNER) This study source was downloaded by 100000858959215 from CourseHero.com on 12-16-2022 07:31:16 GMT -06:00 https://www.coursehero.com/file/65644538/Building-Permit-Application-Formdocx/ Powered by TCPDF (www.tcpdf.org) DATE ISSUED PLACED ISSUED